Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.5 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹34.0 L+₹4.5 L (15.1%)Rejected-Finance D NO LIG 98 RAJEEV NAGAR KURMANNAPALEM VISAKHAPATNAM 530 048 | VISAKHAPATANAM | ANDHRA PRADESH | 530048 | L2 | Rejected-Finance Being not L1 | |
| 3 | L3₹35.9 L+₹6.3 L (21.5%)Rejected-Finance | L3 | Rejected-Finance Being not L1 |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
9 Mar 2022, 6:00 pmClosed
Garrison Engineer Utility-I
Garrison Engineer Utility-I Near Samudrika Naval Base Post Visakhapatnam -530 014
REPAIRS AND DEHYDRATION OF TRANSFORMER OILS, MAINTENANCE OF TRANSFORMERS OF VARIOUS CAPACITY AND MAINT OF RMUS AT VARIOUS POCKETS OF DOLPHIN HILL AREA UNDER GE(U-I) VISAKHAPATNAM
2022_MES_506954_1
8401/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Garrison Engineer Utility-I Visakhapatnam
CLASS D
8 documents required · 8 mandatory
₹500
Garrison Engineer Utility-I
₹98,000
Yes
23 Mar 2022
9 Feb 2022
10 Mar 2022
9 Feb 2022
9 Mar 2022
24 Feb 2022
Amount
M&L for disconnecting carefully electrical connection from both HT/ LT (primary & secondary) sides of the transformer, keeping them at safe side the transformer indoor/ outdoor type of capacity from 63 KVA to 1250 KVA , 11 KV/ 0.433 KV, step down any make for carrying out refaxing after completion of minor repairs like maintenance / replacement of HT/LT bush, metal rods, lugs, replacement of rusted unbolts etc. incl cheking the continuity of HT/LT windings , top cover opening, prevent the all oil leakages, provn of new insulated gaskets / cork sheet for HT/LT supply etc. complete all as specefied and directed. Note : Porcelain bushings, gun metal rods, cable end joint kit, transformer oil etc. to be measured and paid separatly under respective schedules.
M&L for lifting, transporting, handling of the transformer from work site to the workshop / factory inch necessary tools , plants and return back to work site / MES yard / MES store, lifting, handling safely to custody etc. after rectifing faults/rewinding /repair / maintenance etc. complete all as specified and directed by Engr-in-charge.
M&L for re-windings of HT distribution transformers of any capacity/ size/ type by strip opening of HT coils (i.e. Primary coils) from core assembly safely, unwinding the HT (i.e. Primary coils) complete, removing the old defective insulation paper, rewinding with new copper wire of same gauge and existing size together with new DPC insulation to the copper conductor, varnishing of the windings including heating/ drying/ backing complete carefully and thoroughly inside the heating chamber at suitable temperature to obtain required value of insulation resistance , Testing Commissioning the transformer and recording the test results etc. complete all as directed by Engr-in- charge.
M&L for re-windings of LT distribution transformers of any capacity/ size/ type by strip opening of LT coils (i.e. Secondary coils) from core assembly safely, unwinding the LT (i.e. Secondary coils) complete, removing the old defective insulation paper, rewinding with new copper wire of same gauge and existing size together with new DPC insulation to the copper conductor, varnishing of the windings including heating/ drying/ backing complete carefully and thoroughly inside the heating chamber at suitable temperature to obtain required value of insulation resistance , Testing Commissioning the transformer and recording the test results etc. complete all as directed by Engr-in- charge.
M&L for re-insulating of LT strip of transformers of any capacity/ type by insulating with copper strip as per same gauge and existing size together with new insulated materials/ bracings before placing in to the transformer and assembling the coil with new insulation and fitting the coils in the chamber, testing and commissioning the transformer complete all as directed.
Filtration of transformer oil of transformers / FRMUs installed at various locations to achieve di-electric strength not less than 60 KV at 2.5mm gap as per relevant IS with portable filtration plant, testing of the oil for the di-electric strength before filtration and after filtration complete all as directed by the Engineer-in-Charge.
Supply and topping up of transformer oil with di-electric strength not less than 60 KV in to the conservator tank/ body tank of the transformer/ OCB/ FRMUs etc. at various locations complete all as directed by the Engineer-in-Charge. [Make: Power oil/ Transol/ Savita Chemicals]
M&L for replacement of the LT porcelain bushings complete of following capacity distribution transformers of existing transformer make/ size/ type all as directed including dismantling old one.
(a) Above 500 KVA
(b) Up to 500 KVA
M&L for replacement of the HT porcelain bushings complete of following capacity distribution transformers of existing transformer make/ size/ type all as directed including dismantling old one.
(a) Above 500 KVA
(b) Up to 500 KVA
M&L for replacement of the HT bushing with gun metal rod with threading & of suitable length/ size all as per existing including metal rings/ bolts/ washers/ rubber rings etc. complete of following capacity distribution transformers of any make/ size/ type all as directed including dismantling old one.
(a) Up to 500 KVA
(b) 500KVA to 1600 KVA
M&L for replacement of the LT bushing with gun metal rod with threading & of suitable length/ size all as per existing including metal rings/ bolts/ washers/ rubber rings etc. complete of following capacity distribution transformers of any make/ size/ type all as directed including dismantling old one.
(a) Up to 100 KVA
(b) 160KVA to 200 KVA
(c) 250 KVA to 315 KVA
(d) 400 KVA to 500 KVA
(e) 630KVA to 750 KVA
M&L for preparation of old painted surfaces of transformers with coarse cloth/ brush and painting throughout externally on exposed surfaces with two coats of smoke grey colour synthetic enamel paint including complete including one coat of white wash for base foundation all as specified and directed by Engineer-in-charge for the following capacity in-door/ out-door type transformer:-
(a) Up to 100 KVA
(b) 160KVA to 200 KVA
(c) 250 KVA to 315 KVA
(d) 400 KVA to 500 KVA
(e) 630KVA to 750 KVA
M&L for replacement of Silica gel breather assembly complete with breather unit and silicagel including connecting with proper necessary gaskets if necessary, including removing the unserviceable breather assembly.
(a) 630 kVA to 1600 kVA
(b) 315 kVA to 500 kVA
(c) up to 250 KVA
(d) 2500 KVA to 5000 KVA
Supply and filling Silica gel to the transformer breather of transformer including removing the unserviceable silica gel
Supply and fix in repairs off load tap changer assembly suitable for any make with 7 tapping position including opening top cover, conservator etc.
(a) 500 kVA to 1250 kVA
(b) up to 400 KVA
Supply of 11 kV CT, epoxy cast, current rating with minimum primary current 150 to 300 A, single/ double ratio, triple core (Protection core-5P10, PS class & Metering core- Class 1.0), 25 KA for 1 sec , with minimum 15VA Burden complete all as directed.
Dismantling of existing 11 kV CT's from Panel , Installation of supplied CT's & Commissioning by checking of current transformer by primary injection up to 50/100A complete all as directed.
Supply and replace FCBC 110v DC/20A battery charger made of carbon steel duly powder coated finish, contineously weded and ground smooth, concealed door hinges, locking mechanism with key/padlocking handle, oil resistant gasket including taking down old rusted Cabinet complete all as specified and directed by Engr-in-Charge. Make: Amaraja/Soft Power Solutions/Alan
Supply and fixing of battery bank 108 V , ( Set of 9 VRLA Battery 12 V, 100AH Each ) with suitable MS rack duly painted complete all as specified and directed. (Make of Battery: Amaraja/Exide)
Dismantling Existing earthing and providing new maintenance free Chemical earthing complete with 40mm x 3000mm Advance Chemical Earthing Pipe (Strip in Pipe Technology) with 50 Kgs of Back Fill Compound buried directly in ground (Rocky soil) with earth pit not less than 2.5 Mtr deep below the normal ground level with top edge of plate not less than1.5 Mtr above normal GL connected to existing GI/Cu strip by means of SS bolts,nuts,check nuts and washers all as per IS 3043-1987 inside supllied 500X500X250 mm HDPE earth pit cover (IEC 62561-5) all as specified or indicated including testing on completion and as directed. The earth resistance shall be measured using fall of potential method as per para 37 of IS:3043 & Combined resistance should be less than 1 Ohms. (Note:-The unit rate shall be deemed to include for Excavation & earth work in any type of soil and Placing 500X500X250 mm HDPE earth pit cover (IEC 62561-5)
Inspection, testing, servicing and overhauling of Factory made 11 KV, 630 Amps, 21 kA for 3 Seconds, SF6 Insulated, Motorized, Outdoor RMU Consisting of 2 Nos VCB Incoming and any no Outgoing Feeders and testing on completion comprising the following all as directed by Eng-in- charge :-
(a) Preliminary inspection of 11 KV MV GIS , SF6 Switch gear for any defects. (b)Testing of CTs:- (i) IR test (ii) Ratio test (iii) Winding resistance test (c) Testing of PTs:- (i) IR test (ii) Ratio test (iii) Polarity test.
(d) Servicing on GIS Switch gear panels :- (i) Cleaning panel (ii) checking the condition of SF6 gas (iii) IR test (iv) HV test. (e) Servicing on VCBs :- (i) IR test (ii) Timing test. (iii) CRM test (iv) HV test (f) Over hauling of breakers for proper functionalling (g) Replacement of minor spares.
Notes: (i)The GIS Switchgear servicing includes (a) Cleaning of GIS for dust, oxidising and decarbonising with CTC. (b) Repair/servicing of spring loaded operating mechanism. (c) Repair/servicing of spring charging motor. (d) Checking, repairing & servicing of gearbox, auxiliary switches, spring, limit switch etc complete. (e) Checking & repairing electrical and mechanical operations (f) Lubrication all moving parts with petroleum jelly & cleaning all bushing insulators with CTC (g) Tightening of all mechanical connections of mechanism (h) Proper Tightening all LV connection of VCB and cable chamber & allied connecting accessories
(ii) The rate quoted shall be deemed to include for necessary T&P, nuts, bolts, washers, gasket, insulation tape, compound, painting of RMU panels with approved colour including lettering details all as per existing etc. (iii) Major spares will be measured and paid separately under relevant items of Schedule 'A'. However the rate quoted shall be deemed to include for any other minor spares require replacement. (iv)Servicing shall be carried out through authorised service personal only and test report shall be submitted in duplicate. (v) Required new components will be measured and paid separately under relevant items.
Supply and fix including dismantling taking out unserviceable Circuit-breaker Trip Coil Kit 24 Vcc/Vdc from RMU of suitable make complete all as specified and directed.
Supply and fix including dismantling taking out unserviceable Circuit-breaker Closing Coil Kit 24 Vcc/Vdc from RMU of suitable make complete all as specified and directed.
Supply and fix including dismantling taking out unserviceable Isolator Switch Position Indication from RMU of suitable make complete all as specified and directed.
Supply and fix including dismantling taking out unserviceable VPIS Standard : 3.3 to 7.7 Kv from RMU of suitable make complete all as specified and directed.
S&F of lithium batteries for RMU IDMT Relay, 1/2AA , 3.6V DC , Make: Tadiran
M&L for powder coat painting for RMU of any size all over body doors, covers etc. Complete all as directed.
Supply and Fixing of Plug in type Bushings 630Amp for Schneider RMU at Cable termination chamber Complete all as directed.
M&L for RMU Tank Cutting , Reassembling by technically expertise personals and SF6 Gas filling at site by using appropriate gas filling equipment Complete all as directed.
Supply, transportation of SF6 Gas cylinder of weight 11 kg for filling at site. SF6 Gas cylinders shall be supplied with an universal type of valve outlet for filling gas in circuit breakers and SF6 gas shall be free from impurities and toxic contents as per the relevant IS specifications. There should not be any contamination or introduction of impurities from defective manufacturing process, leakage in manufacturing plant or contaminations from containing cylinders Complete all as directed.
M&L for 2mm thick fibre reinforced plastic coating with epoxy paint coat of approved color on the surface of panel board, RMUs after cleaning the surfaces thoroughly complete all as directed & specified.
MONITOR ENGINEERING WORKS
B5BUILDING SOLUTIONS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .