Loading…
Loading…
Tender Value
₹3.2 L
EMD Value
₹5,300
Closing Date
28 Aug 2026, 3:00 pm3d left
Ex. Engineer, PMGSY Division Kargil
Ex. Engineer, PMGSY Division Kargil
Construction of 1 X 6 Mtr span RCC Culvert Lamsoo Nallah at Lamsoo Yokmakharboo and culvert 1x5 6 M at Asthana Samonee (at variour spots) under repair and maintenance Block Shakar Chiktan
2026_LRRDA_149285_1
03/EE/PMGSY/Kgl/e-tendering of 2026-27
Open Tender
Civil - Roads and Bridges
Percentage
20 days
SHAKAR CHIKTAN
Please refer Tender documents.
3 documents required · 3 mandatory
₹100
Ex. Engineer, PMGSY Division Kargil
₹5,300
21 Aug 2026
21 Aug 2026
29 Aug 2026
21 Aug 2026
28 Aug 2026
21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by mechanical means (Hydraulic excavator) over are (exceeding 30cm in depth ,1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth-lead upto 50m and lift up to1.5m, as directed by Engineer-in-charge
All Kind of Soil: | 4.9 | Cum | 203 | ₹994.7 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 33.26 | Cum | 6,428 | ₹2,13,795.28 |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete Suspended floors, roofs, landings, balcoonies and access platform, Walls (any thickness) including attached pilasters, butteresses, plinth and string | 53.78 | Sqm | 618 | ₹33,236.04 |
| 4 | Filling available excavated earth/stone n trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 73.06 | Cum | 214 | ₹15,634.84 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.69 MB
BOQ_234876.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].