Renovation of Bank of Baroda Building at Port Louis, Mauritius
NBCC/CPG/BoB/Mauritius/2022/318
NBCC/CPG/BoB/Mauritius/2022/318
Open Tender-Global
Civil Works General
Vadodara, Gujarat
₹11,800
₹19.3 L
11 Feb 2022
11 Feb 2022
11 Mar 2022
11 Mar 2022
1 Apr 2022
Renovation of Bank of Baroda Office Building
MAIN CONTRACT - RENOVATION OF BANK OF BARODA OFFICE BUILDING
VOLUME 1 - Preliminaries & General Requirements
1 General Requirement and Preliminaries (CIVIL) 1 to 42
2 General Requirement and Preliminaries (MEP) 1 to 21
VOLUME 2 - BILLS OF QUANTITIES
3 Builders Work Including External Works & Provisional Sums 1 to 102
4 Mechanical, Electrical & Plumbing Works BoQ 1 to 80
SUB-TOTAL (INCLUSIVE OF VALUE ADDED TAX AT 15%)
TOTAL - TENDER PRICE (INCL. VAT)
TOTAL TENDER AMOUNT IN WORDS (INCL. VAT): ……………………………..…………………………………………………………………………..
GAURAV Digitally signed by GAURAV
RAVINDRA GAIKWAD
GAIKWAD IST
RENOVATIONS TO BANK OF BARODA
MEP INSTALLATIONS
MEP GENERAL CONDITIONS
RENOVATIONS TO BANK OF BARODA
MEP INSTALLATIONS
MECHANICAL, ELECTRICAL, WET SERVICESAND OTHER SERVICE INSTALLATIONS
Testing, Commissioning and Operating of Plant
A In order that the inspections and tests may be carried out in a through and logical
manner, the Contractor shall prepare an itemised check list against which the
installation is to be inspected and tested. The checklist shall be submitted to the
Employer’s Personnel / Engineer for approval prior to the commencement of the
B The checklist shall be completed and certified to the effect that the quality of
installation meets all the requirements of the specifications. Itemised check lists
and test certificates shall be endorsed and submitted as and when completed, to
the Employer’s Personnel / Engineer who might afterwards carry out spot checks
at his own discretion
C The Employer’s Personnel / Engineer may also decide to witness performance
tests being carried out by the Contractor. They should then be informed of the
intention of carrying out such tests at least one week in advance.
D The Employer’s Personnel / Engineer shall at the appropriate time arrange to
carry out acceptance tests on the completed installation or part thereof. If faults
and defects are upon verification discovered in the installation a list of these
shortcomings shall be given to the Contractor who shall forthwith rectify them and
issue a further test certificate endorsed RE-TEST. Subsequent inspections after
the second one which may have to be made by the Employer’s Personnel/
Engineer for the same shortcomings shall be at the expense of the Contractor.
Any list issued to the Contractor, in connection with shortcomings in the
installation shall not be regarded as final, but only as assistance given to the
E The Contractor shall submit full testing and commissioning procedures for each
component and for the entire system.
D The following will be included:-
RENOVATIONS TO BANK OF BARODA
MEP INSTALLATIONS
a) Checking of all safety features of equipment by simulation of overload and
abnormal conditions.
b) Setting of protective devices to stop operation of equipment at overload or
abnormal conditions.;
E Checking of performance of equipment and systems by simulation through the
range of maximum to minimum operating conditions. Relevant parameters
recording of each area shall be made and witnessed by the Employer’s Personnel /
F The Contractor shall also log as part of his commissioning the current measurable
parameters at all required points, to demonstrate that the systems are performing
according to the relevant Standards and Design Parameters. To that effect, all
the necessary instrumentation and sensing points will have been built-in, to
generate simultaneous recordings where this is deemed necessary by the
Employer’s Personnel / Engineer.
G All tests shall be recorded in a field test report for insertion in the operating and
maintenance manual. Values of voltage and amps shall be recorded and marked
on instruments as appropriate.
A The Contractor shall provide all labour, supervision and equipment required for
testing, commissioning and operating the plant. The Employer may assign
RENOVATIONS TO BANK OF BARODA
MEP INSTALLATIONS
operating personnel as observers, but such observation time shall not be counted
as instruction time. The Contractor shall provide fuel oil for the testing and
commissioning of the generators.
B The Contractor’s operator(s) shall be fully conversant with the operation and
experienced in running similar INSTALLATION. The Subcontractor shall train the
Employer’s operator(s) to enable them to be responsible for and capable of
operating the plant.
C The Contractor shall have made due allowance for payment of all services and
utilities that are required for his tests.
D The Employer’s Personnel/ Engineer reserves the right to obtain the services of an
outside firm specializing in such work if, in his opinion, the
Contractor/Subcontractor does not properly, or in the available time, carry out
E The Contractor shall carry out all works using the appropriate tools. He shall also
provide any specialized tool, which in the opinion of the Employer’s Personnel /
Engineer is necessary for carrying out the work properly.
F All tools shall be in perfect condition and safe for operation by the workmen, to
the satisfaction of the Consultant.
G Tools shall be equipped with protecting guards as necessary and working helmets,
gloves, masks, protective goggles and the like shall be provided for the safety of
the working personnel.
H Connection of electric tools to the power supply shall be by means of proper
flexible cable with an earth conductor where required using proper unbreakable
plugs and sockets.
I Extension leads where necessary shall be by means of tough flexible cables of
suitable size for the load to be served and shall be connected to the source of
supply through connection units with compression glands or through heavy duty
plugs and sockets as appropriate.
J Power supply shall be taken from proper site distribution boards provided indoors
or suitably conditioned to withstand adverse atmospheric conditions when
provided outdoors.
A Each tool or equipment shall be served through independent connecting units and
shall be protected against accidental electrocution and short circuits by suitable
human safety units of the appropriate rating and sensitivity such as Residual
Current Circuit Breakers.
RENOVATIONS TO BANK OF BARODA
MEP INSTALLATIONS
B Irrespective of such protection, an efficient earth connection shall be provided.
C Site distribution systems and cables shall always be in perfect condition over the
entire period of the Contract, and any accidental damage to a cable, shall be
efficiently repaired without delay.
Testing Instruments
D The Contractor shall provide all the necessary testing gear for carrying out all
verifications and tests over the entire Contract period and after the completion of
the installation.
E The testing instrument shall be made available whenever required and at short
notice, to the Employer’s Personnel /Engineer.
Site Communication System
F The Contractor shall make available on site to the Employer’s Personnel/ Engineer
as and when requested, a pair of portable radio communicating sets (walky-
talkies) or other appropriate communicating device.
G The sets shall be light and handy and in perfect working condition and shall
provide communicating possibility over the entire Site and/or throughout the
H The sets shall be used at the discretion of the Employer’s Personnel / Engineer
over the contract period but more precisely over the pre-commissioning periods
and when carrying out inspections. After the handing over and during the defects
liability period, the sets shall be made available at short notice as requested by
the Employer’s Personnel / Engineer as above.
Practical Completion of Service Installation Work
A Practical Completion of the service installation works will occur after the
following procedure has been certified by the Employer’s Personnel / Engineer as
having been carried-out in accordance with the specifications:-
RENOVATIONS TO BANK OF BARODA
MEP INSTALLATIONS
1. Physical completion has been reported to the Employer’s Personnel / Engineer
by the Contractor, and all defects make good and the Employer’s Personnel /
Engineer has given approval for “start-up”.
2. “Start-up” has taken place.
3. Commissioning and testing has taken place as specified and test results have
been witnessed (where required), recorded and approved by the Employer’s
Personnel / Engineer.
4. Three sets of “as built” drawings, on plastic foil and on CD have been
furnished to the Employer’s Personnel / Engineer at the time of the Sectional
Taking Over. These shall comprise the “Shop Drawings” as specified above
embodying all modifications made during construction, and further system
diagrams indicating the intended functioning, capacity data and control
functioning of all systems. For these latter drawings, the Contractor may, if
he so desires, obtain plastic negative of the System diagrams for updating if
5. The specified five copies of indexed loose leaf manuals containing complete
Operating and Maintenance Instructions have been furnished to the Engineer
6. The Contract works shall be completed to the entire satisfaction of the
Employer’s Personnel / Engineer and all unused materials, tools, plant,
equipment, temporary buildings which are not the property of the Client,
shall be removed from the site which shall be cleaned of all rubbish and waste
materials and delivered up clean and tidy on or before the scheduled date of
completion but not later than 15 days from the certified date of completion.
Final Completion of the Service Installation Works
A The works shall be considered to have been completed to its Final State only
after the following will have been Ascertained, Recorded or Certified by the
Employer’s Personnel / Engineer or other Representative of the Employer:
RENOVATIONS TO BANK OF BARODA
MEP INSTALLATIONS
1. When so reported formally by the Contractor.
2. When start-up, Testing and Commissioning of the entire works will have fully
taken place as per specifications and test results and certificates will have
been formally issued to the Employer’s Personnel / Engineer in compliance
with the specifications and the relevant Safety Regulations as applicable to
3. When all snags or defects either identified by the Architect / Engineer or by
the Contractor himself as part of his contractual obligations, will have been
attended to, corrected and completed to the full satisfaction of the
Employer’s Personnel / Engineer.
4. When all the sets of Operating/Maintenance/Owners Manuals (where
applicable) and As-Built Drawings/Negatives/Sepias, will have been handed
over to the Consultant who will have prior to such handing over, satisfied
himself that such documentation is in full compliance with the requirements
of the Contract.
5. When the Employer’s Personnel / Engineer will have issued a Final Completion
as deemed opportune and appropriate by him, after being fully satisfied that
the Contract has been totally fulfilled and completed as per the
specifications and the Contract Documentation
6. When all unused materials, tools, plant, equipment, temporary buildings
which are not the property of the Client, will have been removed from the
site, which shall have been cleaned of all rubbish and waste materials and left
in a clean and tidy state, on or before the scheduled Final Date of
Completion, but not later than 15 days after the formal handing over to the
Record Documentation
A The Contractor shall supply to the Employer’s Personnel / Engineer, as a pre-
requisite to the start-up of preliminary handing-over visits comprehensive record
documents already approved by the Employer’s Personnel / Engineer. The
Contractor is advised that great importance will be placed upon quality, accuracy,
clarity and completeness of the record documents and upon their being made
RENOVATIONS TO BANK OF BARODA
MEP INSTALLATIONS
available promptly.
B The Contractor shall demonstrate from time to time, as required by the
Employer’s Personnel / Engineer throughout the execution of the works that
adequate and accurate records are being kept such as will ensure the ultimate
completeness and accuracy of the record documents and that the record
documents are themselves being progressively compiles as the work on site
C The Contractor shall maintain on site a complete set of progress drawings to
indicate the progress and extent of the installation works.
D These drawings shall be up-dated on a weekly basis and shall be available for
inspection by the Employer’s Personnel / Engineer at all times.
E Progress drawings shall be up-dated to indicate complete services works prior to
the covering-up of services by ceiling tiles, ceiling panels, access covers, duct
F Record documents shall comprise the following, all as described in this
Specification:-
a) Operating and Maintenance Manuals
b) As-built drawings
Plantroom Instructions
G Diagrams and Drawings under frame and glass, shall be provided in each
plantroom and shall show in large scale complete outlines of the corresponding
system or service with all devices and components correctly located and identified
with piping and wiring diagrams and layouts clearly and neatly drawn. Full
Operating Instructions of the Plants and Systems shall also be included.
H The diagrams shall state, where applicable, the normal, maximum and minimum
instrument readings, the control points, scale settings, true settings, differential
bands, throttling ranges, time delay and overload settings (actual and scale) and
other relevant variable and adjustable items to permit checking and adjusting of
each instrument, control and motor function.
Operating and Maintenance Manuals
A Four weeks before the date of the preliminary handing-over visits the Contractor
shall hand over a draft copy of each operating and maintenance manual to the
Employer’s Personnel / Engineer for comment.
B The draft copy of each manual shall conform to the required format required by
this specification to enable all relevant comments to be made by the Employer’s
RENOVATIONS TO BANK OF BARODA
MEP INSTALLATIONS
Personnel / Engineer.
C Four copies of the final approved manual are to be provided at each Sectional
Taking Over. Three of these copies shall be passed to the employer’s
maintenance department, who after receiving the manual shall be trained in the
operation and maintenance of the plant by the Contractor.
The manual shall be arranged as follows:-
Part I: Systems
This part shall be sub-divided into the different services shown on the diagrams
and drawings as detailed in the system’s description and specifications and
forming part of the Contract.
The following check list shall be used for indexing and sequencing of the relevant
A. Description Information
1 Function or service
2 Classification and Coding
4 Performance characteristics
5 Principal components
6 Distribution arrangements
7 Schematic diagram
8 Control diagram
9 Equipment data
(a) Manufacturer and model
(b) Size and rating
(c) Pressure, speed and temperature limitations
B. Operating Procedures
1 Starting and stopping procedure.
2 Emergency Shutdown procedure.
3 Abnormal or emergency operating procedures
4 Means and procedures for making safe dangerous plant
5 Operational precautions on known hazards
6 Instructions on fault finding and malfunction or equipment failure
RENOVATIONS TO BANK OF BARODA
MEP INSTALLATIONS
control sequences for all systems installed.
7 Adjustment and regulation
8 Logs and records
PART II: Equipment
This part shall be sub-divided as detailed in the specification. The following
check list shall be used in indexing and sequencing the manufacturer’s
information and results of final test data.
A. Descriptive Literature
1 Catalogue cuts, brochures or shop drawings
2 Dimensional drawings and ‘As-built’ Drawings
3 Materials of construction
4 Parts of designation
B. Operating Characteristics
1 Performance tables, charts or curves and marked operating point or
2 Pressure, temperature and speed limitations
3 Safety devices and settings
C. Operating Instructions
1 Pre-start checklists
2 Start-up procedure
3 Inspection during operation
4 Adjustment and regulation
5 Testing
6 Detection signals
D. Inspection Instruction and Procedures
1 Normal and abnormal temperatures, pressure and speed limits.
2 Schedule and manner of operation
3 Detection signals
E. Maintenance and Instructions and Procedures
1 Schedule of routine maintenance, including detail to frequency of
RENOVATIONS TO BANK OF BARODA
MEP INSTALLATIONS
inspection, examinations, test and maintenance to keep equipment in a
safe and efficient working order. Guidance shall be given on the nature
of deterioration and defects to be looked for.
2 Procedure for dismantling and re-assembly, replacements, adjustments,
calibration, part testing, identification list, special tools, test
equipment & auxiliary services, hazards and precautions to be taken
and fault finding routines.
3 Trouble shooting charts.
F. General Parts Lists
The schedules shall locate and detail the design and actual operating
conditions, detail the replaceable assemblies. Sufficient information
shall be provided to identify each item, together with the source of
supply, ratings, dimensions and appropriate standards. Equipment
schedules shall include the name and address of the manufacturer,
reference number, name and address of supplier, order number, date
of purchase. A separate parts list shall be provided for each item
detailed in the equipment schedule.
G. Spare Parts
1 Essential spares to be stored by building owner.
2 Spares stored by Contractor
H. Supplier Data
I. Maintenance and Service Contracts
J. Site Test Reports
K. Record Drawings and Test Certificates
L. Emergency Measures
If necessary, due to the number of drawings, which have to be included
in the manual, each drawing shall be photographically reduced in size
to suit the manual. The drawings shall be as detailed earlier.
A The manual shall conform to the following minimum standards:-
(a) The covers shall be substantial, of adequate size, distinctive and of sufficient
strength to protect the contents for the life of the installation. The method
of binding shall give a permanent anchorage along the left hand side whilst
allowing the text to be flat without damage to the spine.
RENOVATIONS TO BANK OF BARODA
MEP INSTALLATIONS
(b) The manuals shall be prepared on approved typeface on top quality A4
suitable for direct insertion into the manuals.
(c) The front cover and where appropriate the spine, shall have the following
information clearly displayed in permanent lettering:-
(i) Name of logotype of the Client.
(ii) Name of the building and details of the services included in the manual.
(iii) A volume number where the manual runs to more than one.
(d) The title page shall contain the following:-
(i) Title of the building.
(ii) Services referred to in the manual
(iii) Full name and address of the Client.
(iv) The author’s reference number of the manual.
(v) Date of completion and date of hand-over of the services to the Client.
(vi) Date of issue.
(vii) Name and address of manual author.
(e) The preliminary pages should contain:-
(i) Full name, address and telephone number of the Engineer.
(ii) Full name, address and telephone number of the Contractor and all
Subcontractors.
(iii) Any limitations on the use of the manual.
(iv) Record of amendments to the manual.
(v) Contents list.
(vi) Description of how to use the manual.
(vii) List of all supplementary documents.
(f) Each section of the manual shall be divided by a stiff divider of the same size
as the holder. The divider shall be labelled to identify the section of the
manual, which is following.
(g) All pages comprising the manual shall be subsequently numbered
according to each section (i.e.: Part I, Section A, B, Part II,
Section A, B, C etc…)
Routine Maintenance & Inspection Service if applicable
A The annual premium to be claimed for carrying out routing inspection and service,
RENOVATIONS TO BANK OF BARODA
MEP INSTALLATIONS
shall be as provided in the Tender.
B The proposed scheme should be in the form of broken down list of proposed
interventions with corresponding rates in such a way that the Client may if desired
omit certain operations or alter the frequency of intervention.
C During adjudication of tenders, due consideration shall have been given to the
maintenance facilities offered and to the spares and service organization of the
Contractor on which full particulars must have been provided.
D The Contract shall be renewable at the end of that period for consecutive periods
of 12 months at the discretion of the Client and any increase in the premium shall
be mutually agreed between both parties, it being understood that such increase
shall have to be fully justified by the Contractor and shall be calculated from
initial quoted rates.
As-built Drawings
E Four weeks (minimum) before the start-up of preliminary handing-over visits, the
Contractor shall hand over a draft copy of every as-built drawing to the Engineer
for comment. All progress drawings shall be submitted together with the draft as-
built drawings.
F Preliminary prints of ‘As-Built’ Drawings shall be submitted to the Engineer who
shall endeavour to establish the correctness of the drawings. However,
verification of ‘As-built’ Drawings by the Engineer shall not relieve Contractor of
his responsibility for any deviation from reality, which may be discovered at a
later date, even after the Maintenance Warranty and Defects Liability Period.
A He may be requested at any time to make the necessary corrections and all
expenses incurred to do so shall be at his charge. He may also be liable at
common law for any prejudice or inconvenience that such error may have been
caused to the Employer , Employer’s Personnel / Engineer. Whenever possible a
transparent copy of the Architect or Engineer’s drawing shall be used for the
preparation of an ‘As-built’ Drawing and the Engineer shall supply the required
transparency against payment at prevailing cost. If ‘As-built’ variations cannot be
clearly shown thereon, it shall then be the Contractor’s responsibility to prepare
the necessary transparencies, which shall provide the appropriate information.
B Draft as-built drawings in this context refers to as-built drawings that have been
prepared on the basis of the progress drawings but which shall be complete in all
instances including reference numbers except for such modifications as may be
RENOVATIONS TO BANK OF BARODA
MEP INSTALLATIONS
found necessary during commissioning/acceptance tests, hand-over procedures,
C Final draft as-built drawings shall be handed-over to the Engineer for comments
within fourteen days of successful acceptance tests/handover procedures, etc.
These drawings shall incorporate any modifications found necessary.
D In addition, and complementary to the draft as-built drawings, the Contractor
shall provide the following of each drawing within a calendar month of the
contract completion date:-
(a) 1 set of CD for CAD reproduction and worked through the latest AutoCAD
E As-built drawings shall show to the approval of the Engineer the work as
completed and shall record the following (as applicable):-
(i) The location, including level if buried, of public service connections
provided within the contract, whether installed by the Subcontractor or
the appropriate Authority, together with the points of origin and
termination, size and materials of pipes, line pressure, flow and other
relevant information.
(ii) The layout, location and extent of all piped services showing pipe sizes,
together with all valves for regulation, isolation and other purposes, drain
cocks, test points, gauges, flow or pressure switches and other
(iii) Location, identity, size and details of all apparatus and controls
equipment served by, or associated with, each of the various services.
(iv) The location and identity of each room including space housing plant,
machinery or apparatus.
(v) All necessary sections, elevations, isometrics and schematics of the plant
(vi) Control and wiring diagrams shall be provided incorporating details of
each instrument and equipment item and written description of the
sequence of operation of each system. All diagrams shall include full
details of internal panel wiring and connections to field mounted items.
(vii)Layout, location and extent of Electrical switchgear, distribution boards,
cables and termination points.
RENOVATIONS TO BANK OF BARODA
MEP INSTALLATIONS
(viii) Detailed general arrangements of all switchgears, riser cupboards,
service trenches, transformer chambers, generator rooms and other plant
or apparatus, including the location, identity, manufacturer, size and
rating of each apparatus
(ix) Shop and As-Built Drawings from Manufacturers, Suppliers and Other
Subcontractors if related to the Contract, shall also be supplied.
A The as-built drawings as described shall be drawn out in ink on best quality tracing
paper on the international A series sizes. All lettering shall be in ink with all
titles, headings, etc. stencilled in height not less than 5mm; all other lettering
shall be stencilled.
B Each record drawing shall show the following information:-
(a) The name of the contract, and where appropriate, the zone and floor
(b) Description of drawing, drawing number and scale.
(c) Name and address of the Contractor and the engineer.
C The completed drawings shall be signed by the Contractor as as-built drawings,
and shall be submitted to the Engineer at the same time as the operating and
maintenance manual is handed over for comment.
D Each as-built drawing shall include the words “As-built Drawing” in 18mm
stencilled upper case lettering in the bottom right corner adjacent to the title
Training of Personnel
E The tendered shall allow for the training of the Client’s personnel until the point
where they will be fully conversant with the installation
A The Contractor shall be responsible to plan the training scheme, in consultation
with the Client.
B The period of liability of the Contractor on any portion of the installation, shall be
governed by any Defects Liability period or Guarantee applicable to the
INSTALLATION and equipment, whichever is later.
Liability for Installation and Maintenance of Equipment & Associated
Components Supplied by the Employer
C When the Employer decides to order any piece of equipment or component of
installation from any source of his choice and in direct relation with the Contract
Works covered by the Contract and to entrust the installation of such equipment
or component to the Contractor, the latter which shall be deemed to be a
Specialist in the field, shall unless otherwise instructed, be responsible for taking
RENOVATIONS TO BANK OF BARODA
MEP INSTALLATIONS
delivery of the equipment and installing same in full accordance with the
instructions of the Supplier/Manufacturer, taking all the recommended
precautions for the proper and safe operation of such equipment or component.
D The Contractor shall therefore be responsible of the commissioning of the
equipment or component with the assistance of a Technical representative of the
Supplier/Manufacturer, as considered necessary by the Client or appointed
Consultant, and of the handing over of such equipment or component in perfect
condition of operation and appearance and to the entire satisfaction of the Client
E The Contractor shall subsequently be responsible of providing Post Contract
Maintenance & Repair service on equipment supplied by the Client/Employer and
of liaising with the relevant Supplier/Manufacturer for any technical information
or for obtaining parts to carry out any repair.
F When any Contract or Post Contract intervention of the Contractor was to fall
under the normal or any extended terms of the Guarantee of the
Supplier/Manufacturer as may have been established at time of order by the
Client, the Contractor shall carry out any repair or making good intervention as
instructed by the Client or Service Engineer and the cost of such repair shall be at
the charge of the Client who shall take the necessary steps to recover such costs
from the Supplier/Manufacturer.
A However, the Contractor shall make good at his own expense within the Contract
or Post Contract liability period, and following written or verbal instructions from
the Client or Consultant, any fault, defect, shrinkage or other which may appear,
arising in the opinion of the Engineer, from the negligence, lack of expertise and
incompetence of the Contractor or from the use of bad quality installation
materials or from bad workmanship, not in accordance with the
Supplier’s/Manufacturer’s instructions or not complying to the drawings, contract
documents and approved standards or instructions of the Service Engineer.
B In case of default of the Contractor to fulfil his obligations under the terms of this
clause, the Employer may employ or pay other persons to amend and make good
such defects, faults or damage and all expenses consequent thereon and
incidental thereto shall be borne by the Subcontractor and shall be recoverable
from him by the Employer or may be deducted by the Employer from any monies
due to that may become due to the Contractor, the whole without prejudice to
the rights of the Employer at Common Law.
RENOVATIONS TO BANK OF BARODA
MEP INSTALLATIONS
C The period of liability of the Contractor on any portion of the installation, shall be
governed by any Defects Liability period or Guarantee applicable to the
INSTALLATION and equipment, whichever is later.
D Duties and Powers of the Employer’s Personnel / Engineer
1 Employer’s Personnel / Engineer’s Duties
The Engineer shall have the duties assigned to him by the Employer in
accordance with the conditions of engagement submitted by the Employer’s
Personnel / Engineer and accepted by the Employer or as otherwise specified
in a correspondence between the Engineer and the Employer.
If the Employer’s Personnel / Engineer was to provide Services beyond the
Scope of his duties as agreed with the Employer and if this was due to the
Contractor default to comply to the terms of his Contract, the latter shall be
liable to reimburse the Employer any costs incurred by the Employer’s
Personnel / Engineer for providing such additional services as for example:-
(a) Extended attendance on site due to delay for completion of the works
within the Contract period.
(b) The cost of producing Shop/Working drawings and Engineering details,
which should normally have been produced by within the Contractor
within the terms of the Contract.
(c) The cost of any Technical and Engineering assistance provide due to
the absence of the necessary expertise within the Contractor's
The Employer’s Personnel / Engineer reserves the right to submit a claim for
such expenses after giving the Contractor early notice in writing of his
intention to do so with copy to the Employer. Such notice shall be addressed
at least 90 days before putting-up the claim and the Contractor shall be at
liberty to submit objections, if any, to such payment.
If the Employer’s Personnel / Engineer consider that such objections are not
receivable and if after expressing same in writing to the Contractor, the
latter maintains his objections, the Engineer shall be at liberty to apply to the
Employer for the settlement of his claim and the corresponding amount shall
RENOVATIONS TO BANK OF BARODA
MEP INSTALLATIONS
be deductible from the Contract Sum at the Employer's discretion.
2 Employer’s Personnel / Engineer's Powers
Unless otherwise specified, all instructions to the Subcontractor shall be given
by the Employer’s Personnel who shall have all the powers stated elsewhere
in the Contract.
3 Employer’s Personnel / Engineer's Decisions
The Contractor shall proceed with the works in accordance with decisions,
instructions given by the Employer’s Personnel / Engineer in accordance with
the conditions of the Contract, provided always that:-
(a) If the Contractor shall, without undue delay after being given a
decision, instruction or order otherwise than in writing, require it to be
confirmed in writing, such decision, instruction or order shall not be
effective until written confirmation thereof has been received by the
(b) If the Contractor shall by written notice to the Engineer
within 7 days after receiving any decision, instruction of the Employer’s
Personnel / Engineer in writing or written confirmation thereof, intimate
that he disputes or questions the decision, instruction , giving his reasons for
so doing, either party to the contract shall be at liberty to refer the matter to
Arbitration, but such intimation shall not relieve the Contractor of his
obligation to proceed with the Works in accordance with the decision,
instruction or order in respect of which the intimation has been
given to him. The Contractor shall be at liberty in any such arbitration to
rely on reasons additional to the reasons stated in the said intimation.
4 Responsibility of the Employer’s Personnel / Engineer
The Engineer shall be responsible for the inspection of the Works and for
making sure that the installation generally complies with the specifications of
the Contract. It is not the responsibility of the Employer’s Personnel /
Engineer to instruct the Contractor on how to perform any part of his work.
RENOVATIONS TO BANK OF BARODA
MEP INSTALLATIONS
The Engineer shall carry out inspections periodically at the frequency and
time that he may judge necessary to satisfy himself that the Works are
executed generally in accordance with his designs and otherwise in
accordance with good Engineering Practice.
Such inspections are not meant to detect all possible errors, deviations or
defects that may have been made by the Contractor or caused by his default
or lack of supervision, and inspection or approval of any part of the
installation by the Employer’s Personnel / Engineer, does not relieve the
Contractor of his obligations to comply with the Conditions of the Contract
and from his liability at Common Law.
Inspection and approval of any part of the installation does not therefore
relieve the Contractor from his obligation to remedy or correct any defect,
deviation or error that may be discovered subsequently, when instructions
shall be given to him by the Employer’s Personnel / Engineer to that effect.
5 Employer’s Personnel / Engineer's
The duties of the Engineer's representative are to watch and inspect the
works and to test and examine any materials to be used or workmanship
employed in connection with the works. He shall have no authority to relieve
the Contractor of any of his duties or obligations under the Contract, nor,
except as expressly provided hereunder, to order any work involving delay or
any extra payment by the Employer nor to make any variation of or in the
The Employer’s Personnel may from time to time in writing delegate to the
Engineer any of the powers and authorities vested in the Employer’s
Personnel and shall furnish to the Contractor a copy of such written
delegations of powers and authorities. Any written instruction or written
approval given by the Engineer's representative to the Contractor within the
terms of such delegation (but not otherwise) shall bind the Contractor and the
Employer as though it has been given by the Employer’s Personnel / Engineer
provided always as follows:-
RENOVATIONS TO BANK OF BARODA
MEP INSTALLATIONS
(a) Failure of the Employer’s Personnel / Engineer's to disapprove
any work or materials shall not prejudice the power of the
Engineer thereafter to disapprove such work or materials and to order the
pulling down, removal or breaking up thereof.
(b) If the Contractor shall be dissatisfied by reason of any
decision of the Engineer he shall be entitled to refer the matter to the
Employer’s Personnel who shall thereupon confirm, reverse or vary such
6 Supervision, Control and Inspection
The Contactor shall extend to the Employer’s Personnel / Engineer or any
person authorised by him all facilities for access to the Works and to the site
and to all workshops of the Subcontractor or other places where Works or
portions of Contract Works are being carried out or prepared in as part with
The Contactor shall provide every assistance in or for obtaining the right to
such access and shall provide all labour, materials and equipment required for
testing, measuring the Contract works, and for weighing proving or testing the
efficiency of any portion or portions of the completed Contract works.
The Contractor shall keep the Employer’s Personnel / Engineer informed of
the progress of the Works and shall submit periodic reports as and when
requested by the Employer’s Personnel / Engineer and in the form specified.
8 Ownership of Drawings and Contract Documents
All drawings, tracings and other documents issued by the Employer’s
Personnel / Engineer for carrying out the Contract Works shall only be used
for the purpose of the Contract and for no other use, and shall not be
divulged to people not concerned with the Contract nor shall they be copied
without the authorization of the Employer’s Personnel / Engineer. They shall
be carefully preserved in good condition and shall be kept at the disposal of
the Architect / Engineer.
The Employer’s Personnel / Engineer reserves the right to request return of
all documents and drawings to him should he consider that these have been
misused or that unethical use have been made of same.
He also reserves the right to take the appropriate legal measures to protect
RENOVATIONS TO BANK OF BARODA
MEP INSTALLATIONS
A Allow for providing reports site diaries and returns as directed.
B Allow for providing progress photographs as directed.
C The Contractor is to provide all necessary particulars as to recesses, chases,
sleeves, etc., required so that they may be correctly built in, in the first place. If
the Contractor fails to do this, the cost of any alterations or cutting will fall upon
Maintenance Manuals
D The Contractor shall obtain and hand over to the Engineer on taking over of the
works any operating and maintenance instruction manuals, data or instructions
required by the Engineer or provided by Manufacturers, Suppliers or
Subcontractors.
Renovation of Bank of Baroda Office Building
BILL No. 1 - DEMOLITION AND MAKING GOOD
ALL REMEASURABLE
The tenderer is referred to the MLC Preambles
(Eleventh Edition) which is to be read in conjunction
with these bills of quantities.
SUPPLEMENTARY PREAMBLES
For Preambles see Interior Designer's, Architect's and
Engineer's specifications.
Tender Drawings
Refer to Architect's and Engineer's drawing registers.
Bills of quantities description
The description of the items in this document is to be
read in conjunction with the drawings and is intended
as a means of locating and identifying the element only
and are not intended as full descriptions and
specifications of these items. Quantities contained in
these Bills of Quantities are indicative only and shall
be assessed on site. Tenderer shall allow for all costs
in connection with the various items taking full
cognisance of the drawings, specifications and the Bills
of Quantities descriptions.
Prices shall include for everything necessary to
complete the works and shall include for all labour,
materials, supervision, propping, underpinning,
additional scaffolding, cartage, etc., necessary to
effect a high standard of finished product.
Carried to Collection Rs
Demolition Works
Renovation of Bank of Baroda Office Building
1. All demolished materials to be carted away off site
unless stated otherwise and shall be deemed to include
loading of debris onto trucks directly from the working
area or, alternatively, from stock piles situated on the
2. All existing stones to be carefully taken off and
store on a suitable location on site to be later re-used
3. All existing doors and windows / timber truss unless
otherwise described below shall get the approval of
the Employer before carting away
4. Asbestos removal by others - Contractor to provide
adequate protection to exposed areas where asbestos
has been removed
5. Contractors are to refer to Architects notes on
drawings and any sample to be approved prior to start
6. Contractors to carry out existing underground
DEMOLITIONS, ETC.
Existing concrete steps at first floor
A Demolish existing concrete building steps including
carefully remove handrail and balustrade (to be
handed to client) including grubbing of foundations /
Steps / floors / columns/ beams / roof / rainwater
pipes / electrical / telephone wiring / lights / switches
/ paver / stone plinth / waterproofing etc. all
complete including preparing and making good all
exposed concrete and block work surfaces including
cutting of visible reinforcement. Contractor to allow
for all necessary propping / support work all complete
and in accordance with Engineer's requirement and
Architect Specification m2 3
Carried to Collection Rs
Demolition Works
Renovation of Bank of Baroda Office Building
A Demolish existing concrete column of 600mm diameter
6,000 m high at main entrance area including grubbing
of foundations / Steps / floors / columns/ beams /
roof / rainwater pipes / electrical / telephone wiring /
lights / switches / paver / stone plinth / waterproofing
etc. all complete including preparing and making good
all exposed concrete and block work surfaces including
cutting of visible reinforcement. Contractor to allow
for all necessary propping / support work all complete
and in accordance with Engineer's requirement and
Architect Specification No 1
External concrete fins
B Demolish existing concrete fins or overall size 1,112mm
x 100mm thick on South elevation and make good
existing surfaces including the treatment of any
exposed reinforcement bars with adequate products all
as per approved methodology from the structural
engineer Drawing No. 2020/BOB/O4-001 and as per
Structural Engineer's . Contractor to allow for all
necessary propping / support work all complete and in
accordance with Engineer's requirement and Architect
C Make good existing concrete fins on North Elevation by
removing any delaminated concrete including all
necessary treatment of any exposed reinforcement
with adequate products. Gaps at exposed
reinforcement areas to be filled with an approved
structural sealant all as per approved methodology
from the structural engineer. Contractor to allow for
all necessary propping / support work all complete and
in accordance with Engineer's requirement and
Architect Specification m 293
Carried to Collection Rs
Demolition Works
Renovation of Bank of Baroda Office Building
Existing metal staircase at first floor
A Demolish existing metal staircase overall size 9,000mm
x 1,200mm wide consisting of 48Nos. steps circular on
plan at first floor including carefully remove handrail
and balustrade. Contractor to allow for the carting
away of the metail staircase and all necessary propping
/ support work all complete and in accordance with
Engineer's requirement and Architect Specification. No 1
Metal balustrade at Second Floor
B Carefully remove existing gms balustrade 1,100mm
high overall to receive new frameless glass balustrade
Block work etc. to Ground, First, Second, Third &
C Demolish existing reinforced concrete / Block wall /
Lintels & Jambs all complete including preparing and
making good all exposed concrete and block work
surfaces including cutting of visible
reinforcement.Contractor to allow for all necessary
propping / support work all complete and in
accordance with Engineer's requirement and Architect
Windows and Doors to Ground, First, Second, Third
& Fourth Floors.
1. All items described in below section are for doors /
windows which were not included in above demolition
(General Demolitions) and are to be priced separately.
D Carefully remove existing aluminium entrance doors
including glazing of overall size 3,000 x 2,400mm high
all complete including preparing and making good all
exposed concrete and block work surfaces including
cutting of visible reinforcement. Contractor to allow
for all necessary propping / support work all complete
and in accordance with Engineer's requirement and
Architect Specification No 5
Carried to Collection Rs
Demolition Works
Renovation of Bank of Baroda Office Building
A Carefully remove existing metal windows of various
sizes including glazing including preparing and making
good all exposed concrete and block work surfaces
including cutting of visible reinforcement. Contractor
to allow for all necessary propping / support work all
complete as per Structural Engineer's approval and in
accordance with Engineer's requirement and Architect
B Demolish existing concrete slab to form staircase
opening including the cleaning and making good all
exposed concrete and block work surfaces including
cutting of visible reinforcement. Contractor to allow
for all necessary propping / support work at 600mm
c/c all complete and in accordance with Engineer's
requirement and as per Strucural Engineer's Drawing
Archive room including CIS roof coverings at Third
C Demolish archive room in existing reinforced concrete
/ Block wall / Lintels & Jambs all complete including
preparing and making good all exposed concrete and
block work surfaces including cutting of visible
reinforcement and the treatment of any exposed
reinforcement all as per Structural engineer's approval.
Rate to include the removal of existing roof sheeting
complete with all fittings and fixations. Contractor to
allow for carting away and all necessary propping /
support work all complete and in accordance with
Engineer's requirement and Architect Specification. m2 62
Carried to Collection Rs
Demolition Works
Renovation of Bank of Baroda Office Building
A Remove existing drywall partition overall size 2,600mm
high. Prepare and make good all exposed concrete and
block work surfaces, internal plaster finish to match
and to be flush with existing finish to receive 3 coats
of internal pastel paint finish (e/m) and to receive new
gypsum partitions all as per Architect's drawings and
Floor Tiles to Ground, First, Second, Third & Fourth
B Remove existing floor tiling including skirting, hack off
existing screed, prepare and make good surfaces to
receive new floor finish (e/m) all as per Structural
Engineer's and Architects requirements. m2 1,631
C Remove existing floor tiling to main staircase including
skirting, hack off existing screed, prepare and make
good surfaces to receive new floor finish (e/m) all as
per Structural Engineer's and Architects requirements. m2 130
Wall Finishes to Ground, First, Second, Third &
D Remove existing mosaic wall tiles hack off existing
screed, prepare and make good surfaces to receive
new wall finish (e/m) all as per Structural Engineer's
and Architects requirements. m2 70
E Remove existing wallpaper to wall and column surfaces
and prepare and make good surfaces to receive new
wall finish (e/m) all as per Structural Engineer's and
Architects requirements. m2 209
Existing Sanitary Wares
Carried to Collection Rs
Demolition Works
Renovation of Bank of Baroda Office Building
Screed at Seventh Floor
A Remove and hack off existing screed, prepare and
make good surfaces to receive new waterproof screed
(e/m) all as per Structural Engineer's and Architects
Carried to Collection Rs
Demolition Works
Renovation of Bank of Baroda Office Building
Demolition Works
Page Amount
Total Brought Forward from Page No. 1
Carried Forward Rs
Demolition Works
Renovation of Bank of Baroda Office Building
BILL NO. 2 - FOUNDATIONS
ALL PROVISIONAL
For Preambles see MLC Standard Preambles (Eleventh
Rate for masonry blockwall shall include for wall ties
EXCAVATION, FILLING, ETC OTHER THAN BULK
Excavating in any material including existing
concrete surface, rock, starting from stripped level,
trenches to receive footings
Risk of Collapse of Excavations
B Risk of collapse to side of trenches / bases n.e 1.5m
Excavated material
C Removing surplus from site m3 12
230 Micron approved polyethene waterproof
sheeting sealed with normal lapping
D Under foundations (measured net) m2 8
CONCRETE, FORMWORK AND REINFORCEMENT
Carried to Collection Rs
Renovation of Bank of Baroda Office Building
Plain in-situ concrete, designed mix Grade 15
N/mm², 40 mm aggregate, as described in
A 50mm thick blinding layer under footings, bases and
Reinforced in-situ concrete designed mix Grade 30
N/mm², 20mm aggregate vibrated, as described in
B Foundations in trenches and bases, cast against
Reinforcement bars to MS 10/BS 4449 hot rolled
plain round mild steel, as described
Bases, footings and the like
Reinforcement bars to MS 10/BS 4449 hot rolled
deformed high yield steel bars, as described
Bases, footings and the like
D Bars of various diameters kg 360
Formwork in Class 2 finish, strutting at / from any
level and including rebates or groove formers, n.e
E Sides of footings, bases n.e. 300mm high m 12
25mm thick flexcell expansion joint in slips between
joints of vertical concrete to be filled with backing
cord and polysulphide sealant
F 25mm thick vertically between surfaces m2 6
Carried to Collection Rs
Renovation of Bank of Baroda Office Building
Dowelling of reinforcement bars sealed with
Epidermix T372 n.e 100mm deep
A to existing structures No 30
Carried to Collection Rs
Renovation of Bank of Baroda Office Building
Page Amount
Total Brought Forward from Page No. 9
Carried Forward Rs
Renovation of Bank of Baroda Office Building
BILL NO. 3 - CONCRETE, FORMWORK &
For Preambles see MLC Standard Preambles (1ST
The costs of making, storing and testing of concrete
test cubes as required under clause 7 "Tests" of SABS
1200 G, or local equivalent standards to Engineer's
approval shall include the cost of providing cube
moulds necessary for the purpose, for testing costs
and for submitting reports on the tests to the
architect. The testing shall be undertaken by an
independent firm or institution nominated by the
contractor to the approval of the Engineer.
Description of formwork shall be deemed to include
use and waste only (except where described as "left
in" or "permanent"), for fitting together in the
required forms, wedging, plumbing and fixing to true
angles and surfaces as necessary to ensure easy
release during stripping and for reconditioning as
necessary before re-use
The vertical strutting shall be carried down to such
construction as is sufficiently strong to afford the
required support without damage and shall remain in
position until the newly constructed work is able to
support itself.
Formworks to soffits of solid etc shall be deemed to be
slabs not exceeding 250mm thick unless otherwise
Carried to Collection Rs
Concrete, Formwork & Reinforcement
Renovation of Bank of Baroda Office Building
Formwork to sides of bases, pile caps, ground beams,
etc will only be measured where it is prescribed by
the engineer for design reasons. Formwork
necessitated by irregularity or collapse of excavated
faces will not be measured and the cost thereof shall
be deemed to be included in the allowance for taking
the risk of collapse of the sides of the excavations,
provision for which is made in "Earthworks"
Prices shall include for everything necessary to
complete the works and shall include for all labour,
materials, supervision, propping, additional
scaffolding, cartage, etc., necessary to effect a high
standard of finished product.
Reinforced in-situ concrete designed mix Grade 30
N/mm², 20mm aggregate vibrated, as described in
B Upstand to receive stainless steel channel for glass
Reinforcement bars to MS 10/BS 4449 hot rolled
plain round mild steel, as described
Bases, footings and the like
F Bars of various diameter kg 988
Reinforcement bars to MS 10/BS 4449 hot rolled
deformed high yield steel bars, as described
Carried to Collection Rs
Concrete, Formwork & Reinforcement
Renovation of Bank of Baroda Office Building
Bases, footings and the like
A Bars of various diameters kg 8,892
Formwork in Class 2 finish, strutting at / from any
level and including rebates or groove formers, n.e
C Extra over to form 50mm x 80mm rebate to receive
stainless steel channel elsewhere measured m 26
D Sides of new concrete fins m2 370
Dowelling of reinforcement bars sealed with
Epidermix T372 n.e 100mm deep
Carried to Collection Rs
Concrete, Formwork & Reinforcement
Renovation of Bank of Baroda Office Building
Concrete, Formwork & Reinforcement
Page Amount
Total Brought Forward from Page No. 13
Carried Forward Rs
Concrete, Formwork & Reinforcement
Renovation of Bank of Baroda Office Building
BILL No. 4 - MASONRY
ALL PROVISIONAL
For Preambles see MLC Standard Preambles (1ST
SUPPLEMENTARY PREAMBLES
For Preambles see Interior Designer's, Architect's and
Engineer's specifications.
Rate for masonry blockwall shall include for wall ties
as per engineer's specifications
EXTERNAL BLOCKWALL
Hollow concrete blocks to BS 6073, minimum
average compressive strength 3.5 N/mm², in cement
mortar (1:3), as described in
INTERNAL BLOCKWALL
Hollow concrete blocks to BS 6073, minimum
average compressive strength 3.5 N/mm², in cement
mortar (1:3), as described in
Carried Forward Rs
Renovation of Bank of Baroda Office Building
BILL NO. 5 - WATERPROOFING
For Preambles see MLC Standard Preambles (1ST
Waterproofing of roofs, water retaining structures,
internal wet areas, etc. shall be laid under a ten-year
Waterproofing to roofs shall be laid to even falls to
outlets, etc. with necessary ridges, hips and valleys.
Descriptions of sheet or membrane waterproofing shall
be deemed to include additional labour to turn-ups and
ROOF WATERPROOFING AND FLASHINGS
Supply and lay liquid- applied polyurethane
waterproofing membrane mariseal 250 or approved
equivalent with all necessary sealants, primers &
fabrics strictly to specialist's recommendations.
waterproofing to be laid on 25mm minimum screed
thickness laid to fall towards outlet all in accordance
with manufacturer's specifications (ten year
guarantee to be given) measured nett to
Smooth trowelled screeded roofs of
Carried Forward Rs
Renovation of Bank of Baroda Office Building
BILL NO. 6 - PLASTERWORK
For Preambles see MLC Standard Preambles (Eleventh
Measurement methodology
Cement and sand screed (1:3) to receive
waterproofing (m/s)
Works to falls and cross-falls to flat concrete roofs
A 65mm thick average laid to falls and cross falls to
B Extra over to form triangular fillet - 75 x 75mm m 192
INTERNAL FLOOR FINISHES
Cement and sand (1:3) bedding to receive
porcelain/ceramic tiles (m/s)
E Extra over for powerfloat finish m2 316
EXTERNAL FLOOR FINISHES
Cement and sand (1:3) bedding to receive ceramic
Carried to Collection Rs
Renovation of Bank of Baroda Office Building
INTERNAL PLASTER
Cement and sand (1:3) rendering as described with a
steel trowelled to a smooth finish to Architect's
specification and approval
B Walls inclusive of flush columns and beams, reveals,
Cement and sand (1:3) backing coat with wood
floated finish to receive wall tiling
C Walls, returns, reveals and the like m2 520
EXTERNAL PLASTER
Cement and sand (1:3) smooth rendering as
described with a wood float and sponge textured
finish to Architect's specification and approval
D Walls inclusive of flush columns and beams, reveals,
Carried to Collection Rs
Renovation of Bank of Baroda Office Building
Page Amount
Total Brought Forward from Page No. 19
Carried Forward Rs
Renovation of Bank of Baroda Office Building
BILL NO. 7 - PAINTING
For Preambles see MLC Standard Preambles (1ST
Strip off any lose, chalking and peeling paint, sand
down and clean existing wall surfaces, prepare and
apply one sealer coat and two full coats PVA anti
fungicidal emulsion paint (satin finish), colour to
Architect's approval to textured surfaces of
EXISTING WALL SURFACES
Strip off any lose, chalking and peeling paint, sand
down and clean existing wall surfaces and prepare
and apply one coat Polycolor wall primer water
based acrylic primer on the existing wall surfaces
followed by 2 coats of Polycolor, matt emulsion high
quality copolymer acrylic paint or equal and
approved all to Architect's approval and as per
shedule of finishes drawing no NP/19/26/PD SCH1 R3
B Existing Wall Areas (all wall areas) m2 1,123
EXISTING CEILING SURFACES
Carried to Collection Rs
Paintwork & Vinyl Wallpaper Finishes
Renovation of Bank of Baroda Office Building
Strip off any lose, chalking and peeling paint, sand
down and clean existing wall surfaces and prepare
and apply one coat Polycolor wall primer water
based acrylic primer on the existing wall surfaces
followed by 2 coats of Polycolor, matt emulsion high
quality copolymer acrylic paint or equal and
approved all to Architect's approval and as per
shedule of finishes drawing no NP/19/26/PD SCH1 R3
NEW WALLS, BEAMS, COLUMNS AND THE LIKE
Prepare and apply one coat Polycolor wall primer
water based acrylic primer on the new surfaces
followed by 2 coats of Polycolor, matt emulsion high
quality copolymer acrylic paint or equal and
approved all to Architect's approval and as per
shedule of finishes drawing no NP/19/26/PD SCH1 R3
B Existing Wall Areas (all wall areas) m2 87
Wall finishes to partitions as per ID specification
Feature wall paint / Graphic wall (WF-02)
VINYL WALLPAPER FINISH
Supply and install Vinyl graphic print wall covering full
height upto ceiling level as per future Architect
specification and approval all as per Architects Drawing
Carried to Collection Rs
Paintwork & Vinyl Wallpaper Finishes
Renovation of Bank of Baroda Office Building
Paintwork & Vinyl Wallpaper Finishes
Page Amount
Total Brought Forward from Page No. 22
Carried Forward Rs
Paintwork & Vinyl Wallpaper Finishes
Renovation of Bank of Baroda Office Building
BILL NO. 8 - RAINWATER INSTALLATIONS
For Preambles see MLC Standard Preambles (Eleventh
PVC rainwater pipework cast in concrete or fixed on
surface with and including standard brackets,
plugged to concrete or blockwall
A 110mm diameter pvc pressure pipe m 260
D Extra over for rodding eye No 18
E PVC outlet or equal approved, of nominal bore pipe
size 110mm fitted to 110mm diameter downpipe (m/s) No 9
Carried Forward Rs
Rainwater Goods
Renovation of Bank of Baroda Office Building
BILL NO. 9 - TILING
For Preambles see MLC Standard Preambles (Eleventh
Unless described otherwise, description of tiling shall
include for porcelain, ceramic, slate, marble and
mosaic tiles in various sizes.
Measurement methodology
The quantity splits are as follows:
A - Ground Floor
B - First Floor
C - Second Floor
D - Third Floor
E - Fourth Floor
Supply and lay "Restile flamed pebbles collection"
floor tiles of size 600x 600x 10 mm as per the
Architect's schedule of finishes (SCH1.0R3),
including supply of cement mortar, adhesive
,pointing materials all square and raking cutting,
waste and cleaning off on completion, all applied in
strict accordance with the manufacturers'
recommendation, sizes and pattern as laid out in the
Architect's Floor Pattern Plans NP/19/26/PD- 04.0,
04.1, 04.2, 04.3, 04.4 R1 TILING LAYOUT
Carried to Collection Rs
Renovation of Bank of Baroda Office Building
Supply and lay "Restile Makers Collection Flamed
Iconic" floor tiles of size 600x 600x 10 mm as per
the Architect's schedule of finishes (SCH1.0R3),
including supply of cement mortar, adhesive
,pointing materials all square and raking cutting,
waste and cleaning off on completion, all applied in
strict accordance with the manufacturers'
recommendation, sizes and pattern as laid out in the
Architect's Floor Pattern Plans NP/19/26/PD- 04.0,
04.1, 04.2, 04.3, 04.4 R1 TILING LAYOUT
Supply and lay "Restile Step up collection Pebbles"
floor tiles of size 1200x 300x 12 mm as per the
Architect's schedule of finishes (SCH1.0R3),
including supply of cement mortar, adhesive
,pointing materials all square and raking cutting,
waste and cleaning off on completion, all applied in
strict accordance with the manufacturers'
recommendation, sizes and pattern as laid out in the
Architect's Floor Pattern Plans NP/19/26/PD- 04.0,
04.1, 04.2, 04.3, 04.4 R1 TILING LAYOUT
Carried to Collection Rs
Renovation of Bank of Baroda Office Building
Supply and lay "Restile Colours Collection Nero" Wall
tiles (W1) of size 600x 600x 10 mm as per the
Architect's schedule of finishes (SCH1.0R3),
including supply of cement mortar, adhesive
,pointing materials all square and raking cutting,
waste and cleaning off on completion, all applied in
strict accordance with the manufacturers'
recommendation, sizes and pattern as laid out in the
Architect's Floor Pattern Plans NP/19/26/PD/ -07.7, -
A Walls, returns, reveals and the like
Supply and lay "Restile Colours Collection Terracotta"
Wall tiles (W2) of size 300x 600x 10 mm as per the
Architect's schedule of finishes (SCH1.0R3),
including supply of cement mortar, adhesive
,pointing materials all square and raking cutting,
waste and cleaning off on completion, all applied in
strict accordance with the manufacturers'
recommendation, sizes and pattern as laid out in the
Architect's Floor Pattern Plans NP/19/26/PD/ -07.7, -
B Walls, returns, reveals and the like
Carried to Collection Rs
Renovation of Bank of Baroda Office Building
Supply and lay "Restile Colours Collection Steel Grey"
Wall tiles (W3) of size 600x 600x 10 mm as per the
Architect's schedule of finishes (SCH1.0R3),
including supply of cement mortar, adhesive
,pointing materials all square and raking cutting,
waste and cleaning off on completion, all applied in
strict accordance with the manufacturers'
recommendation, sizes and pattern as laid out in the
Architect's Floor Pattern Plans NP/19/26/PD/ -07.7, -
A Walls, returns, reveals and the like
Supply and lay "Restile Chip Collection MIST" tiles of
size 600x 600x 10 mm as per the Architect's
schedule of finishes (SCH1.0R3), including supply of
cement mortar, adhesive ,pointing materials all
square and raking cutting, waste and cleaning off on
completion, all applied in strict accordance with the
manufacturers' recommendation, sizes and pattern
as laid out in the Architect's Floor Pattern Plans
Supply and lay "Restile Step up Collection Step-up
ABACUS" floor tiles of size 1520x 315x 12 mm as per
the Architect's schedule of finishes (SCH1.0R3),
including supply of cement mortar, adhesive
,pointing materials all square and raking cutting,
waste and cleaning off on completion, all applied in
strict accordance with the manufacturers'
recommendation, sizes and pattern as laid out in the
Architect's Floor Pattern Plans NP/19/26/PD- 04.0,
04.1, 04.2, 04.3, 04.4 R1 TILING LAYOUT
Carried to Collection Rs
Renovation of Bank of Baroda Office Building
Supply and lay "Restile Step up Collection Riser C
Step-up ABACUS " floor tiles of size 1520x 640x 10
mm as per the Architect's schedule of finishes
(SCH1.0R3), including supply of cement mortar,
adhesive ,pointing materials all square and raking
cutting, waste and cleaning off on completion, all
applied in strict accordance with the manufacturers'
recommendation, sizes and pattern as laid out in the
Architect's Floor Pattern Plans NP/19/26/PD- 04.0,
04.1, 04.2, 04.3, 04.4 R1 TILING LAYOUT
Supply and lay "Restile Colour Collection Steel Grey"
floor tiles of size 600x 600x 10 mm as per the
Architect's schedule of finishes (SCH1.0R3),
including supply of cement mortar, adhesive
,pointing materials all square and raking cutting,
waste and cleaning off on completion, all applied in
strict accordance with the manufacturers'
recommendation, sizes and pattern as laid out in the
Architect's Floor Pattern Plans NP/19/26/PD- 04.0,
04.1, 04.2, 04.3, 04.4 R1 TILING LAYOUT
Supply and lay 20 mm Polished Granite tiles (Colour :
Chima Pink) as per the Architect's schedule of
finishes (SCH1.0R3), including supply of cement
mortar, adhesive ,pointing materials all square and
raking cutting, waste and cleaning off on completion,
all applied in strict accordance with the
manufacturers' recommendation, sizes and pattern
as laid out in the Architect's Floor Pattern Plans
Carried to Collection Rs
Renovation of Bank of Baroda Office Building
Supply and lay 20 mm non porous, Polished Granite
Colombo Guparama as per the Architect's schedule
of finishes , including supply of cement mortar,
adhesive ,pointing materials all square and raking
cutting, waste and cleaning off on completion, all
applied in strict accordance with the manufacturers'
recommendation, sizes and pattern as laid out in the
Architect's Floor Pattern Plans NP/19/26/PD- 04.0,
04.1, 04.2, 04.3, 04.4 R1 TILING LAYOUT
A Walls, returns, reveals and the like
Supply and lay 20 mm Polished Granite tiles (Colour :
Chima Pink) as per the Architect's schedule of
finishes (SCH1.0R3), including supply of cement
mortar, adhesive ,pointing materials all square and
raking cutting, waste and cleaning off on completion,
all applied in strict accordance with the
manufacturers' recommendation, sizes and pattern
as laid out in the Architect's specification
SKIRTINGS, ETC.
Supply and fix "Restile Chip Collection MIST' skirting
tile to match floor tiles finishes, all as per architect
Supply and fix "Restile Step up Collection Step-up
ABACUS" skirting tile to match floor tiles finishes, all
as per architect Specifications
Carried to Collection Rs
Renovation of Bank of Baroda Office Building
Supply and fix 100 mm high Granite Skirting tiles
(Colour : Chima Pink) to match granite finishes, all
as per architect Specifications
A Cut tile skirting 100mm high m 243
Carried to Collection Rs
Renovation of Bank of Baroda Office Building
Page Amount
Total Brought Forward from Page No. 26
Carried Forward Rs
Renovation of Bank of Baroda Office Building
BILL NO 10 - FALSE CEILINGS
ALL PROVISIONAL
SUPPLEMENTARY PREAMBLES
The tenderer is referred to the MLC Preambles
(Eleventh Edition) which is to be read in conjunction
with these bills of quantities.
SUSPENDED CEILING TILES
Supply and fix Calcium Silicate Ceiling Tile of size
600 x 600 mm x6mm thick , all as per
Manufacturer's Specifications and as per Architect's
specifications and Drawing no. NP/ 19/26/PD 05.0,
05.1, 05.2, 05.3, 05.4 R1 FALSE CEILING LAYOUT
A Ceilings not exceeding 1m below concrete soffits m2 1,391
FALSE CEILING SUNDRIES
Carried Forward Rs
False Ceiling Works
Renovation of Bank of Baroda Office Building
BILL NO 11 - PARTITION - SUPPLY & INSTALL
For Preambles see MLC Standard Preambles (Eleventh
Note 1: Sizes of partitions to be measured on site prior
Note 2: All fixings to be concealed.
Note 3: Supplier to provide detailed shopdrawings on
fixing for approval before start.
Note 4: Supplier to provide all necessary samples and
insulation materials together with all specifications for
Note 5: This BOQ has been prepared taking into
consideration the details provided by the Architect.
However contractors can propose alternative methods
to achieve the desired finish. This will be submitted to
Interior Designer for approval
Note 6: All Dry Wall Partitions including studs design
shall be to Interior Designer's approval.
Note 7: All Ironmongeries shall be as per Architect's
specification or equal approved.
Note 8: Aluminium Framed Laminated Glazed Partitions
and Aluminium Framed Laminated Double Glazed
Partitions shall have finish colour to Interior Designer
later choice and approval.
Note 9: All fibre cement board partitioning should be
rendered with waterproofing treatment as per
Architect specification where applicable, all to Interior
Designer approval.
Note 10: Shop drawings are to be submitted to
Architect for approval, all aluminium shall be designed,
fabricated and installed in accordance with British
Standard Code of Practice CP 118; thickness of glass
shall not be as per openings schedule but to
Contractor's design.
Aluminium Metal Stud Gypsum Board Drywall to
Ground, First, Second, Third, Fourth Floors
Carried to Collection Rs
Supply and Install Partition Works
Renovation of Bank of Baroda Office Building
80mm thick drywall standard system "Aluminium
metal stud" gypsum board partitions to match false
ceiling height consisting of fire sealant fixation to
specialist recommendation, gyproc fire stop, isovaer
cavitybatt insulation of with both sides cladded with
one layer of 12.7mm gypsum board skimmed at all
joints and to receive paint / vinyl (elsewhere
measured) fixed to false ceilings, floor, curtain wall,
blockwork and partition walls all as per contractor's
design including all connection to walls, corners,
uprights and T connections all as per Architects
Drawing Nos NP/19/26/PD 06.5 R1, NP/19/26/PD 06.6
A PW1 overall size 6,788mm x 2,600 including cutouts for
FRD01 & FRD03, door frame and door elsewhere
measured. Skimmed gypsum surfaces to receive vinyl
finish elsewhere measured all as per architects
drawings and approval.
B PW2 overall size 6,788mm x 2,600. Skimmed gypsum
surfaces to receive vinyl finish elsewhere measured all
as per architects drawings and approval. No 1
C PW3 overall size 1,315mm x 2,600 including cutout for
APD07, door frame and door elsewhere measured.
Skimmed gypsum surfaces to receive vinyl finish
elsewhere measured all as per architects drawings and
Carried to Collection Rs
Supply and Install Partition Works
aoc.pdf