Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹26.5 LAccepted-Finance | ₹26.5 L | L 1 | Accepted-Finance L1 Bidder |
| 2 | L2₹26.7 LRejected-Finance | ₹26.7 L | L2 | Rejected-Finance L2 Bidder |
Tender Value
₹25.5 L
EMD Value
₹51,050
Closing Date
18 Jun 2026, 3:30 pmClosed
Executive Engineer Electrical Division HPPWD Mandi
Executive Engineer Electrical Division HPPWD Mandi
Running operation of HVAC system at SLBSGMC and H Nerchowk in Distt. Mandi HP
2026_PWD_136614_1
No.PW-MED-TA-Tender/2026- 1102-13 Dated- 05.06.2026
Open Tender
Electrical Works
Percentage
365 days
Nerchowk Distt- Mandi
As per SBD
14 documents required · 14 mandatory
₹2,000
₹51,050
14 Aug 2026
13 Jun 2026
19 Jun 2026
13 Jun 2026
18 Jun 2026
13 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Runnig operation of HVAC Plant at SLBS.Govt. Medical College and Hospital at Nerchowk Distt mandi (HP) following Special Terms and Condition :- | |||||
| 1.01 | Scope of Work :-Complete Operation and Monitoring of the HVAC System comprising of all the machineries & equipment installed in the HVAC Plant Room including Chillers ,Cooling Tower, Primary & Secondary Pump, Condenser pumps, VFD Air Handling Units, Ventilation Fans, Hot water Generator etc.throughout the period of contract for 24x7 One Year. | - | - | - | - |
| 1.02 | All type of Chemical provide by SLBSGMC/HPPWD(E) towards operation and monitoring of HVAC e.g water treatment, washing of cooling coil of all AHU'S installed in SLBSGMC Campus in all respect. | - | - | - | - |
| 1.03 | The temperature and humidity in all Operation theatre (Temp 21⁰C-23⁰C & relative humidity 40-60% ) should be maintain with all satisfication of Doctor's who will be operate. | - | - | - | - |
| 1.04 | Any work required for operation and monitoring in proper way as per the operation and monitoring of manuals of respective equipment or as engineering practices as per CPPWD general specification in HVAC works 2017-Appendix-H (monitoring) | - | - | - | - |
| 1.05 | Regular monitoring, cleanliness & upkey of the HVAC plant room,Cooling Tower terrace and nearby area is the scope of contractor | - | - | - | - |
| 1.06 | Work to be done during Contract period | - | - | - | - |
| 1.07 | Chillers :- Carrier Make | - | - | - | - |
| 1.08 | 1) Day to Day operation and routine monitoring, monitoring log book/ Register. | - | - | - | - |
| 1.09 | 2) Check the operating parameters of all Chillers and fill-out a daily log sheet | - | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.57 MB
SBD_HVAC.pdf
Tender Documents • 3.86 MB
BOQ_202196.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].