| 1 | L1₹3.7 LAdmitted-Finance | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ORION WEIGHING SYSTEMS L1 |
|---|---|---|---|---|
| 1.00Annual Maintenance Contract (AMC) for 60T Electronic Weighbridge at Phase-II &for 50T Electro-Mechanical Weighbridge at Phase-I for the year 2025-2027. | ||||
| 1.01 | Comprehensive Annual Maintenance contract (AMC) for 60T Electronic weighbridge at Phase II CD for Year1.
CAMC includes the following works:-
Comprehensive Annual Maintenance Contract for 60T Electronic Weighbridge at Phase II, Ambalamedu.The work includes on-call visit/ Breakdown visit/ service visit for routine service /calibration/ preventive maintenance of weigh bridge throughout the AMC period as per Annexure II –Special Terms& Conditions. | 1 | LS | 88,000 ₹88,000 Lowest |
| 1.02 | Comprehensive Annual Maintenance contract (AMC) for 60T Electronic weighbridge at Phase II CD for Year2.
CAMC includes the following works:-
Comprehensive Annual Maintenance Contract for 60T Electronic Weighbridge at Phase II, Ambalamedu.The work includes on-call visit/ Breakdown visit/ service visit for routine service /calibration/ preventive maintenance of weigh bridge throughout the AMC period as per Annexure II –Special Terms& Conditions. | 1 | LS | 88,000 ₹88,000 Lowest |
| 1.03 | Lifting up & Descending down of the 60T weigh bridge platform at phase-II for Inspection works/ Refurbishment/ Painting etc. The work involves:-
i) Lifting of the entire Weighbridge platform using hydraulic jack/lifting tools to a specified height (up to 1m) as needed for any Mechanical inspections underneath the platform structure. The platform then shall be supported on Blocks/Supports provided by FACT.
ii) Removal of all Load cells (max 6 numbers) from the Weighbridge after proper disconnections at the Load cell junction Box.
iii) After the inspection & subsequent related works by FACT, descending the uplifted Weighbridge platform using hydraulic jack/lifting tools. All load cells to be fixed back along with proper connections at the junction Box and routing through the cable pipes. The platform shall be descended to a level just above all the Load cell corners as required for further final alignments.
iv) Performing calibration check, corner test.
v) Checking/ ensuring normal functionality. .
After completion, the weighbridge should be handed over to FACT for stamping. | 3 | AU | 72,000 ₹72,000 Lowest |
| 1.04 | Liaison and coordination with Legal Metrology Department for annual re-verification and stamping of the 60T weighbridge at phase-II.
Contractor`s scope of work:
(i) The scope of work includes minor preparatory works, Liaison and coordination with Legal Metrology Department for annual re-verification and stamping of the specified weighbridge.
(ii) All the transportation arrangements & related costs incurred shall be borne by the contractor.
(iii) The contractor shall meet all the incidental expenses in connection with verification & stamping.
(iv) All necessary tools & tackles required for the work.
(v) The contractor shall complete the annual re-verification and stamping works before the due dates of Stamping for Electronic Weigh bridge (60T) at Phase-II area, Ambalamedu.
(vi) After the completion of the work, the contractor shall collect the verification/ stamping certificates from the Legal Metrology Department and hand over to FACT, without delay.
FACT’s scope of work:
(i) The Stamping fees for the Annual re-verification and stamping of the specified Electronic Weighbridges shall be in the scope of FACT. | 3 | NO | 45,000 ₹45,000 Lowest |
| 1.05 | On-Call maintenance visit for 50T Electro-Mechanical Weighbridge at phase-I.
The Job includes servicing of 50T Electro-Mechanical Weighbridge on demand or on breakdown as per scope of work and Terms & conditions of this contract. as per Annexure- II special terms and conditions of the work. | 2 | AU | 40,000 ₹40,000 Lowest |
| 1.06 | Liaison and coordination with Legal Metrology Department for annual re-verification and stamping of the 50T Electro Mechanical weighbridge at phase-I.
Contractor`s scope of work:
(vii) The scope of work includes minor preparatory works, Liaison and coordination with Legal Metrology Department for annual re-verification and stamping of the specified weighbridges.
(viii) All the transportation arrangements & related costs incurred shall be borne by the contractor.
(ix) The contractor shall meet all the incidental expenses in connection with verification & stamping.
(x) All necessary tools & tackles required for the work.
(xi) The contractor shall complete the annual re-verification and stamping works before the due dates of Stamping for Electro Mechanical Weighbridge at Phase-I area, Ambalamedu (50T).
(xii) After the completion of the work, the Contractor shall collect the verification/stamping certificates from the Legal Metrology Department and hand over to FACT, without delay.
FACT’s scope of work:
The Stamping fees for the Annual re-verification and stamping of the specified Electronic Weighbridges shall be in the scope of FACT. | 2 | LS | 40,000 ₹40,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
13 Sept 2025, 3:00 pmClosed
NITHIN C S
SM (P and P)
Annual Maintenance Contract (AMC) for 60T Electronic Weighbridge at Phase-II and for 50T Electro-Mechanical Weighbridge at Phase-I for the year 2025-2027.
2025_FACT_873351_1
04028/2025-2026/E31984
Open Tender
Miscellaneous Works
Item Rate
720 days
AMBALAMEDU
As per PQC
8 documents required · 8 mandatory
₹0
₹5,000
Yes
29 Sept 2025
14 Aug 2025
15 Sept 2025
14 Aug 2025
13 Sept 2025
14 Aug 2025
Annual Maintenance Contract (AMC) for 60T Electronic Weighbridge at Phase-II &for 50T Electro-Mechanical Weighbridge at Phase-I for the year 2025-2027.
Comprehensive Annual Maintenance contract (AMC) for 60T Electronic weighbridge at Phase II CD for Year1. CAMC includes the following works:- Comprehensive Annual Maintenance Contract for 60T Electronic Weighbridge at Phase II, Ambalamedu.The work includes on-call visit/ Breakdown visit/ service visit for routine service /calibration/ preventive maintenance of weigh bridge throughout the AMC period as per Annexure II –Special Terms& Conditions.
Comprehensive Annual Maintenance contract (AMC) for 60T Electronic weighbridge at Phase II CD for Year2. CAMC includes the following works:- Comprehensive Annual Maintenance Contract for 60T Electronic Weighbridge at Phase II, Ambalamedu.The work includes on-call visit/ Breakdown visit/ service visit for routine service /calibration/ preventive maintenance of weigh bridge throughout the AMC period as per Annexure II –Special Terms& Conditions.
Lifting up & Descending down of the 60T weigh bridge platform at phase-II for Inspection works/ Refurbishment/ Painting etc. The work involves:- i) Lifting of the entire Weighbridge platform using hydraulic jack/lifting tools to a specified height (up to 1m) as needed for any Mechanical inspections underneath the platform structure. The platform then shall be supported on Blocks/Supports provided by FACT. ii) Removal of all Load cells (max 6 numbers) from the Weighbridge after proper disconnections at the Load cell junction Box. iii) After the inspection & subsequent related works by FACT, descending the uplifted Weighbridge platform using hydraulic jack/lifting tools. All load cells to be fixed back along with proper connections at the junction Box and routing through the cable pipes. The platform shall be descended to a level just above all the Load cell corners as required for further final alignments. iv) Performing calibration check, corner test. v) Checking/ ensuring normal functionality. . After completion, the weighbridge should be handed over to FACT for stamping.
Liaison and coordination with Legal Metrology Department for annual re-verification and stamping of the 60T weighbridge at phase-II. Contractor`s scope of work: (i) The scope of work includes minor preparatory works, Liaison and coordination with Legal Metrology Department for annual re-verification and stamping of the specified weighbridge. (ii) All the transportation arrangements & related costs incurred shall be borne by the contractor. (iii) The contractor shall meet all the incidental expenses in connection with verification & stamping. (iv) All necessary tools & tackles required for the work. (v) The contractor shall complete the annual re-verification and stamping works before the due dates of Stamping for Electronic Weigh bridge (60T) at Phase-II area, Ambalamedu. (vi) After the completion of the work, the contractor shall collect the verification/ stamping certificates from the Legal Metrology Department and hand over to FACT, without delay. FACT’s scope of work: (i) The Stamping fees for the Annual re-verification and stamping of the specified Electronic Weighbridges shall be in the scope of FACT.
On-Call maintenance visit for 50T Electro-Mechanical Weighbridge at phase-I. The Job includes servicing of 50T Electro-Mechanical Weighbridge on demand or on breakdown as per scope of work and Terms & conditions of this contract. as per Annexure- II special terms and conditions of the work.
Liaison and coordination with Legal Metrology Department for annual re-verification and stamping of the 50T Electro Mechanical weighbridge at phase-I. Contractor`s scope of work: (vii) The scope of work includes minor preparatory works, Liaison and coordination with Legal Metrology Department for annual re-verification and stamping of the specified weighbridges. (viii) All the transportation arrangements & related costs incurred shall be borne by the contractor. (ix) The contractor shall meet all the incidental expenses in connection with verification & stamping. (x) All necessary tools & tackles required for the work. (xi) The contractor shall complete the annual re-verification and stamping works before the due dates of Stamping for Electro Mechanical Weighbridge at Phase-I area, Ambalamedu (50T). (xii) After the completion of the work, the Contractor shall collect the verification/stamping certificates from the Legal Metrology Department and hand over to FACT, without delay. FACT’s scope of work: The Stamping fees for the Annual re-verification and stamping of the specified Electronic Weighbridges shall be in the scope of FACT.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .