Tender Value
₹2.0 Cr
EMD Value
₹4.0 L
Closing Date
20 Mar 2026, 3:00 pmClosed
CHIEF ENGINEER
NAGAR NIGAM BAREILLY
Ward-29 in Basant Vihar Colony from Ram Swaroop to Anil Gautam, from Devraj Gangwar to Anuj Gangwar, from Anuj Gangwar to Rajendra, link lane from Balak Ram, from Mohan Lal Sharma to Vinod Singh, from in front of Noori Kirana Store on Su Rahpura Road
2026_DOLBU_1124558_1
417/CE/CD/25-26 (1 To 20) Sr No 11 Tender List 24 Date-11.03.2026
Open Tender
Civil Works
Percentage
180 days
BAREILLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
Bareillye-tender.com
₹4.0 L
21 May 2026
13 Mar 2026
20 Mar 2026
13 Mar 2026
20 Mar 2026
13 Mar 2026
Dismantling of old damage brick work and stone work i/c stacking of dismantlled materials as directed by E/I.within a distance of 60.00M. (S.I.No.692)
Dismantling of old damaged c.c. road and stacking of dismantlled materials as directed by E/I.within a distance of 60.00M.(Non Schedule Item No.3
Dismantling of old damaged B.O.E. soling and Interlocking tiles stacking of dismantlled materials as directed by E/I.within a distance of 60.00M.(Non Schedule Item No.1)
Dismantling of old damaged B.O.E. soling and Interlocking tiles stacking of dismantlled materials as directed by E/I.within a distance of 60.00M.(Non Schedule Item No.1)
Disposal of debris upto 5km qty Same as (cubical content item no. 1+2) cubical content of item no. 1 & item no. 2
Excavation in foundation in ordinary soil foul requiring the use of special T&P such as pickaxe, subbles etc. (Loam, Clay or sand) including, lift upto 1.50 M and lead Upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30.0m from the foundation trencches. (Excluding Royalty)( S.I. No.251)
Supply of Earth for filling or embankment in ordinary soil earth work in filling or embankment to be in 20 cm layers, including ,watering ,Dressing ,compacting ,ramming the soil to achive 95% proctor density ,and dressing the surface to be required levels and slope and also including 1.50m lift and 30 m lead . The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m distance as directed by the Engineer-in-charge. (Excluding Royalty) Analysis rate
Providing and layingConcrete with 4cm gauge brick ballast, fine sand of 1.25 fineness modulous and cement in prportion of 1:6:12 in foundation in under floor , including supply of all material labour and T&P etc rfequired of proper completetion of the work .
First class B/w in 1:4 Cement C'sand mortor in F/P including supply of all meterial labour T&P etc required for proper completion of work.
12 mm thick plaster in 1:5 cement & c'sand mortor over brick work minimum thickness not less then 10 mm including all supply of meterial , Labour T&P etc required for proper completetion of the work.
Providing laying C.C with 2cm gauge approved stone ballast, approved coarse sand and cement in praportion of 1:2:4 including supply of all materials, labour and T&P etc required for proper completetion of the work.
RCC 1:1.50:3 with cement c'sand stone grit of 20 mm gauge in Slabs excluding supply of reinforcement with its bending but including its binding & fixing with supply of all meterial labour T&P etc. required for proper completion of the work.
Mild steel or Iron for plain work such as reinforced concrete brought to proper shape as necessary including its bending with supply of steel with overlaps & wastage also required for proper completion of the work as directed by E/I.
P/L of 125 micron Plastic Sheet
Construction of Granular sub (G.S.B.) by providing, laying, spreding and compacting speciffied graded crushed stone in sub base coarse including premixing the materials at O.M.C. in mechanical mixer (Plug Mill) including carriage of mixed msterials, laying in uniform layers with power roller to achieve the desired density including all materials, labour, machinery, lighting gaurding, barricading and maintance of diversion complete of as per MoRT & HT technical specification clause No. 404B (G3)
Cement concrete with 2 cm. gauge approved stone, ballast, approved coarse sand and cement in the proportion of 3:1.50:1 including supply of all materials, labour and T&P etc. required for proper completion of the work
Supplying and Fixing of 19mm thick Black mirror inaugration stone of size 900X600mm . Including base of 230X900mm brick base with foundation and 230mm x230 brick work around the stone, back base 115mm thick brick work,plastering and painting all copmlete as per direction of E/I.
Deduction cost of bats Qty item no 1
Deduction cost of bricks Qty item no 1+2
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 17.78 MB
BOQ_2095664.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .