Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.3 LAccepted-AOC | 1 | Accepted-AOC 1 | |
| 2 | 2₹4.3 L+₹9,467.96 (2.23%)Rejected-Finance SITARGANJ UDHAM SINGH NAGAR | UDAM SINGH NAGAR | UTTARAKHAND | 244712 | 2 | Rejected-Finance 2 |
| Sl No | Description | Qty | Unit | M/S SURESH KUMAR JAIN L2 | M/s Balaji Traders L1 |
|---|---|---|---|---|---|
| 1.00 | Cleaning thick bushes and thorny jungle without uprooting sor ch- 5 (23) | 25,287.5 | M2 | 5.25 ₹1,32,759.38 | 5.12 ₹1,29,472 Lowest |
| 2.00 | Scraping internal section of existing channel i.e. Bed & slope with silt up to 5cm. Sor ch-5(19) | 36,662.3 | M2 | 5.35 ₹1,96,143.31 | 5.24 ₹1,92,110.45 Lowest |
| 3.00 | Earth work in silt clearance including lift up to 1.5 M and lead up to 30M including ramming and dressing by manual labour or machines. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge(Dys & Minors.)Extra for slush and level for earth work excluding dewatering.( SOR Ch 5.10) | 1,057.99 | M3 | 100 ₹1,05,799 | 97.97 ₹1,03,651.28 Lowest |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
15 Oct 2025, 1:00 pmClosed
EXECUTIVE ENGINEER
BAREILLY
Silt clearance of Bara Canal from Km. 4.200 to 14.380
2025_UPIDC_1081305_18
03/EE/2025-26
Open Tender
Civil Works - Canal
Item Rate
BAREILLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹677
₹10,000
4 Nov 2025
10 Oct 2025
15 Oct 2025
10 Oct 2025
15 Oct 2025
10 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .