Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹23.3 LAccepted-Finance | 1 | Accepted-Finance L1 |
| Sl No | Description | Qty | Unit | ANOOP M S L1 |
|---|---|---|---|---|
| 1.00STONE BLASTING | ||||
| 1.00 | 2.9.3:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Hard rock (blasting prohibited) | 675 | cum | 1,594.53 ₹10,76,307.75 Lowest |
| 1.00 | 2.26.2:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock | 112.5 | cum | 237.4 ₹26,707.5 Lowest |
| 1.00 | OD253058/2024-2025:(od from 2.26.2) Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock-2nd lift | 112.5 | cum | 474.79 ₹53,413.88 Lowest |
| 1.00 | OD253057/2024-2025:(od from 2.26.2)Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock-3rd lift | 112.5 | cum | 712.21 ₹80,123.63 Lowest |
| 1.00 | OD253056/2024-2025:(od from 2.26.2)Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock-4th lift | 112.5 | cum | 949.59 ₹1,06,828.88 Lowest |
| 1.01 | OD253082/2024-2025:(od from 2.26.2) Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock-5th lift | 112.5 | cum | 1,186.99 ₹1,33,536.38 Lowest |
| 1.01 | OD253081/2024-2025:(od from 2.26.2)Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock-sixth lift | 37.5 | cum | 1,424.38 ₹53,414.25 Lowest |
| 1.01 | 2.7.3:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Hard rock (blasting prohibited) | 460 | cum | 1,500.37 ₹6,90,170.2 Lowest |
| 1.01 | OD238369/2024-2025:coolie for labour | 36 | Day | 1,093.3 ₹39,358.8 Lowest |
Tender Value
₹21.2 L
EMD Value
₹50,000
Closing Date
9 Mar 2026, 6:55 pmClosed
EXECUTIVE ENGINEER
Office of the Executive Engineer, LID and EW Division, Malappuram, civil station, Malappuram District Panchayath Building, Malappuram, 676505
GENERAL-Disaster management - Dismantling of dangerous rock at Kayattathinal in Ward 14 of Vettathur Grama Panchayath in Perinthalmanna Taluk -PROPOSAL-General Civil Work (Retender)
2026_LSGD_841763_1
DB1/TN/EE/60/25-26
Open Tender
Civil Works - Others
Item Rate
365 days
MALAPPURAM
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,950
₹50,000
Yes
4 Apr 2026
2 Mar 2026
11 Mar 2026
2 Mar 2026
9 Mar 2026
2 Mar 2026
STONE BLASTING
2.9.3:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Hard rock (blasting prohibited)
2.26.2:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock
OD253058/2024-2025:(od from 2.26.2) Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock-2nd lift
OD253057/2024-2025:(od from 2.26.2)Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock-3rd lift
OD253056/2024-2025:(od from 2.26.2)Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock-4th lift
OD253082/2024-2025:(od from 2.26.2) Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock-5th lift
OD253081/2024-2025:(od from 2.26.2)Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock-sixth lift
2.7.3:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Hard rock (blasting prohibited)
OD238369/2024-2025:coolie for labour
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1419765.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
01_TENDER_60.rar
Tender Documents • 6.18 MB
BOQ_1419765.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .