| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.9 LAccepted-AOC | ₹11.9 L | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical MNB BUSINESS HUB VADAVUCODE AMBATTU KUZHIKKZDU VILLAGE TOWN PUTHENCRUZ CITY ERNAKULAM ERNAKULAM KERALA 682303 INDIA | ERNAKULAM | KERALA | 682303 | - | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | creative construction Group L2 | sivanandankk L1 |
|---|---|---|---|---|---|
| 1.00Ramp Construction | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 46.46 | cum | 358 ₹16,634.11 | 337.42 ₹15,677.88 Lowest |
| 1.00 | 51.2.3:Filling with Quarry Muck Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 5.81 | cum | 908 ₹5,273.66 | 853.18 ₹4,955.27 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 3.87 | cum | 7,930 ₹30,704.96 | 7,441.05 ₹28,811.75 Lowest |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 30.98 | cum | 9,235 ₹2,86,063.36 | 8,663.34 ₹2,68,355.62 Lowest |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 105.6 | sqm | 385 ₹40,656 | 362.22 ₹38,250.43 Lowest |
| 1.01 | 10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 2,973.8 | kg | 140 ₹4,16,332 | 131.7 ₹3,91,649.46 Lowest |
| 1.01 | 10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes | 1,345.2 | kg | 194 ₹2,60,968.8 | 182.23 ₹2,45,135.8 Lowest |
| 1.01 | OD475800/2025-2026:Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of
corrugation as approved by Engineer-in-charge) 0.350 mm (+0.05%), total coated thickness
with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy
primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have
protective guard film of 25 microns minimum to avoid scratches during transportation and
should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The
sheet shall be fixed using self drilling/self tapping screws of size (5.5x55mm) with EPDM seal,
complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins,
rafters and trusses and including cutting to size and shape wherever required.(Modified 12.50) | 96.8 | sqm | 622 ₹60,209.6 | 584.2 ₹56,550.56 Lowest |
| 2.00Design | |||||
Tender Value
₹12.7 L
EMD Value
₹31,773
Closing Date
2 Mar 2026, 12:00 pmClosed
Asst Exe Engineer
Asst Exe Engineer,Thrippunithura Municipality
Annual Plan-487-26 THRIPUNITHURA MUNICIPALITY-PROVIDING RAMP FACILITY TO THALUK HOSPITAL-General Civil Work-IN WARD 38
2026_LSGD_839895_1
PW1-517354/26
Open Tender
Civil Works - Buildings
Item Rate
180 days
Tripunithura
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹31,773
Yes
19 Sept 2026
24 Feb 2026
3 Mar 2026
24 Feb 2026
2 Mar 2026
24 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Ramp Construction | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 46.46 | cum | - | - |
| 1.002 | 51.2.3:Filling with Quarry Muck Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 5.81 | cum | - | - |
| 1.003 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 3.87 | cum | - | - |
| 1.004 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 30.98 | cum | - | - |
| 1.005 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 105.6 | sqm | - | - |
| 1.006 | 10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 2,973.8 | kg | - | - |
| 1.007 | 10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes | 1,345.2 | kg | - | - |
| 1.008 | OD475800/2025-2026:Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of
corrugation as approved by Engineer-in-charge) 0.350 mm (+0.05%), total coated thickness
with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy
primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have
protective guard film of 25 microns minimum to avoid scratches during transportation and
should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The
sheet shall be fixed using self drilling/self tapping screws of size (5.5x55mm) with EPDM seal,
complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins,
rafters and trusses and including cutting to size and shape wherever required.(Modified 12.50) | 96.8 | sqm | - | - |
| 2Design | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1415532.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.84 MB
BOQ_1415532.xls
BOQ • 0.31 MB
viewsbd.pdf
Tender Documents • 1.70 MB
FOT.pdf
Tender Documents • 0.02 MB
EpaymentForm.pdf
Tender Documents • 0.02 MB
IntegrityPact.pdf
Tender Documents • 0.01 MB
affdt.pdf
Tender Documents • 0.03 MB
PA.pdf
Tender Documents • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .