| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44,360.15Accepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹4.7 L+₹4.3 L (959.6%)Accepted-Finance | L2 | Accepted-Finance Accepted | |
| 3 | L3₹5.4 L+₹4.9 L (1112.0%)Accepted-Finance | L3 | Accepted-Finance Accepted |
Tender Value
Refer Docs
EMD Value
₹10,179
Closing Date
23 Jun 2023, 4:00 pmClosed
EE-II(Works), PBMC
EE-II(Works), PBMC
Widening of footpath side drain with covering slab and M S Jalli and construction of RCC retaining wall and hand railing starting from Shri Chinna Rao Pan Shop Shri Appan house Shri Appal Swamy house to Shri Jai Ram Kerketta Japan Road at Dairy Farm
2023_PMBC_10618_1
13/EE-II/WKS/MC/2023-24
Open Tender
Construction Works
Works
90 days
Japan Road Dairy Farm in Ward No.15
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹10,179
Yes
23 Jun 2023
16 Jun 2023
23 Jun 2023
16 Jun 2023
23 Jun 2023
16 Jun 2023
Amount
Centering and shuttering including strutting, propping etc. and removal of form for: a)Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : a)1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for: a)Columns, Pillars, Piers, Abutments, Posts and Struts
Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but , excluding cost of reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : a) 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natu ral sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. A)Thermo-Mechanically Treated bars of grade Fe-500D or more.
12 mm cement plaster of mix : a) 1:4 (1 cement: 4 fine sand)
Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. A) G.I. pipe
M/s SELVAM CONSTRUCTIONS
A R NATARAJAN
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .