Tender ID
Tender Value
₹3.2 Cr
EMD Value
₹6.3 L
Closing Date
20 Mar 2026, 6:00 pmClosed
Executive Engineer, Sabarantha R & B Panchayat Division, Himmatnagar
CONSTRUCTION OF MINOR BRIDGE AT CH. 0.460 KM ON BADARKHA KATHRODI VASAHAT ROAD UNDER PM JANMAN, BATCH-1, 2025 - 26 (Package No. GJ-2108-BR1) TALUKA- VIJAYNAGAR, DIST- SABARKHANTHA
285283
17/2025-26
Open
Civil Works - Bridges
Works
Sabarkantha
₹6,000
Yes
Executive Engineer, Panchayat R & B Division, Himatnagar
₹6.3 L
Yes
11 Mar 2026
11 Mar 2026
11 Mar 2026
20 Mar 2026
11 Mar 2026
permission from the Engineer shall be obtained in respect of all other items of works prior to
proceeding with the next stage of construction.
1801.5 The Contractor shall carry out any modifications in the procedure of work, if
found necessary during inspections at any of the three tiers of quality control as outlined in
Clauses 1801.1.1, 1801.1.2 and 1801.1.3 or as directed by the Engineer. Works falling short
of quality shall be rectified/redone by the Contractor at his own cost, and defective work shall
also be removed from the site of works by the Contractor at his own cost.
1801.6 The cost of field laboratory building including services, essential supplies like
water, electricity, sanitary services and their maintenance and cost of all equipment, tools,
materials, labour and incidentals to perform tests and other operations of quality control
according to the Specification requirements shall be deemed to be incidental to the work and
no extra payment shall be made for the same.
1801.7 For testing of samples of soils/soil mixes, granular materials and mixes,
bituminous materials and mixes, aggregates, cores, etc. samples in the required quantity
and form shall be taken by the Contractor at his own cost.
1801.8 For cement, bitumen, mild steel, and similar other materials where essential
tests are to be carried out at the manufacturer’s plant or at laboratories other than the field
laboratory, the cost of samples, sampling, testing and furnishing of test certificates shall be
borne by the Contractor. He shall also furnish the test certificates to the Engineer.
1801.9 For testing of cement concrete at site during construction, arrangements for
supply of samples, testing and supply of test results shall be made by the Contractor as per
the frequency and number of tests specified in the Quality Assurance Handbook for Rural
Roads issued by the NRRDA, May, 2007 and relevant IS Codes or relevant clauses of these
Specifications, the cost of which shall be borne by the Contractor.
1801.10 The method of sampling and testing of materials shall be as required by the
Quality Assurance Handbook for Rural Roads, issued by the NRRDA, May, 2007. Where
they are contradicting, the provision in these Specifications shall be followed. Where they are
silent, sound engineering practice or directions of the Engineer shall be followed.
1801.11 The materials for embankment construction shall be got approved from the
Engineer. The responsibility for arranging and obtaining the land for borrowing or exploitation
Quality Control Section
in any other way shall rest with the Contractor, who shall ensure smooth and uninterrupted
supply of materials in the required quantity during the construction period.
Similarly, the supply of aggregates for construction of road pavement shall be from quarries
approved by the Engineer. Responsibility for arranging uninterrupted supply of materials
from the source shall be that of the Contractor.
1801.12 All materials which the Engineer/his representative has determined as not
conforming to the requirements of the contract shall be rejected whether in place or not;
they shall be removed immediately from the site as directed. Materials, which have been
subsequently corrected, shall not be used in the works unless approval is accorded in writing
by the Engineer. Upon failure of the Contractor to comply with any order of the Engineer/his
representative, given under this Clause, the Engineer/his representative shall have authority
to cause the removal of rejected material and to deduct the cost of removal thereof from any
payments due to the Contractor.
1802 Control of Alignment, Level and Surface regularity
All works performed shall conform to the lines, grades, cross-sections and dimensions shown
on the drawings or as directed by the Engineer, subject to the permitted tolerances described
1802.2 Horizontal Alignment
Horizontal alignment shall be reckoned with respect to the centerline of the carriageway as
shown on the drawings. The permitted tolerances for the edges of the carriageway and for
the edges of the roadway and lower layers of pavement in plain and rolling terrain and in hilly
terrain are given in Table 1800.1:
Table 1800.1 Permitted Tolerances for Horizontal Alignment
In Plain & In Hilly Terrain
Rolling Terrain
Edges of carriageway ± 20 mm ± 30 mm
Edges of roadway and lower ± 30 mm ± 50 mm
layers of pavement
1802.3 Surface Levels
The levels of the subgrade and different pavement courses as constructed, shall not
vary from those calculated with reference to the longitudinal and cross-profile of the road
shown on the drawings or as directed by the Engineer beyond the tolerances mentioned in
Section 1800 Quality Control
Table 1800.2 Permitted Tolerances in Surface Levels
1) Subgrade + 20 mm – 25 mm
2) Sub-base + 10 mm – 20 mm
a) Gravel/Soil Aggregate, Cement treated soil, wet mix + 10 mm – 10 mm
macadam, shoulder construction and machine laid
crusher run macadam
b) Manually laid crusher run macadam + 15 mm – 15 mm
c) Waterbound macadam + 15 mm – 15 mm
d) Stone set pavement + 15 mm – 15 mm
e) Bituminous macadam + 6 mm – 6 mm
4) Surface Course
a) Surface dressing, premix carpet and mix seal
- machine laid + 6 mm – 6 mm
- manually laid + 10 mm – 10 mm
b) Semi Dense Bituminous concrete + 6 mm – 6 mm
c) Cement concrete pavement + 5 mm – 5 mm
(upto – 8 mm at 0-300 mm from the edges)
Provided, however, that the negative tolerance for wearing course shall not be permitted in
conjunction with the positive tolerance for base course, if the thickness of the former is thereby
reduced by more than 6 mm for flexible pavements and 5 mm for concrete pavements.
For checking compliance with the above requirement for subgrade, sub-base and base
courses, measurements of the surface levels shall be taken on a grid of points placed at
10 m longitudinally and 2.5 m transversely. For any 10 consecutive measurements taken
longitudinally or transversely, not more than one measurement shall be permitted to exceed
the tolerance as above, this one measurement being not in excess of 5 mm above the
permitted tolerance.
For checking the compliance with the above requirement for bituminous wearing courses
and concrete pavements, measurements of the surface levels shall be taken on a grid of
points spaced at 6.25 m along the length and at 0.5 m from the edges and at the centre of
the pavement. In any length of pavement, compliance shall be deemed to be met for the final
road surface, only if the tolerance given above is satisfied for any point on the surface.
Quality Control Section
1802.4 Surface Regularity of Pavement Courses
The maximum allowable difference between the road surface and underside of a 3 m straight-
edge when placed parallel with, or at right angles to the centreline of the road at points
decided by the Engineer shall be as indicated in Table 1800.3.
Table 1800.3 Maximum Permissible Undulation
Type of Construction Maximum Permissible Undulation
(Measured with 3m Straight Edge)
Longitudinal Cross Profile
1) Sub-grade 20 mm 15 mm
2) Sub-base course 12 mm 10 mm
a) Gravel/soil aggregate, cement stabilized 12 mm 10 mm
b) WBM Grade 1 15 mm 12 mm
c) WBM Grade 2/Grade 3 and crusher run 12 mm 8 mm
d) Wet mix macadam 10 mm 8 mm
e) Bituminous macadam 12 mm 8 mm
4) Surface Course
a) Stone set pavement 12 mm 10 mm
b) Surface dressing 10 mm 12 mm
c) Premix carpet, mix seal surfacing 8 mm 8 mm
d) Semi Dense Bituminous Concrete 6 mm 4 mm
e) Cement concrete pavement 6 mm 6 mm
1802.5 Rectification
Where the surface regularity of subgrade and the various pavement courses fall outside the
specified tolerances, the Contractor shall be liable to rectify these in the manner described
below and to the satisfaction of the Engineer.
i) Subgrade : Where the surface is high, it shall be trimmed and suitably
compacted. Where the same is low, the deficiency shall be corrected by
scarifying the lower layer and adding fresh material and recompacting to
Section 1800 Quality Control
the required density. The degree of compaction and the type of material
to be used shall conform to the requirements of Section
ii) Granular Sub-base : Same as at (i) above, except that the degree of
compaction and the type of material to be used shall conform to the
requirements of Section
iii) Lime/Cement Stabilized Soil Sub-base : For lime/cement treated
materials where the surface is high, the same shall be suitably trimmed
while taking care that the material below is not disturbed due to this
operation. However, where the surface is low, the same shall be
corrected as described hereinbelow.
For cement treated material, when the time elapsed between detection
of irregularity and the time of mixing of the material is less than 2 hours,
the surface shall be scarified to a depth of 50 mm supplemented with
freshly mixed materials as necessary and recompacted to the relevant
specification. When this time is more than 2 hours, the full depth of
the layer shall be removed from the pavement and replaced with fresh
material to Specification. This shall also apply to lime treated material
except that the time criterion shall be 3 hours instead of 2 hours.
iv) Water Bound Macadam/Wet Mix Macadam Sub-base/Base : Where
the surface is high or low, the top 75 mm shall be scarified, reshaped with
added material as necessary and recompacted as per requirements of
v) Bituminous Constructions : For bituminous construction other than
wearing course, where the surface is low, the deficiency shall be
corrected by adding fresh material over a suitable tack coat if needed
and recompacting to specifications. Where the surface is high, the full
depth of the layer shall be removed and replaced with fresh material
and compacted to specifications.
For wearing course, where the surface is high or low, the full depth of the
layer shall be removed and replaced with fresh material and compacted
to specifications. In all cases where the removal and replacement of a
bituminous layer is involved, the area treated shall be not less than 5 m
in length and not less than 3.5 m in width.
vi) Dry Lean Concrete Sub-base/Roller Compacted Cement
Concrete : The defective length of the course shall be removed to
full depth and replaced with material conforming to Section 1500, as
applicable. The area treated shall be at least 3 m long, not less than
1 lane wide and extend to the full depth. Before relaying the course,
the disturbed subgrade or layer below shall be corrected by levelling,
watering and compaction.
vii) Cement Concrete Pavement : The defective areas having surface
irregularity exceeding the specified limits may be rectified by bump
Quality Control Section
cutting or scabbling or grinding using approved equipment. When
required by the Engineer, areas which have been reduced in level by
the above operation(s) shall be retextured in an approved manner either
by cutting grooves (5 mm deep) or roughening the surface by hacking
the surface. If high areas in excess of 6 mm or low areas in excess of
3 mm occur, exceeding the permitted numbers and if the Contractor
cannot rectify, the slab shall be demolished and reconstructed by the
Contractor at his own expense and in no case the area removed shall
be less than the full width of the lane in which the irregularity occurs
and full length of the slab.
If deemed necessary by the Engineer, any section of the slab which
deviates from the specified levels and tolerances, shall be demolished
and reconstructed by the Contractor at his own expense.
1803 Quality Control Tests
The materials supplied and the works carried out by the Contractor shall conform to the
specifications prescribed in relevant Sections of these Specifications.
For ensuring the requisite quality of construction, the materials and works shall be subjected
to quality control tests, as described hereinafter. The testing frequencies set forth are the
desirable minimum and the Engineer shall have the full authority to require the Contractor
to carry out additional tests as frequently as he may deem necessary, to ensure that the
materials and works comply with the appropriate specifications. However, the number of
tests recommended in Tables 1800.4 to 1800.55 may be reduced at the discretion of the
Engineer if it is felt that consistency in the quality of materials can still be maintained.
Test procedures for the various quality control tests are indicated in the respective Sections
of these Specifications or for certain tests within this Section. Where no specific testing
procedure is mentioned, the tests shall be carried out as per sound engineering practice or
as per directions of the Engineer.
1803.2 Tests on Earthwork
1803.2.1 Tests prior to construction
The quality control tests to be carried out prior to construction and their frequency shall be as
given in Table 1800.4.
Section 1800 Quality Control
Table 1800.4 Quality Control Tests Prior to Construction
Type of Test Frequency
A. Earthwork for Embankment
1) Soil Classification as per IS:1498 One test from each source
i) Sieve Analysis (Wet Sieve Analysis except for for one km length, or part
cohesionless soils) thereof.
ii) LL, PL and PI
2) Standard Proctor Compaction Test (IS:2720 Part 7). -do-
Test results to ascertain Dry Density-Moisture Content
3) Free Swell Index Test (IS:2720 Part 40)(a). -do-
4) Deleterious Content(b)
i) Organic matter content by loss-on-Ignition -do-
method or as per IS:2720-Part
ii) Total soluble sulphate content (IS:2720-Part 27) -do-
where suspected on past experience. This can
be easily confirmed by a quick test using Barium
B. Earthwork for Subgrade (Cutting or Filling)
i) Tests at 1 to 4, under A above. (In case the soil for One test for each km length
embankment meets the prescribed requirements or part thereof, from each
for the Subgrade, the above four tests need not source.(c)
ii) CBR Test (IS:2720 Part 16) soaked/unsoaked One test for each km: this
as specified. will comprise testing of
specimens and the CBR value
will be reported as average of
the three test values.
a) Test for free swell index to be conducted only in case of expansive soils.
b) Presence of deleterious content can be initially detected through colour, odour and
existence of any organic matter. Where such observations justify need for further
testing, simple tests at (i) and (ii) above shall be carried out. Detailed testing as
per IS:2720-Part 22 and Part 27 shall be done only after presence of deleterious
content is confirmed by simple tests.
c) For hill roads, the frequency of tests may be increased depending upon the variability
of the strata met.
1803.2.2 Tests during construction
The quality control tests to be carried out during construction and their frequency shall be as
given in Table 1800.5.
Quality Control Section
Table 1800.5 Quality Control Tests during Construction
Type of Test Frequency
1) Placement Moisture (IS:2720 Part 2) Where At least 3 tests daily (well spread over
facility for oven drying is not available, any of the day’s work)
the following quick test methods can be used:
i) Sand bath method
ii) Rapid moisture meter
2) Insitu Density Measurements (IS:2720 Part 28) -do-
(Each layer) i) Average of 3 tests results shall
not be less than the specified
degree of compaction.
ii) Individual test values of the
degree of compaction obtained
shall not be less than 1 percent
of the specified value of degree
(For example, for the specified
100 percent Proctor density, the
individual test value shall not be less
than 99 percent of Proctor density
and the average of the three (or
more) tests carried out in a day shall
not be less than 100 percent Proctor
3) Thickness of subgrate layer At random
1803.3 Tests on Granular Sub-Base
1803.3.1 Tests prior to construction
The quality control tests to be carried out prior to construction and their frequency shall be as
given in Table 1800.6.
Section 1800 Quality Control
Table 1800.6 Quality Control Tests Prior to Construction
Type of Test Frequency
1) Soil Classification as per IS:1498. Average of three tests from each source.
i) Wet Sieve Analysis, except for
cohesionless soils
ii) Liquid and Plastic Limits
2) Combined Grading and Plasticity tests on One test on the combined material for
materials from different sources, mixed in m length of road or part thereof.
the design proportions. This shall be done
when materials from more than one source
3) Proctor Compaction Test (IS:2720 Part 7) One test on the material from each source
or on the combined material, as the case
4) Wet Aggregate Impact Value Test (IS:5640) One test from each source identified by
where soft/marginal aggregates are used the Contractor.
e.g, Laterite, Kankar, Brick Ballast etc.
5) CBR test (IS:2720 Part 16) on representative One test per km length (average of a set
sample compacted at 100 percent Proctor of three specimens).
Note: Where materials from more than one source are to be combined in the desired proportions,
the tests at Sl. Nos. 2, 3 and 5 should be carried out on the combined material. For
new sources, test frequencies shall be at least three tests for each source (average of
three tests). The samples shall be taken at representative locations and at mean depth of
proposed excavation.
1803.3.2 Tests during construction
The field quality control tests during construction shall be as given in Table 1800.7.
Quality Control Section
Table 1800.7 Quality Control Tests during Construction
Type of Test Frequency
1) Wet Sieve Analysis (IS:2720 Part 4) on At least one test to be carried out daily.
the GSB material combined in the design
proportions from various sources.
2) Liquid and Plastic Limit tests (IS:2720 -do-
3) Placement Moisture Content (IS:2720 At least 3 tests to be carried out daily, well
Part 2) spread over the day’s work.
4) Insitu Density measurements (IS:2720 -do-
5) Thickness of compacted layer At random
1803.4 Tests on Lime-Treated Soil Sub-Grade or Sub-Base
1803.4.1 Tests prior to construction
The quality control tests to be carried out prior to construction shall be as given in
Table 1800.8 Quality Control Tests Prior to Construction
Type of Test Frequency
1) Purity of Lime (IS:1514) One test for each lot of lime
2) Determination of optimum quantity of lime Mean of two tests.
to attain the specified reduction in PI and/
or to achieve the specified CBR
3) Plasticity Index test (IS:2720 Part 5) of the Mean of two tests per km length on the
lime-treated soil (mixed with the required representative sample of a lime-treated
amount of lime) soil mix with the required amount of lime.
4) CBR (IS:2720 Part 16) or Unconfined One test on a set of 3 specimens per km
Compressive Strength (IS:4332 Part 5) if length.
1803.4.2 Tests during construction
The quality control tests to be carried out during construction shall be as given in
Section 1800 Quality Control
Table 1800.9 Quality Control Tests during Construction
Type of Test Frequency
1) Pulverization of soil clods At least 3 tests daily, well spread over the day’s
2) Placement Moisture Content -do-
(IS:2720 Part 2)
3) Insitu Density measurements -do-
(IS:2720 Part 28)
i) Average of 3 test results shall not be less than
the specified degree of compaction.
ii) Individual test values of the degree of
compaction attained shall not be less than
1 percent of the specified degree of
4) Thickness of compacted layer At random
1803.5 Tests on Cement Treated Soil Sub-Base/Base
1803.5.1 Tests prior to construction
The quality control tests to be carried out prior to construction shall be as given in
Table 1800.10 Quality Control Tests Prior to Construction
Type of Test Frequency
1) Quality of cement and Purity of Lime One test for each lot
(IS:1514) (if used for pre-treatment)
2) Unconfined Compressive Strength Test One test on a set of 3 specimens per km
(IS:4332 Part 5) length.
1803.5.2 Tests during construction
The quality control tests to be carried out during construction shall be as given in
Quality Control Section
Table 1800.11 Quality Control Tests during Construction
Type of Test Frequency
1) Pulverization of soil clods At least 3 tests daily, well spread over the day’s
2) Placement Moisture Content -do-
(IS:2720 Part 2)
3) Insitu Density measurements -do-
(IS:2720 Part 28)
i) Average of 3 test results shall not be less than
the specified degree of compaction.
ii) Individual test values of the degree of compaction
attained shall not be less than 1 percent of the
specified degree of compaction.
4) Thickness of compacted layer At random
1803.6 Tests on Water Bound Macadam Sub-Base/Base/Surfacing
1803.6.1 Tests prior to construction
The quality control tests to be carried out prior to construction shall be as given in
Table 1800.12 Quality Control Tests Prior to Construction
Type of Test Frequency
1) Aggregate Impact Value Test (IS:2386 Part 4) One test from each identified source.
2) Aggregate Water Absorption Test -do-
(IS:2386 Part 3)
3) Soundness Test of Aggregates (where water -do-
absorption, as at 2 above, exceeds 2%)
(IS:2386 Part 5).
4) Grading, LL and PI of Crushable Screenings -do-
(IS:2720 Part 5) (where Screenings are to
be used from the same source as the Stone
Aggregates, this test is not needed).
5) LL and PI of the Binding Material, when used. -do-
1803.6.2 Tests during construction
The quality control tests to be carried out during construction shall be as given in
Section 1800 Quality Control
Table 1800.13 Quality Control Tests during Construction
Type of Test Frequency
1) Grading of Stone Aggregates and Screenings (IS:2386 At least 2 tests to be carried
Part 1) out for a days work.
2) Flakiness Index of Stone Aggregates (IS:2386 Part 1) - do -
3) PI of Crushable Screenings/binding material (IS:2720 - do -
4) Aggregate Impact Value (IS:2386 Part 4) At random one test per km
5) Thickness of compacted layer At random
1803.7 Tests on Wet Mix Macadam and Crusher Run Macadam Base
1803.7.1 Tests prior to construction
The quality control tests to be carried out prior to construction shall be as given in
Table 1800.14 Quality Control Tests Prior to Construction
Type of Test Frequency
1) Aggregate Impact Value Test One to two tests on representative
(IS:2386 Part 4) sample from each source identified by the
Contractor, depending on variability.
2) Flakiness Index Test (IS:2386 Part 1) -do-
3) Water Absorption Test (IS:2386 Part 3) -do-
4) Soundness Test, if the water absorption -do-
exceeds 2 percent
5) Grading Test (IS:2386 Part 1) -do-
6) Atterberg Limits of portion of -do-
aggregate passing 425 micron sieve
(IS:2720 Part 5)
7) Proctor Compaction Test (IS:2720 Part -do-
7) (after replacing the aggregate fraction
retained on 22.4 mm sieve with material of
4.75 mm to 22.4 mm size) alongwith Dry
Density-Moisture Content Relationship
1803.7.2 Tests during construction
The quality control tests to be carried out during construction shall be as given in
Quality Control Section
Table 1800.15 Quality Control Tests during Construction
Type of Test Frequency
1) Grading Test (IS:2386 Part 1) At least one test per day.
2) Aggregate impact value (IS:2386-Part 4) At random one test per km.
3) Placement Moisture Content (IS:2720 Part 2) At least three tests per day.
4) Density of Compacted Layer (IS:2720 Part 28) -do-
5) Thickness of compacted layer At random
1803.8 Tests on Stone-set Pavement
The tests relating to granular sub-base and WBM base shall be as given in Clauses
and 1803.6 respectively. For stone-sets, the following tests shall be carried out.
1803.8.1 Tests prior to construction
The tests/checks to be carried out prior to construction shall be as given in Table 1800.16.
Table 1800.16 Quality Control Tests/Checks Prior to Construction
Type of Test Frequency
1) Shape and dimension Three samples on receipt at site
2) Water absorption (IS:2386 Part 3) Three samples on receipt at site
1803.8.2 Tests during construction
The tests during construction shall be as given in Table 1800.17.
Table 1800.17 Quality Control Tests during Construction
Type of Test Frequency
1) Aggregate Impact Value (IS:2386 Part 4) At random one test per 500 m length
2) Polished Stone Value (BS: 812 Part 114) At random one test per 500 m length
3) Dressing of stone (hammer dressed on top) At random one test per 200 m length
1803.9 Tests on Prime Coat and Tack Coat
1803.9.1 Tests prior to construction
The quality control tests to be carried out prior to construction shall be as given in
Table 1800.18. These tests shall be carried out on the bitumen binders (Emulsion/Cutback)
brought on the site by the Contractor for use in the work. Where paving bitumen is used for
the tack coat, the tests on bitumen shall be as specified in Table 1800.20.
Section 1800 Quality Control
Table 1800.18 Quality Control Tests Prior to Construction
Type of Test Frequency
1) Viscosity (using Saybolt Furol Viscometer) (IS:8887) One test for each lot
2) Residue on 600 micron sieve (IS:8887) -do-
3) Storage Stability Test (IS:8887) -do-
4) Flash Point Test, where bituminous cutback is to be used -do-
5) Viscosity Test (IS:217), where bituminous cutback is to be -do-
1803.9.2 Tests during construction
The quality control tests to be carried out during construction shall be as given in
Table 1800.19 Quality Control Tests during Construction
Type of Test Frequency
1) Temperature of Binder, when emulsion/cutback Regularly
2) Rate of Spread of Binder At least two tests per day.
3) Curing of Primer/Tack surface Before any subsequent treatment.
1803.10 Tests on Bituminous Macadam
1803.10.1 Tests prior to construction
The quality control tests to be carried out prior to construction shall be as given in
Table 1800.20 Quality Control Tests Prior to Construction
Type of Test Frequency
1) Quality of Binder (Paving Bitumen as per IS:73)
a) Absolute Viscosity and Penetration Test One test per lot
b) R&B Softening Point Test -do-
c) Ductility Test -do-
2) Quality of Binder (Modified Bitumen) (IS:15462
and IRC:SP:53*)
a) Penetration Test -do-
b) R&B Softening Point Test -do-
Quality Control Section
c) Elastic Recovery Test -do-
d) Separation Test -do-
3) Aggregate Impact Value Test (IS:2386 Part 4) One test on representative sample
per km length from each source
identified by the Contractor
4) Flakiness Index Test (IS:2386 Part 1) Two tests per source
5) Bituminous Stripping of Aggregate Test (IS:6241) One test per source
6) Water Absorption (IS:2386 Part 3) -do-
7) Soundness Test, if water absorption of aggregate -do-
exceeds 2 percent (IS:2386 Part 5)
* Refer to para 12 of IRC:SP:53
1803.10.2 Tests during construction
The quality control tests to be carried out during construction shall be as given in
Table 1800.21 Quality Control Tests during Construction
Type of Test Frequency
1) Grading of Aggregate (IS:2386 Part 1) At least one test per day.
2) Binder Content At least two tests per day.
3) Density of Compacted Layer At least one test per day.
4) Temperature of Binder before mixing Regularly
5) *Temperature of mix during laying and compaction Regularly
6) Thickness of compacted layer Regular, at close intervals
7) Aggregate Impact Value (IS:2386 Part 4) At random one test per km
* Temperature measurement will be done by using metallic contact thermometer with digital
1803.11 Tests on Semi Dense Bituminous Concrete
1803.11.1 Tests prior to construction
The quality control tests to be carried out prior to construction shall be as given in
Section 1800 Quality Control
Table 1800.22 Quality Control Tests Prior to Construction
Type of Test Frequency
1) Quality of Binder (Paving Bitumen as per
a) Absolute Viscosity and Penetration Test One test per lot
b) R&B Softening Point Test -do-
c) Ductility Test -do-
2) Quality of Binder (Modified Bitumen) (IS:15462
and IRC:SP:53*)
a) Penetration Test -do-
b) R&B Softening Point Test -do-
c) Elastic Recovery Test -do-
d) Separation Test -do-
3) Aggregate Impact Value Test (IS:2386 Part 4) One test on representative sample per
km length from each source identified
by the Contractor
4) Flakiness Index Test (IS:2386 Part 1) Three tests per source
5) Bitumen Stripping of Aggregate Test (IS:6241) One test per source
6) Water Absorption (IS:2386 Part 3) -do-
7) Soundness Test, (Sodium or Magnesium -do-
sulphate test) (IS:2386 Part 3)
8) Sand equivalent test -do-
* Refer to para 12 of IRC:SP:53
1803.11.2 Tests during construction
The quality control tests to be carried out during construction shall be as given in
Quality Control Section
Table 1800.23 Quality Control Tests During Construction
Type of Test Frequency
1) Mix Grading (IS:2386 Part 1) Individual constituent and mixed
aggregate from dryer. At least
two tests per day.
2) Stability and voids analysis of mix At least two tests per day
3) Binder Content At least two tests per day
4) Temperature of Binder in boiler, and aggregate in At regular intervals.
5) **Temperature of mix during laying and compaction At regular intervals
6) Rate of spread of mix and thickness of compacted Regular, at close intervals
7) Density of compacted layer One test per 700 sqm area
Minimum 3 tests per day
8) Aggregate Impact Value (IS:2386 Part 4) At random one test per km
** Temperature measurement will be done by using metallic contact thermometer with
digital display
1803.11.3 Acceptance criteria
The Acceptance criteria for test on density (N=3 minimum) and Marshall stability
(N=2 minimum) shall be subject to the condition that the mean value of N samples is not
less than the specified value plus [1.65 – 1.65/(No. of samples)0.5] x standard deviation.
Table 500.17 shall govern the permissible variation in the mix and temperature.
1803.12 Tests on Surface Dressing and Mix Seal Surfacing with Seal Coat Type A
1803.12.1 Tests prior to construction
The quality control tests to be carried out prior to construction shall be as given in
Section 1800 Quality Control
Table 1800.24 Quality Control Tests Prior to Construction
Type of Test Frequency
1) Quality of Binder (Paving Bitumen as per
a) Absolute Viscosity and Penetration One Set of tests per lot (Average of three
b) R&B Softening Point Test -do-
c) Ductility Test -do-
2) Quality of Binder (Bitumen Emulsion)
a) Viscosity (IS:8887) -do-
b) Residue on 600 micron sieve (IS:8887) -do-
c) Storage Stability Test (IS:8887) -do--
3) Quality of Binder (Modified Bitumen)
(IS:15462 and IRC:SP:53*)
a) Penetration Test -do-
b) R&B Softening Point Test -do-
c) Elastic Recovery Test -do-
d) Separation Test -do-
4) Aggregate Impact Value Test One test per km length on representative
(IS:2386 Part 4) sample from each source identified by the
5) Flakiness Index Test (IS:2386 Part 1) -do-
6) Bitumen Stripping of Aggregate Test -do-
7) Water Absorption (IS:2386 Part 3) -do-
* Refer to para 12 of IRC:SP:53
1803.12.2 Tests during construction
The quality control tests to be carried out during construction shall be as given in
Quality Control Section
Table 1800.25 Quality Control Tests during Construction
Type of Test Frequency
1) Rate of spread of binder At least two tests per day
2) Rate of Spread of aggregate -do-
3) Grading of Aggregate (IS:2386 Part 1) At least one test per day
4) Temperature of binder during spraying (Annex-I) Regularly, at close intervals.
5) Storage stability Test for Bitumen Emulsion One test per day
6) Aggregate Impact Value (IS:2386 Part 4) At random one test per km
1803.13 Tests on Premix Carpet and Mix Seal Surfacing with Seal Coat Type B
1803.13.1 Tests prior to construction
The quality control tests to be carried out prior to construction shall be as given in
Table 1800.26 Quality Control Tests Prior to Construction
Type of Test Frequency
1) Quality of Binder (Paving Bitumen as per IS:73)
a) Absolute Viscosity and Penetration Test One set of tests per lot
b) R&B Softening Point Test (IS:73) -do-
c) Ductility Test (IS:73) -do-
2) Quality of Binder (Bitumen Emulsion)
a) Viscosity (IS:8887) -do-
b) Residue on 600 micron sieve (IS:8887) -do-
c) Storage Stability Test (IS:8887) -do-
3) Quality of Binder (Modified Bitumen) (IS:15462
and IRC:SP:53*)
a) Penetration Test -do-
b) Softening Point Test -do-
c) Elastic Recovery Test -do-
d) Separation Test -do-
Section 1800 Quality Control
4) Aggregate Impact Value Test (IS:2386 Part 4) One test per km length on
representative sample from each
source identified by the Contractor
5) Flakiness Index Test (IS:2386 Part 1) -do-
6) Bitumen Stripping of Aggregate Test (IS:6241) -do-
7) Water Absorption (IS:2386 Part 3) -do-
* Refer to para 12 of IRC:SP:53
1803.13.2 Tests during construction
The quality control tests to be carried out during construction shall be as given in
Table 1800.27 Quality Control Tests during Construction
Type of Test Frequency
1) Grading of Aggregates (IS:2386 Part 1) At least two tests per day
2) Binder Content before seal coat At least two tests per day
3) Temperature of Binder Regular close intervals
4) Thickness before and after compaction Regularly at close intervals
5) Aggregate Impact Value (IS:2386 Part 4) At random one test per km
1803.14 Tests on Modified Binders
The essential quality control tests and their frequencies shall be as given in Table 1800.28.
Table 1800.28 Essential Tests and their Frequency
Test Test Method Frequency
Quality of Binder Penetration IS:1203 One Test per lot of 10 tonnes for
Softening Point IS:1205
Elastic Recovery IS:15462-2004
Separation IS:15462-2004
1803.15 Tests on Brickwork for Structures
1803.15.1 Tests prior to construction
The tests/checks to be carried out prior to construction shall be as given in Table 1800.29.
Quality Control Section
Table 1800.29 Quality Control Tests Prior to Construction
S. No. Material Test/Check Frequency
1) Bricks a) Colour and Dimensional 3 samples at random at
b) Water absorption 3 samples at source or after
(IS:3495 Part 2) procurement
c) Efflorescence (IS:3495 Part 3) In case of doubt, at source
d) Compressive strength 3 samples at random, at
(IS:3495 Part 1) source
2) Cement a) Setting time of cement (IS:4031 3 samples of same type and
part 5) grade of cement.
3) Lime Purity (IS:1514) One test for each lot
4) Sand (Natural Gradation (IS:2115) 3 samples for each source of
and crushed supply
Deleterious material and organic If in doubt one test
impurities (IS:2386 Part 2)
5) Water Normally potable water is good Samples taken at each source
enough. If impurities are present tested at an approved test
test as per IS:3025 (parts 17, 24, 32) house
1803.15.2 Tests during construction
The tests to be carried out during construction shall be as given in Table 1800.30.
Table 1800.30 Quality Control Tests during Construction
S. No. Material/Work Test/Check Frequency
1) Bond and English bond, verticality by Plumb For each course
2) Laying in Mortar Laying in full bed of mortar with - do -
3) Individual Course Height of course and Joint - do -
thickness (IS:2212)
4) Top of coping Sloping to drain off water Daily
Section 1800 Quality Control
5) Mortar for Joints Mix proportions (Control on Each batch
quantity of cement/lime by weight)
Consistency and water retentivity As required at close
(IS:2250) interval
Compressive Strength (IS:2250) 3 samples of cubes
where specified
6) Arches a) Dimensions of abutment-pier Regularly
(Additional Tests) for multiple arches (IS:2118)
b) Centering for arch For each span
c) Compaction and thickness of Regularly
filling material over crown and
d) Thickness of Joints Regularly
1803.16 Tests on Stone Masonry for Structures
1803.16.1 Tests prior to construction
The tests/checks to be carried out prior to construction shall be as given in Table 1800.31.
Table 1800.31 Quality Control Tests Prior to Construction
S. No. Material Test Frequency
1) Stones a) Shape and Dimension 3 samples on receipt at site
(IS:1597 Part 1)
b) Water absorption (IS:1124) 3 samples on receipt at site
c) Dressing of Stones via Once for each stock after
Hearting, Bond, Quoin, selection for individual work
Face stones, Headers, etc.
2) Cement Setting time of cement 3 samples of same type
(IS:4031 Part 5) and grade of cement
3) Lime (If used) Purity (IS:1514) One test for each lot
4) Sand Gradation (IS:2116) a) 3 samples for each
source of supply
Deleterious materials and organic b) If in doubt, one test
impurities (IS:2386 Part 2)
Quality Control Section
5) Water If impurities are present, test as Samples taken at each
per IS:3025 (Parts 17,24, 32) source, tests at an
approved test house
6) Precast concrete a) Size 3 samples for each size on
bond blocks receipt at site
When natural b) Cube strength of mix used 3 samples
appropriate size
7) Mortar for Joints Consistency and water retentivity As required
Mix proportions for different works Daily
Compressive Strength (IS:2250) 3 samples of cubes where
1803.16.2 Tests/checks during construction
The tests/checks to be carried out prior to construction shall be as given in Table 1800.32.
Table 1800.32 Quality Control Tests during Construction
S. No. Material/Work Test/Check Frequency/Stage
1) Bond and For stability and appearance with While laying each course
Plumbness plumb bob
2) Laying in mortar Horizontality of courses, verticality - do -
and staggering of joints
3) Individual course Height Joint Thickness and laying - do -
(IS:1597 Part 1 & 2 and IS:2212 )
4) Arches a) Centering and simultaneous Check during erection
(Additional commencement of work from
checks) both ends (IS:2118)
b) Compaction and thickness As and when work is on
of filling material over crown hand
c) Erection of abutment pier for As and when such work is
multiple arches on hand
d) Thickness of Joints Check during construction
5) Top of coping Sloping to drain off water Once on either side of
(If provided) parapet
Section 1800 Quality Control
1803.17 Tests/Checks on Concrete for Structures
1803.17.1 Tests prior to construction
The tests and checks to be carried out prior to construction shall be as given in
Table 1800.33 Quality Control Tests Prior to Construction
S. No. Material Test/Check Frequency
1) Cement a) Setting Time (IS:4031 Part 5) One test for 10 tonnes of
cement (same brand &
b) Soundness (IS:4031 Part 3) - do -
c) Compressive strength of 3 specimens for each lot
mortar cube (IS:4031 Part 6)
2) Coarse a) Gradation for PCC or RCC 3 samples for each quarry
Aggregates works source
b) Flakiness index (IS:2386 - do -
c) Deleterious constituents If in doubt, one test
(IS:2386 Part 2)
d) Water absorption/content Once for each source of
(IS:2386 Part 3) supply
e) Aggregate Impact value One test per source of
(IS:2386 Part 4) supply
f) Soundness (IS:2386 Part 5) - do -
[if water absorption exceeds
g) Alkali Silica reactivity (IS:2386 If in doubt, one test at
Part 7) approved test house
3) Fine Aggregates a) Gradation (IS:2386 Part 1) 3 samples for each source of
b) Deleterious Constituents If in doubt, one test
(IS:2386 Part 2)
c) Alkali silicate reactivity If in doubt, one test
(IS:2386 Part 7)
Quality Control Section
4) Water Normally potable water is good
enough for making concrete
Determination of Impurities If the quality is in doubt,
samples taken from each
-S uspended matter IS:3025
source and tested at an
approved test house
- Organic IS:3025 (Part 16)
- Inorganic IS:3025 (Part 19)
ulphates (as SO3) IS:3025
hlorides (as Cl) IS:3025
5) Concrete Mix Design (for each work) To be got approved from
EE for cement content, W/C
ratio and use of plasticizers,
1803.17.2 Tests/checks during construction
The tests required to be carried out during construction shall be as given in Table 1800.34.
Table 1800.34 Quality Control Tests during Construction
S. No. Material/Work Test/Check Frequency
1) Fine and coarse Moisture content (IS:2386 Once before
aggregate Part 3) commencement of work –
2) Cement (consumption) Minimum quantity (Kg/m3) Daily
3) Concrete a) Workability – slump 2 tests/day
cone test (IS:1199)
b) Cube Strength Minimum of 6 cubes (3
(IS:516) each to determine 7 days
and 28 days strength) to
be cast every day)
4) Construction Joints Fixing location before As and when work
concreting and resumption demands
5) Formwork For stability, leakage of Throughout concreting
slurry, bulging etc.
Section 1800 Quality Control
6) Concreting a) Transporting/placing Random check in each
segregation of member
b) Precautions for hot Once check before
weather or cold commencement of work
weather concreting
c) Compaction with Regularly
7) Curing of concrete Regular (till 28 days after Daily
casting) inspection
1803.18 Tests on Formwork for Structures
1803.18.1 Tests prior to construction
The Quality Control tests to be carried out prior to construction shall be as given in
Table 1800.35 Quality Control Tests Prior to Construction
S. No. Test Frequency
1) Thickness of Steel tubes Before usage/Procurement
2) Dia of ‘ballies’ -do-
3) Size of panels (steel sheets/timber planks) -do-
4) Formwork if in reuse To be approved by AE
5) Design of formwork To be approved by EE
1803.18.2 Tests during construction
The quality control tests to be carried out during construction shall be as given in
Table 1800.36 Quality Control Tests during Construction
S. No. Test Frequency
1) Clamps for strength and stability of Formwork Regular
2) Camber and Surface smoothness At the end of erection work
3) Mortar tightness Before concreting
4) Supporting system on ground (To prevent Check before concreting
settlement and distribution of load)
5) Safe access onto and about the formwork Regularly during concreting
6) Height of panels for supporting structures and Check before concreting
Quality Control Section
1803.19 Test on Steel Reinforcement
1803.19.1 Tests prior to construction
The Quality Control tests to be carried out prior to construction shall be as given in
Table 1800.37 Quality Control Tests Prior to Construction
S. No. Test Frequency
1) Grade, percentage elongation and 3 samples from each supplier (certificate from
ultimate tensile strength (For culverts an approved test house)
and small bridges)* (IS:432 Part
2) Pitch of the Ribs and Nominal Random checking
3) Protection of Steel Regularly
4) Substitution of bar sizes Approval by AE/EE before execution of work
5) Detailing of reinforcement cages Approval by AE/EE before execution of work
* For Major Works, frequency of testing may be increased by the Engineer.
1803.19.2 Tests during construction
The Quality Control tests to be carried out during construction shall be as given in
Table 1800.38 Quality Control Tests during Construction
S. No. Test Frequency
1) Bending and placing of reinforcement Daily/Regularly
2) Splicing and welding As and when such work is taken up
3) Tolerances (Spacing and cover) Before concreting
1803.20 Tests on Pipe Culverts
1803.20.1 Tests prior to construction
The quality control tests to be carried out prior to construction shall be as given in
Section 1800 Quality Control
Table 1800.39 Quality Control Tests Prior to Construction
S. No. Material/Work Test/Check Frequency
1) Bricks As in Table 1800.29 As in Table
2) Stones As in Table 1800.31 As in Table
3) Concrete Pipe - Dimensions At factory before delivery
- Manufacturing defects Manufacturer’s certificate
- Tolerances (IS:458)
- Three edge bearing test
1803.20.2 Tests/checks during construction
The Quality control tests/checks to be carried out during construction shall be as given in
Table 1800.40 Quality Control Tests during Construction
S. Material/Work Test/Check Frequency
1) Bedding - Materials (As per specification)
- Length, width and thickness While laying
- Pre formation of cradle to lay
pipes in bedding
- Top and bottom levels
2) Laying and Jointing - Invert level Before back filling
- Longitudinal gradient
- Spacing when 2 or more pipes
are laid in a row or staggered
- Jointing of pipes
3) Backfill - Filling of trench on both sides During filling earth/
(simultaneously) granular material
Around pipe after
- Tamping around pipe laying
4) Cushion over pipes Thickness While filling
5) Brick/Stone Masonry As per Specifications As per specifications
6) Side slopes on Head - Slope Before construction of
walls guard stones
- Stone pitching
Quality Control Section
1803.21 Tests on RCC Slab Culverts and Minor Bridges
1803.21.1 Tests prior to construction
a) The quality control tests and checks to be carried out prior to construction
shall be as given in Table 1800.41.
Table 1800.41 Quality Control Tests Prior to Construction
S. No. Material/Work Test Frequency
1) Cement, Fine/Coarse Tests as in Table 1800.33 As in Table
Aggregates and water and
Concrete for Structures
2) Steel Reinforcement Tests as in Table 1800.37 As in Table
(For culverts and small
3) Plant and equipment and a) Working condition of Check by AE before
other arrangements for concrete mixers including commencement of
concrete production standby arrangement concreting
b) Measuring boxes/scales
for cement, fine and coarse
c) Standard measuring cans
(1/2, 1, 2, 5 litre capacity)
d) Needle, plate and screed
e) Arrangements for
protection of concrete
in hot, cold and rainy
f) Tools and equipment for
finishing and curing.
b) Other checks to be done on ‘Manufactured items’ prior to construction
shall be as given in Table 1800.42.
Section 1800 Quality Control
Table 1800.42 Quality Control Tests Prior to Construction
S. No. Material/Product Test/Check Frequency
1) Elastomeric bearings Approved Test house report To be approved
(IRC-83 part II) obtained by Manufacturer. by AE/EE before
For Spans > 10 m procurement
2) Expansion Joints (IRC:SP:70) Performance report (To be -do-
furnished by manufacturer)
3) Shear connectors (For Dia, length and yield strength -do-
composite bridges)
4) Plasticizer (If used to improve As per Manufacturer’s test -do-
workability of concrete) reports.
1803.21.2 Tests/checks during construction
The Tests/Checks to be carried out during construction shall be as given in Table 1800.43.
Table 1800.43 Quality Control Tests during Construction
S.No. Material/Work Test/Check Frequency/Stage
1) Concrete for For constituents As in Table
Structures As in Table
- For Foundation Dewatering, before laying of For each foundation work
foundation concrete
- For Substructure Form panel size and jointing to For each work
prevent bleeding
3) Cube Strength Analysis of Test results During construction of
Results substructures/super-
structures separately
4) Form work Tests as in Table 1800.36 As in Table
5) Reinforcement a) Dia and spacing of Before commencement of
cage Reinforcements in cage as concreting
b) Size and placement of - do -
briquettes for supporting the
reinforcements i.e. to provide
bottom and side covers
c) Cleaning rust on Before placement and
reinforcements with wire compaction of concrete
d) Other checks as per Table
Quality Control Section
6) All concrete works a) Temperature Control & Regularly
Control of W/C ratio (As per
time & season of work) of mix
b) Workability (IS:1199) Twice in a day.
c) Compaction Ensure compaction by
needle vibrator
d) Curing To commence 24 hrs after
7) Expansion Joint Installation as per Manufacturer’s At each Joint location
assemblies specification
8) Sealants To be installed as per After hardening of
Manufacturer’s specification. concrete
9) Kerbs, Drain pipes - Separate form work As and when work is taken
Railings/Parapets up
10) Elastomeric Correct positioning on pedestals Before concreting
1803.22 Tests on Stones and Apron for Protection Works
1803.22.1 Tests prior to construction
The Quality Control tests and checks to be carried out prior to construction shall be as given
in Table 1800.44.
Table 1800.44 Quality Control Test Prior to Construction
S. No. Test/Check Frequency
1) Size and weight of stones in apron/slope/flooring At quarry site before
etc. procurement
2) Wire crates (Size and mesh size) Before procurement
3) Cement concrete blocks (Weight and Size) Before procurement
4) Gradation of Filter media Before procurement
1803.22.2 Tests during construction
The quality control tests and checks to be carried out during construction shall be as given
in Table 1800.45.
Section 1800 Quality Control
Table 1800.45 Quality Control Tests during Construction
S. No. Test/Check Frequency
1) Laying of Filter granular material Daily check for workmanship
2) Laying boulders for Daily check for uniformity in
- Apron workmanship
- Pitching on Slopes
- Toe protection
3) Mortar for Joints
a) Mix proportions, (control on quality of cement/ Each batch
b) Consistency and water retentivity (IS:2250) As required
c) Compressive strength (IS:2250) 3 samples of cubes where
4) Laying of brick stones in flooring Daily check for workmanship
5) Curtain wall Daily check for workmanship
6) Drain (Chute, Road side, Hill side and Catch water) Daily check for workmanship
1803.23 Tests on Cement Concrete Causeways and Submersible Bridges
The quality control tests/checks listed here cover causeways and submersible bridges where
in materials such as brick or stone masonry, plain or reinforced concrete are used. The
openings in causeways could be of concrete pipes or rectangular/arch semicircular vents in
1803.23.1 Tests prior to construction
The quality control tests and checks to be carried out prior to construction shall be as given
in Table 1800.46.
Table 1800.46 Quality Control Tests Prior to Construction
S. No. Material Test/Check Frequency
1) Bricks As in Table 1800.29 Table
2) Stones As in Table 1800.31 Table
3) Concrete Materials As in Table 1800.33 Table
4) Stainless Steel bars (For Rust, acid and heat resistance Before
submersible bridges) (IS:6603) procurement
5) Steel reinforcement As in Table 1800.37 Table
6) Cement pipes (If used) As in Table 1800.39 Table
Quality Control Section
7) Plant equipment for As in Table 1800.41 Table
production of concrete
8) Pavement Materials Sub-base (Table 1800.6) Table
WBM (Table 1800.12) Table
Cement concrete (Table 1800.33) Table
1803.23.2 Tests during construction
The Quality Control Tests/checks to be carried out during construction shall be as given in
Table 1800.47 Quality Control Tests during Construction
S. No. Material/Work Test/Check Frequency
1) All concrete works a) Workability (IS:1199) As per Table
b) Cube strength (IS:516)
2) Concrete for foundation a) Dewatering As per Table
substructure, super- b) Form panels,
structure (For submersible
bridges) c) Jointing,
d) Cover to reinforcements
3) Form Work Design, Erection, Camber, As per Table
4) Reinforcement cage Dia, spacing, cover as per - do -
5) Kerbs, drain pipes railings As indicated in drawings - do -
6) Bearings & Expansion Manufacturer’s Specification - do -
7) Jointing of pipes & As per Table 1800.40 During construction
8) Cement Concrete As per Table 1800.49 (Items Table 1800.49 (Items
Pavement (Additional 5,6,7 & 8) 5,6,7 & 8)
9) Equipment for handling - Adequacy of chain pulley Check by AE
pipes (prior to lowering) block
tability of Tripod
arrangement etc.
Section 1800 Quality Control
1803.24 Tests on Plain Concrete Pavement
1803.24.1 Tests prior to construction
The quality control tests and checks to be carried out during construction shall be as given
in Table 1800.48.
Table 1800.48 Quality Control Tests Prior to Construction
S. No. Type of Test Frequency
1) Cement As in Table
2) Fine Aggregates As in Table
3) Coarse Aggregates As in Table
4) Water Once for each source, subsequently in
5) Admixture Manufacturer’s certificate before
- Chemical (For workability)
- Mineral (Flyash) (IS:3812)
6) Dowel bars (Plain steel) Tests on 3 samples to determine yield
IS:432 (Part I)
7) - Premoulded Joint Filler (IS:1838) or Manufacturer’s Certificate
- Joint Sealing Compound (IS:1834)
8) Plants equipment and tools As per contract
9) Concrete mix design for cement content, To be approved by EE
w/c ratio and dosage of plasticizers for
the specified design strength.
10) Granular Sub-base Table
11) Trial length To be approved by EE before regular
1803.24.2 Tests during construction
The tests and checks to be carried out during construction shall be as given in
Quality Control Section
Table 1800.49 Quality Control Tests during Construction
S. No. Tests/Check Frequency
1) Subgrade and Subbase As in Tables 1800.5 and
2) Gradation and moisture content of Minimum once per day.
aggregate for CC pavement
3) Concrete workability (Slump cone One test per 3 cum of concrete at paving site
tests IS:1199) or one test for each dumper laid at plant site.
4) Strength of Concrete (IS:516) Minimum 6 cubes and 6 beams (3 each for
day & 28 day strength) per day.
5) Straightness of side forms (steel) To be checked daily
(For paralleling and possible
settlement and securing position
before concreting)
6) Size, spacing, paralleling of Dowel To be checked prior to casting of concrete at
bars and location of different joints the location.
7) Batching and Mixing of materials Check for measurements and proper mixing
8) Hot/Cold weather concreting Checks Regularly
including compaction
9) Compaction equipment (Needle, For continuous working and standby
Screed and Plate vibrators) arrangement
10) Separation membrane (thickness Prior to laying of pavement concrete
11) Levels and Alignment
i) Level tolerance To be checked for each day’s work Regularly
ii) Surface Regularity (Transverse
and Longitudinal including
camber/cross slope)
iii) Width of pavement and position To be checked for each day’s work Regularly
of paving edges at grid points
iv) Pavement thickness To be checked for each day’s work
v) Alignment of joints -do-
vi) Depth of Dowel Bars -do-
vii) Texturing and Edging -do-
Section 1800 Quality Control
1803.25 Tests on Roller Compacted Concrete Pavement
1803.25.1 Tests prior to construction
The Quality Control tests and checks to be carried out prior to construction shall be as given
in Table 1800.50.
Table 1800.50 Quality Control Tests Prior to Construction
S. No. Tests Frequency
1) Materials for concrete As in Table
2) Concrete Mix design Approval by EE for cement content w/c
(With and without flyash) ratio and use of plasticizers
3) Plants, Equipment and tools As per contract
4) Trial length before commencement of Approval by EE
5) Granular Sub base As in Table
6) Design Parameters (Grade of concrete, As per construction drawings.
width, thickness and details of joints)
1803.25.2 Tests during construction
The quality control tests and checks to be carried out during construction shall be as given
in Table 1800.51.
Table 1800.51 Quality Control Tests during Construction
S. No. Tests/Check Frequency
1) Gradation and moisture content of As in Table
2) Batching and mixing of materials Check for measurements and proper mixing
3) Workability, zero slump and insitu One test for 3 cum of concrete
density of RCCP
4) Insitu density of trial length by sand Three tests for each 2000 sqm or part
replacement method (IS:2720) thereof.
5) Subgrade and Subbase As in Tables 1800.5 and
6) Strength of Concrete (IS:516) As in Table
7) Side forms As in Table
8) Transverse Contraction Joints (width 18-24 hours after laying
Quality Control Section
1803.26 Tests on Rectangular Concrete Block Pavement
1803.26.1 Tests prior to construction
The quality control tests and checks to be carried out prior to construction shall be as given
in Table 1800.52.
Table 1800.52 Quality Control Tests Prior to Construction
S. No. Tests/Check Frequency
1) Materials for concrete As in Table
2) Concrete Mix Design For approval by EE
3) Grading for bedding and Joint filling sand For approval by EE
4) Size and Compressive Strength of Paving blocks As per drawings
5) Subgrade and Subbase As in Tables 1800.4 and
6) Trial length before commencement of regular Approval by EE
7) Design parameters (Joints Details, Pattern of As per drawing
laying and End restraints)
8) Manufacturing machine or Semi mechanized As per contract
method for blocks and Vibrating plate compactor
1803.26.2 Tests during construction
The Quality Control Tests and checks to be carried out during construction shall be as given
in Table 1800.53.
Table 1800.53 Quality Control Tests during Construction
S. No. Tests/Check Frequency
1) Sub-grade and Sub-base As in Tables 1800.5 and
2) Compressive Strength of concrete (IS:516) As in Table
3) Pattern of laying of blocks and End restraints At random
(As per drawings)
4) Earthen shoulders (Width and camber) At random
5) Width of Joints between blocks At random
6) Tolerances (Level tolerance & Surface At random
Section 1800 Quality Control
1803.27 Tests on Interlocking Concrete Block Pavement
1803.27.1 Test prior to construction
The Quality Control Tests and checks to be carried out prior to construction shall be as given
in Table 1800.54.
Table 1800.54 Quality Control Tests Prior to Construction
S. No. Tests/Check Frequency
1) Concrete materials As in Table
2) Grading for bedding and Joint filling For approval by EE
3) Mix Design for concrete For approval by EE
4) Base Course As in Tables 1800.4 and
5) Trial length of 30 m before commencement For Approval by EE
6) Block size and thickness 5 samples selected at random for every
1000 specimens. For approval by AE
7) Water absorption and compressive 5 blocks selected at random for every
strength of blocks 500 blocks. For approval by AE
1803.27.2 Tests during construction
Quality control tests and checks to be carried out during construction shall be as given in
Table 1800.55 Quality Control Tests during Construction
S. No. Tests/Check Frequency
1) Sub-grade and sub-base As in Tables 1800.5 and
2) Dimensions and Tolerances of paving blocks As specified. At random
3) Paving pattern Approval by EE before
commencement of work
4) Paving and compaction of blocks Regularly
5) Surface Regularity Random check
a) Tolerances for lines, levels and grades
b) Longitudinal and Transverse profile
6) Compressive Strength of concrete of blocks As specified
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
DETAILED TECHNICAL SPECIFICATION.pdf
General Specification.pdf
Testing schedule bridge work as per MoRD specification.pdf
Special condition of contract.pdf
SCHEDULE B.pdf
SBD for MINOR STRUCTURE AT VIJAYNAGER_2026_03_11.pdf
MORD Specifications.pdf
is.12594.1988_Hot dip Zinc coating code.pdf
INDEX FOR TECHNICAL SPACIFICATION.pdf
GRs.pdf
GOI GRs.pdf
DRAWING_TSN_1037.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .