Loading…
Loading…
Tender Value
₹53.4 L
EMD Value
₹1.1 L
Closing Date
13 Aug 2026, 11:00 am
Solanki Das
RHQ Bangalore
Engagement of 3rd party for implementation of SFQP Koppal Gadag-II 2nd DC line
SR2/T/S-CONS/DOM/C00/26/09081
Open
Consultancy Services
Works
Koppal Gadag-II
₹2,500
₹1.1 L
14 Jul 2026
14 Jul 2026
17 Aug 2026
14 Jul 2026
13 Aug 2026
14 Jul 2026
21 Jul 2026
ATTACHMENTS General guidelines for filling up the Attachments
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081
1 Fill up only green shaded cells in the relevent attachments.
2 Attachments 3(QR), 6, 9, 11, 12, 13, 15, 17, 18, 19, and Bid Form for 1st Envelope are included here.
3 Attachment 1 Bid Security : To be submitted as per proforma provided in the Bidding Document.
4 Attachment 2 Power of Attorney : No specific format is provided by POWERGRID. Bidder may use their own format.
5 Attachment 8 Manufacturer’s Authorisation Form : To be furnished as per proforma provided in the bidding document, on the letter head of the each Manufactures proposed to supply main items. This attachment is not included here.
6 Attachment 10 Guarantee Declaration: We hereby declare that Attachment-10 (Guarantee Declaration) is provided in our Second Envelope Bid.
6 Attachment 14 Integrity Pact : To be submitted as per ITB Clause No. 9.3(o) and as per remarks in the Attach 14-IP.
7 Attachment 20, Attachment 21, Attachment 22, Attachment 23 : To be submitted as per the provisions of the Bidding Documents (Formats Attached seperately in Volume-III of Bidding Documents.
8 Attachment 24: Unequivocal consent of the proposed Sub-Contractor(s) : No specific format is provided by POWERGRID. Bidder may use their own format.
9 Attachment 25: Declaration by the Bidder regarding events encountered pursuant to ITB Clause 2.1 (All partners of the Joint Venture in case of Joint Venture bids)
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081
Enter the details of the bidder below: Sole Bidder
Specify type of Bidder [Select from drop down menu] Sole Bidder 1
{as per sl. no. 1.1 OR 1.3 OR 3.0 (as applicable) of Annexure-A (BDS) of Vol-I (Conditions of Contract)}
Route 2: Manufacturer of OPGW Route 1: Installation Agency
Whether the bidder is an MSE (Micro & Small Enterprise) Route 2: Manufacturer of OPGW
Name of the Bidder 1
Address of the Bidder 2 or more
Pick date from here (mm/dd/yyyy):
NOTE: (In case of JV, all partners of the Joint Venture shall be MSEs to consider its bid as bid from MSE, JV bidder with at least one non-MSE partner (whether lead or other partner) shall not be eligible for the benefit available to the MSE bidders)
Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081 ATTACHMENT-3 (JV) #REF! #REF!
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
(Joint Venture Agreement and Power of Attorney for Joint Venture*)
Bidder’s Name and Address : To:
0 Sr.GM, C&M Department 1 #REF!
Name : 0 Power Grid Corporation of India Ltd., 1
Address : 0 SRTS-II,RHQ,Bangalore-560064
This Attachment is Not Applicable
The joint venture agreement (as per the proforma attached at no.15 in Section-VI Sample forms and procedures), conditions of contract, Vol-I of the bidding documents) and Power of attorney for joint venture(as per proforma attached in 14 in Section-VI, Sample forms and procedures, conditions of contract, Vol-I of the bidding documents) are enclosed herewith.
Note- Both the above mentioned documents are applicabe for Joint venture bids and needs to be submitted along with the bid.
Date : 00-Jan-00 Printed Name : 0 #REF!
Place : 0 Designation : 0 #REF!
Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081 ATTACHMENT-3 (QR)
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
(Qualifying Requirement Data)
Bidder’s Name and Address : To:
0 Sr.GM, C&M Department
Name: 0 Power Grid Corporation of India Ltd.,
Address: 0 SRTS-II,RHQ,Bangalore-560064
For Our Qualifying Requirements, Please refer QR attached in Vol-I (Annexue- Ato BDS)
We have submitted bid as individual firm.
We have submitted bid as joint venture of following firms :
[For details regarding Qualification Requirements of a Joint Venture, please refer para 4.0 below.]
We are furnishing the following details/document in support of Qualifying requirement for the subject package.
A Attached copies of original documents defining :
a) The constitution or legal status;
b) The principal place of business;
c) The place of incorporation (for bidders who are corporations); or the place of registration and the nationality of the Owners (for applicants who are partnerships or individually-owned firms).
B Attached original & copies of the following documents :
a) Written power of attorney of the signatory of the Bid to commit the bidder.
b) Joint Venture Agreement.
C Whether bidder anticipate any change in legal structure/ ownership of their organisation at present. If Yes, please enclose details of same and copy of procedural document(s) with reference to the same/ as required statutorily, as of now
1.0 GENERAL INFORMATION
Bidder is required to provide general information as per the following format.
[Where the Bidder proposes to use named subcontractor(s) for critical components of the works or for work contents in excess of ten (10) percent of the bid price, the following information should also be supplied for the subcontractor(s)].
S No. Particulars Sole Bidder
1 Name of the Firm 0 0 0
2 Head Office/ Registered Office Address 0 0 0
5 Contact Person
6 Place of Incorporation/ Registration
7 Year of Incorporation/ Registration
8 Nationality of
2.0 TECHNICAL REQUIREMENTS {Reference para 1.0 of Annexure-A (BDS)}
2.1 TECHNICAL EXPERIENCE
In case of foreign entity, whether bidder have established/ commence the establishment of facility as Indian Subsidiary/ Group Company/ Joint Venture Company for manufacturing & testing of 400kV or above voltage level GIS in India (as per Companies Act 1956 or 2013 of India)
Whether bidder want to propose its above subsidiary/ Group Company/ Joint Venture Company as its associate for executing On-Shore Supply Contract
Whether Undertaking (as per enclosed format in Section-VI, Sample Forms and Procedures of bidding document) for above is enclosed with the bid
4.0 Financial Qualification Data: 1
Name of the Bidder 0
Networth Details of documentary evidence submitted in support of Qualification Data
Currency Networth (in Millions)
Sl No Financial year
Do you have audited results for FY 2018-19 No
B Turnover details:
Turnover Details of documentary evidence submitted in support of Qualification Data
Currency Turnover (in Millions)
Sl No Financial year
Do you have audited results for FY 2018-2019
Average Annual Turnover for best Three Years is
C Liquid Assets
Currency (INR) LA
Details of evidence of having Liquid assets (LA)
Details of evidence of access to or availability of credit facilities
Networth (INR) Details of documentary evidence submitted in support of Qualification Data
Currency Networth (in Millions)
Sl No Financial year
Do you have audited results for FY 2018-2019 Yes
*(Indicate the rate(s) of exchnage against US Dollar at the end of each year, which have been used for arriving the amount at equivalent US Dollar.)
B Turnover details:
Turnover Details of documentary evidence submitted in support of Qualification Data
Currency Turnover (in Millions)
Sl No Financial year
Do you have audited results for FY 2018-19 Yes
*(Indicate the rate(s) of exchnage against US Dollar at the end of each year, which have been used for arriving the amount at equivalent US Dollar.)
C Liquid Assets
Currency LA Equivalent US$ (in Million)
Details of evidence of having Liquid assets (LA)
Details of evidence of access to or availability of credit facilities
Networth Equivalent US$ (in Million) exchange rate* Details of documentary evidence submitted in support of Qualification Data
Currency Networth (in Millions)
Sl No Financial year
Do you have audited results for FY 2012-13 Yes
*(Indicate the rate(s) of exchnage against US Dollar at the end of each year, which have been used for arriving the amount at equivalent US Dollar.)
B Turnover details:
Turnover Equivalent US$ (in Million) exchange rate* Details of documentary evidence submitted in support of Qualification Data
Currency Turnover (in Millions)
Sl No Financial year
Do you have audited results for FY 2012-13 Yes
Average Annual Turnover for best Three Years is
*(Indicate the rate(s) of exchnage against US Dollar at the end of each year, which have been used for arriving the amount at equivalent US Dollar.)
C Liquid Assets
Currency LA Equivalent US$ (in Million)
Details of evidence of having Liquid assets (LA)
Details of evidence of access to or availability of credit facilities
4.0 Joint Venture (JV) Firms {Reference para 3.0 of Annexure-A (BDS)}
3.0 a) IIn case a bid is submitted by a Joint Venture (JV) of two or more firms as partners, all the partners of Joint Venture shall meet collectively the complete requirements stipulated at para 1.0 and 2.0 (b) & (c) above. Further, the partner(s) of JV must also meet the following minimum criteria: i. All the partners of the JV shall meet individually the Financial Position criteria given at 2.0 (a) above. ii. The Lead Partner shall meet, not less than 40% of the minimum Financial Position criteria given at para 2.0 (b) & (c) iii. Each of the other partner(s) individually shall meet not less than 25% of the minimum Financial Position criteria given at para 2.0 (b) & (c) above The figure of average annual turnover and liquid assets/credit facilities for each of the partners of the JV shall be added together to determine the JV’s compliance with the minimum qualifying criteria set out in Para 2.0 (b) & (c) above. b) However, for a JV to be qualified, the partners of JV must also meet the following minimum criteria: i. One of the partner(s) of JV must meet the Technical Experience criteria and the requirements stipulated under Route-1 or Route-2 or Route-3 as per para 1.0 above ii. The remaining partner(s) must have erected, tested and commissioned at least two (2) nos. GIS/AIS Circuit Breaker equipped bays@ of 345kVor above voltage level in one (1) substation or switchyard during the last seven (7) years in India and these bays@ must be in satisfactory operation# as on the originally scheduled date of bid opening mentioned above. Note :- (#) Satisfactory operation means certificate issued by the Employer certifying the operation without any adverse remark.
The bidder shall furnish documentary evidence in support of the qualifying requirement stipulated as above.
4.1 In accordance with the above, in case of JV bidders, it should be ensured that necessary details including those pertaining to each JV partner are furnished and the documents are submitted alongwith the bid. Further, the JV bidders should also ensure that other requirements are complied with. The lists of documents furnished are to be indicated below :
5.0 The Bidder shall also furnish following documents/details with its bid. {Reference ITB clause 9.3 (c)}
In the event the bidder is not able to furnish the information of its own (i.e separate), being a subsidiary company and its accounts are being consolidated with its group/holding/parent company, the bidder should submit the audited balance sheets, income statements, other information pertaining to it only (not of its group/Holding/Parent Company) duly certified by any one of the authority [ (i) Statutory Auditor of the bidder /(ii) Company Secretary of the bidder or (iii) A certified Public Accountant] certifying that such information/documents are based on the audited accounts as the case may be.
5.2 The Bidder should accordingly also provide the following information/documents (In case of JV bidders, information should be provided separately for all the Partners of JV in the given format):
Audited balance sheet and income statements for the last five years as per the following:
For 0 For 0 For 0
A Audited Balance Sheet and Income Statements enclosed
Date : 00-Jan-00 Printed Name : 0
Place : 00-Jan-00 Designation : 0
Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081 ATTACHMENT-4
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
(Form of Certificate of Origin and Eligibility)
Bidder’s Name and Address : To:
0 Sr.GM, C&M Department
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 SRTS-II,RHQ,Bangalore-560064
We hereby certify that equipment and materials to be supplied are produced in [Enter the name of country where from equipments & material shall be supplied] eligible source country. Equipments & Materials produced in [Name of countries] Company incorporated & registered in [Name of countries]
We hereby certify that our company is incorporated and registered in [Enter the name of country where from equipments & material shall be supplied] eligible source country.
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
country. country. [Enter the name of country where from equipments & material shall be supplied] [Enter the name of country where from equipments & material shall be supplied]
Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081 ATTACHMENT-4 (A)
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
(List of Special Maintenance Tools & Tackles)
Bidder’s Name and Address : To:
0 Sr.GM, C&M Department
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 SRTS-II,RHQ,Bangalore-560064
We are furnishing below the list of special maintenance tools & tackles for various equipment under the subject package. The prices for these tools & tackles are included in our lumpsum bid price. We further confirm that the list of special maintenance tools & tackles includes all the items specifically identified in your bidding documents as brought out below:
S.No. For Equipment Item Description Unit Quantity
Notwithstanding what is stated above, we further confirm that any additional special maintenance tools and tackles, required for the equipment under this package shall be furnished by us at no extra cost to the employer.
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081 ATTACHMENT-4 (A)
(List of Special Maintenance Tools & Tackles)
S.No. For Equipment Item Description Unit Quantity
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081 ATTACHMENT-5
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
(Bought-out & Sub-contracted Items)
Bidder’s Name and Address : To:
0 Sr.GM, C&M Department
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 SRTS-II,RHQ,Bangalore-560064
We hereby furnish the details of the all major items of supply or services i.e. items, whose price is more than 10% of the Bid Price, we propose to buy for the purpose of furnishing and installation of the subject :
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Details of the proposed sub-contractor/sub-vendor
Name Nationality
We hereby furnish the details of the items/ sub-assemblies propose to supply from our own works (i.e. as direct transactions) in additiona to the supplies the same from other vendors (i.e. as Bought-out transactions) as detailed in the table given above.
Sl. No. Item Description Quantity proposed to be supplied Details of the plant from where supplies are proposed.
Name of Plant Address
2. We hereby declare that, we would not subcontract the erection portion of the contract without the prior approval of Employer.
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081 ATTACHMENT-5
(Bought-out & Sub-contracted Items)
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Details of the proposed sub-contractor/sub-vendor
Name Nationality
Date : 00-Jan-00 Printed Name : 0
Place : 00-Jan-00 Designation : 0
Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081 ATTACHMENT-5A
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
(Items, Components, Raw Material, Services proposed to be sourced from Micro and Small Enterprises)
Bidder’s Name and Address : To:
0 Sr.GM, C&M Department
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 SRTS-II,RHQ,Bangalore-560064
1. We hereby furnish the details of the items, components, raw material, services which we propose to buy/avail from Micro and Small Enterprises (MSEs) for the purpose of completion of works under the package. i.e.,Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL) Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Name of Micro and Small Enterprises (MSEs)
Name Category (Micro or Small)
We hereby furnish the details of the items/ sub-assemblies propose to supply from our own works (i.e. as direct transactions) in additiona to the supplies the same from other vendors (i.e. as Bought-out transactions) as detailed in the table given above.
Sl. No. Item Description Quantity proposed to be supplied Details of the plant from where supplies are proposed.
Name of Plant Address
2. The above is a list of items we propose to procure from MSEs. However, based on the situations during the execution of the contract, the above list may undergo changes. We hereby confirm that the details regarding actual procurement from MSEs carried out by us, as per the format provided at Section VI, Sample Forms and Procedures (FORMS), Volume-I of bidding documents, shall be submitted along with the bills for payment against supplies made/works done during execution of contract.
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081 ATTACHMENT-5A
(Items, Components, Raw Material, Services proposed to be sourced from Micro and Small Enterprises)
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Name of Micro and Small Enterprises (MSEs)
Name Category (Micro or Small)
Date : 00-Jan-00 Printed Name : 0
Place : 00-Jan-00 Designation : 0
Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081 ATTACHMENT-6
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
(Alternative, Deviations and Exceptions to the Provisions)
Bidder’s Name and Address : To:
0 Sr.GM, C&M Department
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 SRTS-II,RHQ,Bangalore-560064
The bidder shall itemize any deviation from the Specifications included in his bid. Each item shall be listed (separate sheets may be used and enclosed with this Attachment) with the following information:
Sl. No. Reference clause in the Specifications Deviation Reason for change The change in Bid Prices if the deviation is withdrawn and the Bidder conforms to the Specifications
Any proposed deviation will be applicable only for the bidder whose bid is substantially responsive in accordance with Clause 22, Section ITB, Vol. I of the bidding documents. If a bid is not substantially responsive, it will be rejected and may not subsequently be made responsive by the bidder by correction of the non-conformity.
The above deviations and variations are exhaustive. We confirm that we shall withdraw the deviations proposed by us at the cost of withdrawal indicated in this attachment, failing which our bid may be rejected and Bid Security forfeited.
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081 ATTACHMENT-6
(Alternative, Deviations and Exceptions to the Provisions)
Sl. No. Reference clause in the Specifications Deviation Cost of withdrawal of the deviation
Date : 00-Jan-00 Printed Name : 0
Place : 00-Jan-00 Designation : 0
Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081 Attachment-7
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
(Details of Alternative Bid)
Bidder’s Name and Address (Lead Partner) : To:
0 Contract Services
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 "Saudamini", Plot No. 2, Sector 29
0 Gurgaon (Haryana) - 122001
No Alternative Bid
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081 ATTACHMENT-7
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
(Work Completion Schedule)
Bidder’s Name and Address : To
0 Sr.GM, C&M Department
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 SRTS-II,RHQ,Bangalore-560064
No Alternative Bid
Date : 00-Jan-00 Printed Name: 0
Place : 0 Designation: 0
Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081 ATTACHMENT-9
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
(Work Completion Schedule)
Bidder’s Name and Address : To:
0 Sr.GM, C&M Department
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 SRTS-II,RHQ,Bangalore-560064
We hereby declare that the following Work Completion Schedule shall be followed by us in furnishing and installation of the subject package i.e., Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL) for the period commencing from the effective date of Contract to us :
Sl. No. Description of Work Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
1 Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL) We hereby declare that the completion Schedule shall be followed by us in line with the bid documents
2 Procurement of equipment/ components & assembly a) commencement
3 Type Tests a) commencement
4 Manufacturing a) commencement
5 Shipments & Delivery a) commencement
6 Establishment of site office
7 Installation at Site a) commencement
8 Testing & Pre-commissioning a) commencement
9 Trial Operation a) commencement
b) completion 18
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation: 0
Note: Bidders to enclose a detailed network covering all the activities to be undertaken for completion of the project indicating key dates for various milestones for each phase constituent-wise
Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081 ATTACHMENT-10
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
(Guarantee Declaration)
Bidder’s Name and Address : To:
0 Sr.GM, C&M Department
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 SRTS-II,RHQ,Bangalore-560064
We confirm that the equipments offered shall have minimum (or a maximum, as the case may be) performance specified in Technical Specifications. We further guarantee the performance/ efficency of the equipments in response to the Technical Specifications
We declare that the ratings, performance figures and availability of the system furnished by us for subject Package covered under this specification are guaranteed by us. In particular, we declare that the 1) 10MVA, (220/V3)/(132/V3) kV, 1-phase Autotransformer; 2) 160MVA, 220/132/33 KV, 3-phase Autotransformer as per scope of package) offered under this package shall meet the maximum loss requirement as stipulated in Technical Specifications
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081 ATTACHMENT-11
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
(Information regarding Ex-employees of POWERGRID in our Organisation)
Bidder’s Name and Address : To:
0 Sr.GM, C&M Department
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 SRTS-II,RHQ,Bangalore-560064
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
*In case the date of joining in the bidder’s organization of such ex-employee is within 1 year from the date of retirement/resignation from POWERGRID, No Objection Certificate/ approval from the Competent Authority must be furnished along with the bid or subsequent through clarification pursuant to ITB Clause 21.
In case of non-submission of No Objection Certificate/approval of the Competent Authority, as required, We understand that POWERGRID shall deal with such cases as per its Policy and procedures in vogue, which may also result in rejection of our bid. We also confirm that POWERGRID shall be the sole judge in this regard. We further declare that any misrepresentation or submission of false/forged documents/information in this regard shall be dealt with as per the provisions of the Integrity Pact and/or the Bidding Documents and/or POWERGRID’s policy and procedures.
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
Note: The information in similar format should be furnished for each partner of joint venture in case of joint venture bid.
Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081 ATTACHMENT-11
(Information regarding Ex-employees of POWERGRID in our Organisation)
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081 ATTACHMENT-11
(Information regarding Ex-employees of POWERGRID in our Organisation)
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : 00-Jan-00 Printed Name : 0
Place : 00-Jan-00 Designation : 0
Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081 ATTACHMENT-12
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
(Price Adjustment Data)
Bidder’s Name and Address (Sole Bidder) : To:
0 Sr.GM, C&M Department
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 SRTS-II,RHQ,Bangalore-560064
Firm Price Basis
Sl. No. Name of Materials/Labour Value of co-efficient Name of the published index Value of index as 30 days prior to date set for opening of bids
In accordance with Clause 2, Appendix-2, Form of Contract Agreement, Section-VI; Forms. Volume-I
A) For Equipment Ex-Works Price Component
I. Circuit Breaker
a) Raw Material
b) Labour I= Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2001= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
The sum of the value of coefficients for raw materials: a+b+c+d=0.55 to 0.65 and sum of all the coefficients including labour shall be a+b+c+d+l=0.85.
II Current Transformer
a) Raw Material
b) Labour I= Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2001= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
The sum of the value of coefficients for raw materials: a+b+c+d=0.55 to 0.65 and sum of all the coefficients including labour shall be a+b+c+d+l=0.85.
a) Raw Material
b) Labour I= Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2001= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
The sum of the value of coefficients for raw materials: a+b+c+d=0.65 to 0.73 and sum of all the coefficients including labour shall be a+b+c+d+l=0.85.
II Insulating Oil
S.N. Name of Materials/Labour Value of Coefficient Name of the published index Value of index as 30 days prior to date set for opening of bids
III Capacitive VoltageTransformer
a) Raw Material
b) Labour I= Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2001= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
The sum of the value of coefficients for raw materials: a+b+c+d=0.55 to 0.65 and sum of all the coefficients including labour shall be a+b+c+d+l=0.85.
a) Raw Material
b) Labour I= Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2001= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
The sum of the value of coefficients for raw materials: a+b+c+d=0.55 to 0.65 and sum of all the coefficients including labour shall be a+b+c+d+l=0.85.
IV Surge Arrester
a) Raw Material
b) Labour I= Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2001= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
The sum of the value of coefficients for raw materials: a+b+c+d=0.55 to 0.65 and sum of all the coefficients including labour shall be a+b+c+d+l=0.85.
V PVC/XLPE Insulated Power and Control Cable
a) a=PVC Compound 0.15
b) Published Price of Metal IEEMA
i) Aluminium per MT IEEMA
ii) Copper per MT IEEMA
c) Weight in MT of Metal per kM (Size wise)
VI Substation Structures
i) Lattice Steel Structures & Pipe Structures (including bolts & nuts, washers & foundation bolts)
a) Raw Materials
i) a=Structural steel 0.58 JPC Market Price (Retail) for average Price of Steel Angles of size 50 x 50 x 6 mm of all cities in Rs./MT as published by Joint Plant Committee(JPC).
ii) b=Electrolytic Zinc 0.16 IEEMA
b) Labour 0.11 Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2001= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
VIII. Series Reactor [ 420 kV, 12 ohm, 2500A, 1-ph air core dry type Series Reactor]
a) Raw Material Copper(a)
i) Aluminium(a) Aluminium(a)
b) Labour I= 0.85 Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2001= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
The value of coefficient for raw materials: a=0.65 to 0.73 and value of coefficient for labour shall be between 0.12 and 0.20, so that sum of all the coefficients including labour shall be a+l=0.85
B. For Installation Price Component
I Installation price component (including Civil works but excluding ‘supply & placement of reinforcement steel’ and ‘concreting’)
i) Labour I= 0.80 Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2001= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
II Supply & Placement of Reinforcement Steel
i) HSD 0.10 Wholesale Price Index Number for `HSD’(Individual Commodity) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry(www.eaindustry.nic.in).
ii) Labour I= 0.05 Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2001= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
iii) Manufacture of Basic Metals 0.65 Wholesale Price Index Number for `Manufacture of Basic Metals’(Group Item) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry(www.eaindustry.nic.in).
III For Concereting
i) HSD 0.20 Wholesale Price Index Number for `HSD’(Individual Commodity) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry(www.eaindustry.nic.in).
ii) Labour I= 0.10 Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2001= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
iii) Manufacture of cement, lime and plaster 0.30 Wholesale Price Index Number for `Manufacture of cement, lime and plaster’(Group Item) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in)
iv) Cutting, shaping and finishing of stone 0.20 Wholesale Price Index Number for `Cutting, shaping and finishing of stone’(Group Item) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry(www.eaindustry.nic.in).
The Bidders are required to estimate and indicate the values of different coefficients for each of the items in the price variation formulae within the specified range such that their summation is as specified in the Bidding Documents. Where no value or ‘-’ or ‘shall be furnished later’ is specified against the coefficient, the same will be deemed to be zero and the fixed component would be suitably adjusted. If the values of all coefficients in price variation formulae indicated by the Bidder are within the specified range but their sum exceeds the summation specified in the Bidding Documents, the values of the coefficients shall be pro-rata adjusted such that the summation remains as per the provisions of the Bidding Documents. If the values of all coefficients indicated by the Bidder are within the specified range but their summation is less than the value specified in the Bidding Documents, the values of the coefficients as indicated by the Bidder shall be considered as such and the fixed component in the price variation formulae would be suitably adjusted. Further, if any of values of the coefficients indicated by the Bidder is out of the range specified in the Bidding Documents, the lower of the values, as indicated by the Bidder vis-à-vis lower value of the range for that coefficient specified in the Bidding Documents, shall be considered and the fixed component would be suitably adjusted.
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081 ATTACHMENT-13
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
(Declaration regarding Social Accountability)
Bidder’s Name and Address : To:
0 Sr.GM, C&M Department
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 SRTS-II,RHQ,Bangalore-560064
We conform that we stand committed to comply to all requirements of Social Accountability Standards i.e., SA8000 (latest Standard available at www.sa-intl.org) and maintain the necessary records.
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081 ATTACHMENT-14
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
Bidder’s Name and Address : To:
0 Sr.GM, C&M Department
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 SRTS-II,RHQ,Bangalore-560064
Integrity Pact is annexed herewith this Volume.
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
Instruction for printing & submitting Integrity Pact
1. The requisite format of Integrity Pact is getting generated automatically and displayed here below.
2. Take print out of first page on a non-judicial stamp paper of Rs. 100/- and other seven pages on plain A4 size paper. Such two sets shall be prepared by the bidder.
3. All the pages of both the copies of the Integrity Pact shall be signed by the authorised representative of the bidder and duly stamped.
4. Both the original copies shall be submitted by the bidder in the form of Hard Copy as part of the first envelope before due date & time of submission of the bid.
5. For further details bidders may please refer ITB Clause 9.3 (o).
Power Grid Corporation of India Limited 0 0
having its Registered Office at B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi – 110016 hereinafter referred to as 0 0
"POWERGRID", 0 0
having its Registered Office at
hereinafter referred to as
"The Bidder/Contractor"
POWERGRID intends to award, under laid-down organisational procedures, contract(s) for Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL), Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Integrity Pact Page 1 of 8
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL), Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081 . POWERGRID values full compliance with all relevant laws of the land, rules, regulations, economic use of resources, and of fairness / transparency in its relations with its Bidders/ Contractors.
In order to achieve these goals, POWERGRID and the above named Bidder/Contractor enter into this agreement called 'Integrity Pact' which will form a part of the bid.
It is hereby agreed by and between the parties as under:
Section I - Commitments of POWERGRID
(1) POWERGRID commits itself to take all measures necessary to prevent corruption and to observe the following principles :
a) No employee of POWERGRID, personally or through family members, will in connection with the tender, or the execution of the contract, demand, take a promise for or accept, for him/herself or third person, any material or other benefit which he/she is not legally entitled to.
b) POWERGRID will, during the tender process treat all Bidder(s) with equity, fairness and reason. POWERGRID will in particular, before and during the tender process, provide to all Bidder(s) the same information and will not provide to any Bidder(s) confidential/ additional information through which the Bidder(s) could obtain an advantage in relation to the tender process or the contract execution.
c) POWERGRID will exclude from evaluation of Bids its such employee(s) who has any personnel interest in the Companies/Agencies participating in the Bidding/Tendering process and all known prejudiced persons.
(2) If POWERGRID obtains information on the conduct of any of its employee which is a criminal offence under the IPC / PC Act , or if there be a substantive suspicion in this regard, POWERGRID will inform its Chief Vigilance Officer and in addition disciplinary actions can be initiated under POWERGRID’s Rules.
Section II - Commitments of the Bidder/Contractor
(1) The Bidder/Contractor commits itself to take all measures necessary to prevent corruption. The Bidder/Contractor commits itself to observe the following principles
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Integrity Pact Page 2 of 8
during his participation in the tender process and during the contract execution :
a) The Bidder/Contractor will not, directly or through any other person or firm, offer, promise or give to any of POWERGRID's employees involved in the tender process or the execution of the contract or to any third person any material or other benefit which it is not legally entitled to, in order to obtain in exchange an advantage of any kind whatsoever during the tender process or during the execution of the contract
b) The Bidder/Contractor will not enter into any illegal or undisclosed agreement or understanding, whether formal or informal with other Bidders/Contractors. This applies in particular to prices, specifications, certifications, subsidiary contracts, submission or non-submission of bids or actions to restrict competitiveness or to introduce cartelization in the bidding process.
c) The Bidder/Contractor shall not pass any information provided by POWERGRID as part of business relationship to others and shall not commit any offence under PC / IPC Act.
d) The Bidder/Contractor of foreign origin shall disclose the name and address of the Agents/representatives in India, if any, involved directly or indirectly in the Bidding. Similarly, the Bidder/Contractor of Indian Nationality shall furnish the name and address of the foreign principals, if any, involved directly or indirectly in the Bidding.
e) The Bidder/Contractor will, when presenting his bid, disclose any and all payments made, or committed to or intends to make to agents, brokers or any other intermediaries in connection with the award of the contract and/or with the execution of the contract.
f) The Bidder/Contractor will not misrepresent facts or furnish false/forged documents/information in order to influence the bidding process or the execution of the contract to the detriment of POWERGRID.
g) The Bidder/Contractor shall ensure adoption of Integrity Pact by its Sub-contractors and shall be responsible for the same.
(2) The Bidder/Contractor will not instigate third persons to commit offences outlined above or be an accessory to such offences.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Integrity Pact Page 3 of 8
Section III- Disqualification from tender process and exclusion from future contracts
(1) If the Bidder, before contract award, has committed a transgression through a violation of Section II or in any other form such as to put his reliability or credibility as Bidder into question, POWERGRID may disqualify the Bidder from the tender process or terminate the contract, if already signed, for such reason.
(2) If the Bidder/Contractor has committed a transgression through a violation of Section II such as to put his reliability or credibility into question, POWERGRID may, after following due procedures, ban /blacklist the Bidder/Contractor in line with POWERGRID’s policy for “Black-Listing of Firms / Banning of Business”. The imposition and duration of the ban will be determined by the severity of the transgression. The severity will be determined by the circumstances of the case, in particular the number of transgressions, the position of the transgressors within the company hierarchy of the Bidder/Contractor and the amount of the damage. The ban will be imposed for a maximum of 3 years.
(3) If the Bidder/Contractor can prove that he has restored/recouped the damage caused by him and has installed a suitable corruption prevention system, POWERGRID may revoke the ban prematurely.
Section IV - Liability for violation of Integrity Pact
(1) If POWERGRID has disqualified the Bidder from the tender process prior to the award under Section III, POWERGRID is entitled for forfeiture of the Bid Guarantee under the Bid.
(2) If POWERGRID has terminated the contract under Section III or if POWERGRID is entitled to terminate the contract under Section III, POWERGRID shall be entitled to forfeit the Contract Performance Guarantee of this contract, in full or part thereof as may be decided, besides resorting to other remedies under the contract.
Section V- Previous Transgression
(1) The Bidder shall disclose in its Bid any transgressions occurred in the last 10 years with any other Public Sector Undertaking or Government Department or any other Company, in any country, that may impinge on the Anti-corruption principle.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Integrity Pact Page 4 of 8
(2) If the Bidder makes incorrect statement on this subject, it can be disqualified from the tender process or the contract, if already awarded, can be terminated for such reason and further action can be taken in line with POWERGRID’s policies.
Section VI - Equal treatment to all Bidders / Contractors
(1) POWERGRID will enter into agreements with identical conditions as this one with all Bidders.
(2) POWERGRID will disqualify from the tender process any bidder who does not sign this Pact or violate its provisions.
Section VII - Punitive Action against violating Bidders / Contractors
If POWERGRID obtains knowledge of conduct of a Bidder or a Contractor or his subcontractor or of an employee or a representative or an associate of a Bidder or Contractor or his Subcontractor which constitutes corruption, or if POWERGRID has substantive suspicion in this regard, POWERGRID will inform the Chief Vigilance Officer (CVO).
(*)Section VIII - Independent External Monitor/Monitors
(1) POWERGRID has appointed a panel of Independent External Monitors (IEMs) for this Pact with the approval of Central Vigilance Commission (CVC), Government of India. The names of the IEMs have been indicated in the Bidding Documents.
(2) The panel of IEMs shall review independently and objectively, whether and to what extent the parties comply with the obligations under this agreement. The panel of IEMs has right of access to all project documentation. The panel of IEMs may examine any complaint received by them and submit a report to Chairman-cum-Managing Director, POWERGRID, giving joint findings, at the earliest. The panel of IEMs may also submit a report directly to the CVO and the CVC, in case of suspicion of serious irregularities attracting the provisions of the PC Act.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Integrity Pact Page 5 of 8
(3) The IEM is not subject to instructions by the representatives of the parties and performs his functions neutrally and independently. He / She reports to the Chairman-cum-Managing Director, POWERGRID.
(4) The Bidder(s)/Contractor(s) accepts that the IEM has the right to access without restriction to all documentation of POWERGRID related to this contract including that provided by the Contractor/Bidder. The Bidder/Contractor will also grant the IEM, upon his / her request and demonstration of a valid interest, unrestricted and unconditional access to their documentation. The same is applicable to Subcontractors. The IEM is under contractual obligation to treat the information and documents of the Bidder(s)/Contractor(s)/Subcontractor(s) with confidentiality.
(5) POWERGRID will provide to the IEMs information as sought by him / her which could have an impact on the contractual relations between POWERGRID and the Bidder/Contractor related to this contract. The IEMs shall also sign declaration on ’Non-Disclosure of Confidential Information’ and of ‘Absence of Conflict of Interest’. In case of any conflict of interest arising at a later date, the IEM shall inform Chairman-cum-Managing Director, POWERGRID and recuse himself/herself from that case.
(6) As soon as the IEM notices, or believes to notice, a violation of this agreement, he / she will so inform the Chairman-cum-Managing Director, POWERGRID and request the Chairman-cum-Managing Director, POWERGRID to discontinue or take corrective action, or to take other relevant action. The IEM can in this regard submit non-binding recommendations. Beyond this, the IEM has no right to demand from the parties that they act in a specific manner, refrain from action or tolerate action. However, the IEM shall give an opportunity to POWERGRID and the Bidder/Contractor, as deemed fit, to present its case before making its recommendations to POWERGRID.
(7) The IEM will submit a written report to the Chairman-cum-Managing Director, POWERGRID within 8 to 10 weeks from the date of reference or intimation to him by POWERGRID and, should the occasion arise, submit proposals for correcting problematic situations.
(8) If the IEM has reported to the Chairman-cum-Managing Director, POWERGRID, a substantiated suspicion of an offence under PC / IPC Act, and the Chairman-cum-Managing Director, POWERGRID has not, within the reasonable time taken visible action to proceed against such offence or reported it to the CVO, the Monitor may also transmit this information directly to the CVC, Government of India.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Integrity Pact Page 6 of 8
(9) While representing any matter in relation to the Integrity pact inter-alia including its transgression to the panel of IEMs, POWERGRID and Bidder/Contractor shall not approach the court of law and await the decision of the IEM in the matter.
(10) The word ‘IEM’ would include both singular and plural.
(*) This Section shall be applicable for only those packages wherein the IEMs have been identified in Section – I : Invitation for Bids and/or Clause ITB 9.3 in Section – III: Bid Data Sheets of Conditions of Contract, Volume-I of the Bidding Documents.
Section IX - Pact Duration
This Pact begins when both parties have legally signed it. It expires for the Contractor after the closure of the contract and for all other Bidder's six month after the contract has been awarded.
Section X - Other Provisions
(1) This agreement is subject to Indian Law. Place of performance and jurisdiction is the establishment of POWERGRID. The Arbitration clause provided in the main tender document / contract shall not be applicable for any issue / dispute arising under Integrity Pact.
(2) Changes and supplements as well as termination notices need to be made in writing. Side agreements have not been made.
(3) If the Contractor is a partnership firm or a consortium or Joint Venture, this agreement must be signed by all partners, consortium members and Joint Venture partners.
(4) Nothing in this agreement shall affect the rights of the parties available under the General Conditions of Contract (GCC) and Special Conditions of Contract (SCC).
(5) Issues like Warranty/Guarantees etc. shall be outside the purview of IEMs.
(6) Views expressed or suggestions/submissions made by the parties and the recommendations of the CVO/IEM# in respect of the violation of this agreement, shall not be relied on or introduced as evidence in the arbitral or judicial proceedings (arising out of the arbitral proceedings) by the parties in connection with the disputes/differences arising out of the subject contract.
# CVO shall be applicable for packages wherein IEM are not identified in Section IFB/BDS of Condition of Contract, Volume-I. IEM shall be applicable for packages wherein IEM are identified in Section IFB/BDS of Condition of Contract, Volume-I.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Integrity Pact Page 7 of 8
(7) Should one or several provisions of this agreement turn out to be invalid, the remainder of this agreement remains valid. In this case, the parties will strive to come to an agreement to their original intentions.
Signature Signature
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
(Office Seal) (Office Seal)
Designation : Designation :
Witness 1 : Witness 1 :
Designation : Designation :
Witness 2 : Witness 2 :
Designation : Designation :
Integrity Pact Page 8 of 8
Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081 Attachment-15 0
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
Information for E – payment, PF details and declaration for Micro/Small and Medium Enterprise
Bidder’s Name and Address : To:
0 Sr.GM, C&M Department
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 SRTS-II,RHQ,Bangalore-560064
I We have read the provisions in the Bidding Documents regarding furnishing the option for advance payment. Accordingly, as per ITB Clause 9.3 as provided in Section BDS, Section III, Vol.-I of the Bidding Documents, we hereby confirm to opt the following:
Interest Bearing Initial Advance
Supply Portion:
Services Portion:
II We are furnishing the following details of Statutory Registration Numbers and details of Bank for electronic payment.
1. Name of the Supplier/ Contractor in whose favour payment is to be made 0
2. Address with PIN Code and State
Registered Office:
Correspondence Address:
3. (a) Status – Company/others
[Declaration of Micro/ Small/ Medium Enterprise under Micro/ Small & Medium Enterprises Development Act 2006, if applicable]
3. (b) Are you a MSE owned by SC/ST* entrepreneurs in line with Public Procurement Policy for Micro and Small Enterprises (MSEs) order 2012 including subsequent amendment/notification/order (Indicate Yes/No) Note: Documentary evidence is to be attached. Please refer remarks at the end of the attachment. No
3. (c ) If 3(b) is ‘Yes’ please mention whether you are (Proprietary MSE/ Partnership MSE/ Private Limited Company) owned by SC/ST entrepreneurs
3. (d ) Are you a MSE owned by women in line with Public Procurement Policy for Micro and Small Enterprises (MSEs) order 2012, Public Procurement Policy for Micro and Small Enterprises (MSEs) Amendment order 2018 including subsequent amendment/notification/order (Indicate Yes/No) Note: Documentary evidence is to be attached.
4. Permanent Account (PAN) No.
5. GSTIN Numbers
I. GSTIN in the Sates/UT from where the supply of goods take place
Name of the States/UT GSTIN number
II. GSTIN in the States/UT where the supply for services take place (states where sites under the subject package is situated)
Name of the States/UT GSTIN number
6 PF Registration No. of the Company
7 PF Regional Office covered (with Address)
8 Name of Contact Person
9 Contact Details
10 Bank Details for Electronic Payment
Name of the Bank:
Address of Branch:
Type of Account:
Type of Account: Saving Account
11 9 digit MICR code printed at bottom in middle, next to cheque no.
12 IFSC (for RTGS)/NEFT Code (to be obtained from the Bank) Sample Cancelled Cheque to be enclosed
We hereby declare that the above information are true and correct and we agree that the payment on account of this Contract, in the event of award, be made in the above account maintained in the above mentioned Bank.
*The definition of MSEs owned by SC/ST is as given under:
a. In case of proprietary MSE, proprietor(s) shall be SC /ST.
b. In case of partnership MSE, the SC/ST partners shall be holding at least 51% shares in the unit.
c. In case of Private Limited companies, at least 51% share shall be held by SC/ST promoters.
Documentary evidence: Please provide scanned copy(ies) of the SC/ST certificate(s) issued by District Authority as applicable for SC/ST MSE category as per (a), (b) or (c) above.
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081 ATTACHMENT-16
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
(Additional Information) 1
Bidder’s Name and Address : To:
0 Sr.GM, C&M Department
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 SRTS-II,RHQ,Bangalore-560064
In support of the additional information required as per ITB Sub-Clause 9.3 (q) of the Bidding Documents, we furnish herewith our data/details/documents etc., alongwith other information, as follows (the stipulations have been reproduced in italics for ready reference):
1.0 The Bidder shall furnish
A certificate from their Banker(s) (as per prescribed formats in Form 16, Section-VI: Sample Forms and Procedures) indicating various fund based/non fund based limits sanctioned to the Bidder and the extent of utilization as on date. Such certificate should have been issued not earlier than three months prior to the date of bid opening. Wherever necessary the Employer may make queries with the Bidders’ Bankers. [Reference ITB clause 9.3(q)(i)]
1.1 In accordance with 1.0, certificate(s) from banker as per requisite format, indicating various fund based/non fund based limits sanctioned to the bidder or each member of the joint venture and the extent of utilization as on date is/are enclosed, as per the following details:
Name of the Bidder : 0 1
Name of the Banker by whom certificate issued 1
Date of certificate (should not be earlier than 3 months prior to date of bid opening)
Whether fund based/non fund based limits are indicated in the certificate
Whether extent of utilization is indicated in the certificate
1.2 The Bidder should accordingly also provide the following information/documents
(i) Details of Banker:
Address of Banker
Contact Name and Title
(ii) As per para 1.0, Authorization Letter(s) from the bidder (in case of JV bidder, from all the partners) addressed to the Banker(s), authorizing POWERGRID to seek queries about the bidder with the Banker(s) and advising the Banker(s) to reply the same promptly, is/are enclosed as per following details:
Sl. No. Letter Ref. Date Addressed to (name of the Bank)
(iii) As per para BDS/ITB clause 9.3 (q), Bidder shall furnish the details of their Provident Fund Code Number
Sl. No. Name of the Bidders/JV Partners Provident Fund Code Number Details
2.0 Litigation History
The bidder should provide detailed information on any litigation or arbitration arising out of contracts completed or under execution by it over the last five years. A consistent history of awards involving litigation against the Bidder or any partner of JV may result in rejection of Bid. [Reference ITB clause 9.3(q)(ii)]
2.1 Details of litigation history resulting from Contracts completed or under execution by the bidder over the last five years.
Year Name of client, cause of litigation/arbitration and matter in dispute Details of Contract and date Award for or against the bidder Disputed amount
3.0 Details regarding previous transgressions of Integrity Pact
The bidder should provide detailed information on any transgression of Intehrity Pact that occured in the last 10 years with any other Public Sector Undertaking or Government Department or any other Company, in any country.
3.1 Details regarding previous transgressions of Integrity Pact that occurred in the last 10 years
Year Name of client Details of Transgression of Integrity Pact by the bidder
4.0 OTHER INFORMATION
4.1 Current Contract Commitments of works in progress
Bidders (individual firms or each partners of JV) should provide information on their current commitments on all contracts that have been awarded, or for which a letter of intent or acceptance has been received, or for contracts approaching completion, but for which an unqualified, full completion certificate has yet to be issued.
Details of Contract Value of outstanding work (Rs.) Estimated completion date
4.2 Financial Data:
Details Actual (Previous five years) Projection for next five years
Total Liability
Current Liability
Profit before taxes
Profit after taxes
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081 ATTACHMENT-17
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
(Declaration for tax exemptions, reductions, allowances or benefits)
Bidder’s Name and Address : To:
0 Sr.GM, C&M Department
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 SRTS-II,RHQ,Bangalore-560064
Dear Sirs, 1. We confirm that we are solely responsible for obtaining following tax exemptions, reductions, allowances or benefits in respect of supplies under the subject package, in case of award. We further confirm that we have considered the same in our bid thereby passing on the benefit to POWERGRID while quoting our prices. In case of our failure to receive such benefits, partly or fully, for any reason whatsoever, the Employer will not compensate us. 2. We are furnishing the following information required by the Employer for issue of requisite certificate if and as permitted in terms of the applicable Govt. of India policies/procedures (in case of award):
Applicable Act, Notification No. and Clause Ref. No. Sl. No. Description of item on which applicable Country of origin Remarks, if any
(The requirements listed above are as per current Notification of Govt. of India indicated above. These may be modified, if necessary, in terms of the Notifications.)
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
Instruction for printing & submitting Safety Pact
1. The requisite format of Safety Pact is getting generated automatically and displayed here below:
2. Take print out of first page on a non-judicial stamp paper of Rs. 100/- and other four pages on plain A4 size paper. Such two sets shall be prepared by the bidder.
3. All the pages of both the copies of the Safety Pact shall be signed by the authorised representative of the bidder and duly stamped.
4. Both the original copies shall be submitted by the bidder in the form of Hard Copy as part of the first envelope before due date & time of submission of the bid.
5. For further details bidders may please refer ITB Clause 9.3 (s).
Power Grid Corporation of India Limited 0 0
having its Registered Office at B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi – 110016 hereinafter referred to as 0 0
"POWERGRID", 0 0
0 1 having its Registered Office at ,
having its Registered Office at 1 AND
hereinafter referred to as
"The Bidder/Contractor"
POWERGRID intends to award, under laid-down organisational procedures, contract(s) for Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081
POWERGRID values full compliance with all relevant laws and regulations and the principles of Safety, Health& Environment in its relations with its Bidders/ Contractors.
In order to achieve these goals, POWERGRID and the above named Bidder / Contractor enter into this agreement called “Safety Pact” which will form part of the Bid. It is hereby agreed by and between the parties as under:
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Safety Pact Page 1 of 5
Section I – Commitments of POWERGRID:
POWERGRID commits itself to take all measures necessary to prevent accidents duringConstruction and Operation of the Transmission Assets and to observe the following:
1 POWERGRID recognizes and accepts its statutory responsibilities for ensuring construction, operation and maintenance of equipments and for the provision of safe methods of work and safe working conditions.
2 POWERGRID recognizes and accepts its statutory responsibilities for ensuring safety of not only its employees but also that of the Contracting Agencies as Principal Employer
3 POWERGRID shall review the accidents in a structured manner and take necessary actions to ensure that the safety criteria are strengthened for safe construction as well as Operation & Maintenance of the Transmission Assets.
4 POWERGRID shall conduct necessary awareness and training programmes to its Employees to augment the various safety requirements to be followed during Construction and Operation & Maintenance of the Transmission Assets from time to time.
5 POWERGRID shall, from time to time, issue necessary guidelines, instructions and deterrents to its employees as well as to the Contracting Agencies, to update them to take necessary preventive measures to avoid repetition of similar accident attributes.
6 POWERGRID shall review and provide necessary guidanceto the Contracting Agencies, as and when, any abnormality / special situations are brought to its notice by the Contracting Agencies during execution of the Transmission Projects being executed by them.
7 POWERGRID shall conduct periodical surveillance site inspections / audits to identify the unsafe conditions and unsafe actions, and bring them to the knowledge of the Contracting Agencies for taking timely corrective actions.
8 POWERGRID shall investigate all accidents, fatal as well as non-fatal, to identify the lapses, the reason for the accident / incident and suggest measures for prevention of recurrence of such accidents, and fix responsibility for the lapses leading to the accident.
9 POWERGRID shall augment the training to the workers and supervising personnel of the Contracting Agencies, as per schedules, upon nomination by the Contracting Agencies in reasonable time frame.
10 POWERGRID shall exercise the right to claim and recover compensation from the Contracting Agencies in case of any violation of the safety requirements / provisions during execution of the Transmission Projects, as built in the applicable Laws and contractual specifications / guidelines in vogue / issued by POWERGRID from time to time.
11 Section II – Commitments of the Bidder / Contractor:
The Bidder / Contractor commits himself to take all measures necessary to prevent / minimise accidents at their construction / erection sites and to observe the following:
1 TheBidder / Contractor recognizes and accepts the statutory and comprehensive responsibility for ensuring safe construction and Testing & Commissioning in the Transmission Projects being executed by them by providing safe methods of work, working conditions and Tools & Plants for human safety.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Safety Pact Page 2 of 5
2 The Bidder / Contractor recognizes and accepts the responsibilities for ensuring safety of not only their employees but also that of the Sub-contractors, Principal Employer and the general public during execution of the Transmission Projects / works.
3 The Bidder / Contractor shall review the accidents in a structured manner and take necessary actions to ensure that the safety criteria are strengthened for safe construction of the Transmission Assets.
4 The Bidder / Contractor shall endeavour continuous development of safe methods of work to ensure that the effect of risks and perils are minimised to the extent possible and implement the same at their worksites.
5 The Bidder / Contractor shall conduct periodical Training to their Employees as well as to that of their Sub-contractors for safety awareness during construction works being executed by them.
6 The Bidder / Contractor shall provide all requisite Tools & Plants required for the work and ensure their healthiness by periodical inspections / testing as required. Unhealthy and sub-standard Tools & Plants will be immediately removed from site as and when they are identified.
7 The Bidder / Contractor shall,at their cost, provide all necessary Personal Protective Equipments such as Double Lanyard Safety Belts, Appropriate Fall Arrest Systems, Safety Helmets, Foot Wear, Hand Gloves, etc., as required for various activities pertaining to execution of the Projects / works, confirming to relevant Indian Standards.
8 The Bidder / Contractor shall ensure that dedicated qualified Safety Officers are posted in the construction projects being executed by them and ensure that the Safety Officer visits each and every gang periodically and conducts audits / inspections to identify the unsafe conditions and unsafe actions, to be rectified by the site supervising personnel promptly.
9 The Bidder / Contractor shall conduct appropriate medical checks-up for the workers before deploying them at their construction sites to ensure that only those who are medically fit are deployed in the Projects / works to be executed by them. The copy of the Medical Reports shall be provided by the Bidder / Contractor to POWERGRID, whenever requested by POWERGRID.
10 The Bidder / Contractor shall screen the workers before deploying them at their construction sites to ensure that only those with the skills, experience and competence to work at height and also medically fit for work at height are deployed for work at height in the Projects executed by them.
11 The Bidder / Contractor shall ensure daily before starting the work that their site Supervising Personnel / Safety Officer briefs the workers about the work for the day and the safety measures / precautions required to be taken by them.
12 The Bidder / Contractor shall investigate all the accidents at their working sites to ascertain the lapses leading to the incident and the precautionary / corrective measures required to be taken to avoid recurrence of such accidents. These accidents will be reviewed at the Board Management level of the Agencies and the findings / recommendations will be put up to POWERGRID Apex Safety Board within the stipulated period.
13 The Bidder / Contractor shall ensure that all accidents, whether fatal or non-fatal in nature, will be informed to POWERGRID, in writing, immediately on the occurrence of the same,and in any case, within not more than 24 hours of occurrence of the same.
14 The Bidder / Contractor shall ensure that in case of any accident, all necessary medical help / supportshall be provided to the victims / injured till they are completely fit to return to work.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Safety Pact Page 3 of 5
15 The Bidder / Contractorshall ensure that in case of fatal accidents, all statutory Authorities, including Police, concerned Labour Dept. Officials, concerned Workmen Compensation Commissioner, etc., will be intimated in writing as required by the statutory Law, and followed up for compliance of all statutory obligations. The Bidder / Contractor shall own full responsibility of timely accident reporting to various authorities, including POWERGRID.
16 The Bidder / Contractor shall ensure that in case of fatality or serious injury leading to permanent disablement of the victims, the compensation amount will be deposited with the concerned authorities, as required by the Laws, and followed up for early disbursement to the beneficiaries of the victims.
17 The Bidder / Contractor assures that they shall co-operate to the fullest extent for carrying out any investigation of the accidents at their work sites by POWERGRID to identify the lapses, the reason for the accident / incident and suggest measures for prevention of recurrence of such accidents. All factual details of the occurrence of the accident will be provided to POWERGRID, as and when required.
18 The Bidder / Contractor assures that they take full responsibility of meeting the statutory obligations in case of accidents, and in case of any reference by any Statutory Body at a later date also, they shall provide all information to POWERGRID and meet all the statutory obligations, including payment of additional compensation, if any.
19 The Bidder / Contractor assures that in case of any inspection of their work site or Notice by any Statutory Authority, they shall comply promptly and inform POWERGRID Site Officials of the same, and also provide all necessary information and assistance for smooth compliance of the observations / instructions of such Authorities.
20 The Bidder / Contractor accepts the provisions regarding safety, including payment of any sums to POWERGRID, in case of any violation of the safety requirements / provisions during execution of the Transmission Projects, as built in the Contractual Conditions, Safety Plan and the Safety Pact, and confirm to abide by the same.
Section III – Equal treatment to all Bidders / Contractors:
1 POWERGRID will enter into agreements with identical conditions as this one with all Bidders.
2 POWERGRID will disqualify, from the tender process, any bidder/ take punitive actions on the bidder, who does not sign this Pact or violate its provisions.
Section IV – Pact Duration:
This Pact begins when both parties have legally signed it. It expires for the successful Bidder / Contractor after closure of the contract and, for all other Bidders, after the contract has been awarded.
Section V – Other Provisions:
1 This agreement is subject to Indian Law. Place of performance and jurisdiction is the establishment of POWERGRID. The Arbitration clause provided in the main tender document / contract shall not be applicable for any issue / dispute arising under the Safety Pact.
2 Changes and supplements need to be made in writing, which shall come into force only upon mutual agreement / acceptance.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Safety Pact Page 4 of 5
3 If the Contractor is a partnership firm or consortium of Joint Venture, this agreement must be signed by all partners, consortium members and Joint Venue partners, as applicable as per the Tender Specifications.
4 Nothing in this agreement shall affect the rights of the parties available under General Conditions of Contract (GCC) and Special Conditions of Contract (SCC).
5 Should one or several provisions of this agreement turn out to be invalid, the reminder of this agreement remains valid. In this case, the parties will strive to come to an agreement to their original intentions.
Signature Signature
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
(Office Seal) (Office Seal)
Designation : Designation :
Witness 1 : Witness 1 :
Name & Address: Name & Address:
Witness 1 : Witness 1 :
Name & Address: Name & Address:
Safety Pact Page 5 of 5
Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081 ATTACHMENT-19
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
Bidder’s Name and Address : To:
0 Sr.GM, C&M Department
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 SRTS-II,RHQ,Bangalore-560064
Further, we hereby confirm that except as mentioned in the Attachment – 6 (Alternative, Deviations and Exceptions to the Provisions) hereof, forming part of our First Envelope :
(i) there are no discrepancies/inconsistencies and deviations/omissions/ reservations to the Bidding Documents, in the Second Envelope bid;
We also confirm that in case any discrepancies/ inconsistencies and deviations/ omissions/ reservations, as referred to in para (i) and (ii) above, is observed in the Second Envelope, the same shall be deemed as withdrawn/rectified without any financial implication, whatsoever to POWERGRID. However, in case of any arithmetical errors, the same shall be governed as per the provision of ITB Sub-Clause 27.2 read in conjunction with BDS
Date 0-Jan-1900 Printed Name 0
Place 0 Designation 0
Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081 ATTACHMENT-18A
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
(Declaration regarding supply of 400kV Class GIS Circuit Breaker bay from Subsidiary/ Group Company /Joint Venture Company in India of the Foreign Bidder)
Bidder’s Name and Address : To:
0 Contract Services
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 "Saudamini", Plot No. 2, Sector 29
0 Gurgaon (Haryana) - 122001
1 We have read the provisions in the Bidding Documents regarding manufacture and supply of 400kV Class GIS Circuit Breaker bay from the manufacturing facilities of our Subsidiary / Group Company / Joint Venture Company in India pursuant to GCC Sub-Clause 5.1. Accordingly, as per Qualification requirement specified in Annexure-A (BDS) and ITB Clause 11.1 as modified in Section BDS, Section III, Vol.-I of the Bidding Documents, we hereby declare that:
*We propose to supply only One (01) number 400kV class GIS Circuit Breaker bay from the manufacturing facilities of our Subsidiary / Group Company / Joint Venture Company in India within the Time for Completion, pursuant to GCC Sub-Clause 5.1. FALSE
*We propose to supply more than One (01) number (i.e, number) of 400kV GIS Circuit Breaker bay from the Subsidiary/ Group Company / Joint Venture Company in India, as our Indian Subsidiary/ Group Company / Joint Venture Company complies with the requirement stipulated in Qualification requirement specified in Annexure-A (BDS) and ITB Clause 11.1 as modified in Section BDS. In support of the compliance to requirements specified in ITB Clause 11.1 as modified in Section BDS and GCC Sub-Clause 5.1, we furnish enclosed herewith the following documents: TRUE Please insert the number of 400kV GIS Circuit Breaker bay proposed to be supplied from the Subsidiary/ Group Company / Joint Venture Company in India, as our Indian Subsidiary/ Group Company / Joint Venture Company
*Choose whichever is applicable
Date 0 Printed Name 0
Place 0 Designation 0
*We propose to supply more than One (01) number (i.e, number) of 400kV GIS Circuit Breaker bay from the Subsidiary/ Group Company / Joint Venture Company in India, as our Indian Subsidiary/ Group Company / Joint Venture Company complies with the requirement stipulated in Qualification requirement specified in Annexure-A (BDS) and ITB Clause 11.1 as modified in Section BDS. In support of the compliance to requirements specified in ITB Clause 11.1 as modified in Section BDS and GCC Sub-Clause 5.1, we furnish enclosed herewith the following documents:
Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081 ATTACHMENT-23-A
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
Declaration by the Bidder in line with Annexure-A (BDS) regarding already having manufacturing & testing facilities for 400kV or above voltage level GIS in India as on the originally scheduled date of bid opening.
Bidder’s Name and Address : To:
0 Sr.GM, C&M Department
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 SRTS-II,RHQ,Bangalore-560064
We hereby confirm that we have already incorporated Subsidiary Company */Group Company * /Joint Venture Company * as per Companies Act of India, in line with GCC clause 5.1 to manufacture 400KV or above voltage level GIS in India as on the originally scheduled date of bid opening mentioned in Annexure-A (BDS).
We further confirm that the said Subsidiary Company */Group Company * /Joint Venture Company * has manufacturing & testing facilities for 400kV or above voltage level GIS in India as on the originally scheduled date of bid opening mentioned in Annexure-A (BDS).
Further, we are furnishing the requisite document in support of the above which are attached herewith.
* Stike out which ever is not applicable
Date 0-Jan-1900 Printed Name 0
Place 0 Designation 0
Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081 ATTACHMENT-23-B
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
Declaration by the Bidder in line with Annexure-A (BDS) regarding commencement of construction activities for establishment of 400kV or above voltage level GIS manufacturing and testing facilities in India as on the originally scheduled date of bid opening.
Bidder’s Name and Address : To:
0 Sr.GM, C&M Department
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 SRTS-II,RHQ,Bangalore-560064
We hereby confirm that we have already incorporated Subsidiary Company */Group Company * /Joint Venture Company * as per Companies Act of India, in line with GCC clause 5.1 to manufacture 400KV or above voltage level GIS in India and have commenced the Construction activities for establishment of manufacturing & testing facilities for 400kV or above voltage level GIS in India as on the originally scheduled date of bid opening mentioned in Annexure-A (BDS)
Regarding incorporation of Subsidiary Company */Group Company * /Joint Venture Company * in India and Commencement of Construction activities, we here by declare as under :
a) Our Subsidiary Company */Group Company * /Joint Venture Company * has been incorporated on ___________________ as per Companies Act of India (Documentary Evidence is Attached herewith).
b) Land is in legal and physical possession (Documentary evidence is attached herewith)
c) All Building designs, ordering of civil works have been completed and civil work at site have commenced (Documentary evidence is attached herewith)
d) Purchase order for major long delivery testing equipment have been placed with delivery and commissioning schedule (Documentary evidence is attached herewith)
e) Action plan for availability of trained manpower to take up manufacturing and testing of GIS module is attached herewith.
* Stike out which ever is not applicable
Date 0-Jan-1900 Printed Name 0
Place 0 Designation 0
Before filling up the Bid Form, the Bidder is required to fill up the details as under :
1 Tick whichever is applicable:
2 Enter Details of Amendments:
Amendments to Bidding Documents issued:
4 Currency INR Amount
5 Validity in days
6* In case the Bidder is MSE, then insert the Designated Authority under GoI with which they are Registered: ghtg
* applicable for MSE only
Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081 Bid Form (First Envelope) 1 st 1 January 1 one
2 nd 2 February 2 two
BID FORM (First Envelope) 3 rd 3 March 3 three
4 th 4 April 4 four
Bid Proposal Ref. No.: 5 th 5 May 5 five
Date : 00-Jan-00 7 th 0 6 June 7 seven
8 th 1 7 July 8 eight
To: 9 th January 8 August 9 nine
Sr.GM, C&M Department 10 th 1900 9 September 10 ten
Power Grid Corporation of India Ltd., 11 th 10 October 11 eleven
SRTS-II,RHQ,Bangalore-560064 12 th 11 November 12 twelve
0 13 th 12 December 13 thirteen
14 th Zero 14 fourteen
15 th () 15 fifteen
Name of Contract : Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL) Ref.No/Specification No:SRTS-II/C&M/WC-4880/2026 SR2/T/S-CONS/DOM/C00/26/09081 the receipt of which is hereby acknowledged, we the undersigned, offer to design, manufacture, test, deliver, install and commission (including carrying out Trial Operation, Performance & Guarantee Test as per provision of Technical Specification) the Facilities under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently).0 16 th 16 sixteen
Dear Ladies and/or Gentlemen, 17 th 17 seventeen
1.0 the receipt of which is hereby acknowledged, we the undersigned, offer to design, manufacture, test, deliver, install and commission (including carrying out Trial Operation, Performance & Guarantee Test as per provision of Technical Specification) the Facilities under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently). 0 18 th 18 eighteen
1.1 We meet the eligibility requirements and have no conflict of interest in accordance with ITB Clause 2 19 th 19 nineteen
2.0 Attachments to the Bid Form (First Envelope) 20 th 20 twenty
2.1 In line with the requirement of the Bidding Documents, we enclose herewith the following Attachments to the Bid Form : 21 st
(a) Attachment 1: Bid Security in the form of for a sum of INR /- () initially valid for a period of () days from the date set for opening of bids. Bank Draft 22 th
OR Enter details here.
Online Payment Acknowledgement towards Bid Security for a sum of ................................................ (name of currency and amount in words and figures) Pay Order
OR documentary evidence in support of exemption of Bid Security, in separate envelope in accordance with clause 13.1 of ITB, Section-II." Banks certified Cheque
(b) Attachment 2: Attachment 2: A power of attorney duly authorized by a Notary Public indicating that the person(s) signing the bid have the authority to sign the bid and thus that the bid is binding upon us during the full period of its validity in accordance with the ITB Clause 14. *Further the requisite deed of Joint Undertaking as per stipulated qualification requirement in Annexure-A (BDS) has also been furnished as per your format. * Delete if not applicable A power of attorney duly authorized by a Notary Public indicating that the person(s) signing the bid have the authority to sign the bid and thus that the bid is binding upon us during the full period of its validity in accordance with the ITB Clause 14. Bank Guarantee 23 th
(c) Attachment 3: The documentary evidence that we are eligible to bid in accordance with ITB Clause 2. Further, in terms of ITB Clause 9.3(c) & (e), the qualification data has been furnished as per your format enclosed with the bidding documents [Attachment – 3(QR)]. 24 th
* Further, the required deed of Joint Venture Agreement signed by us and our Partners has also been furnished as per your format [Attachment – 3(JV)].
(d) Attachment 4: The documentary evidence establishing in accordance with ITB Clause 3, Vol.-I of the Bidding Documents that the facility offered by us are eligible facilities and conform to the Bidding Documents has been furnished as Attachment 4 . Moreover, a list of Special Tools & Tackles to be furnished by us, the cost of which is included in our Bid Price, is also enclosed as per your format as Attachment- 4A. 25 th
(e) Attachment 5: The details of all major items of services or supply which we propose subletting in case of award, giving details of the name and nationality of the proposed subcontractor/sub-vendor for each item. 26 th
(f) Attachment 5A: (Items, Components, Raw Material, Services proposed to be sourced from Micro and Small Enterprises): The details of the items, components, raw material, services which is proposed to bought/availed from Micro and Small Enterprises for the purpose of completion of works
(g) Attachment 6: The variation and deviations from the requirements of the Conditions of Contract, Bid Data Sheet and other commercial conditions, Technical Specification and Drawings (excluding critical provisions as mentioned at clause 6.0 below) in your format enclosed with the Bidding Documents, including, inter-alia, the cost of withdrawal of the variations and deviations indicated therein. 27 th
(h) Attachment 7: The details of Alternative Bids made by us indicating the complete Technical Specifications and the deviation to contractual and commercial conditions. [NOT APPLICABLE] 28 th
(i) Attachment 8: Manufacturer’s Authorisation Forms 29 th
(j) Attachment 9: Work Completion Schedule
(k) Attachment 10: Guarantee Declaration
(l) Attachment 11: Information regarding ex-employees of Employer in our firm
(m) Attachment 12: Filled up information regarding Price Adjustment Data as per the format enclosed in the bidding documents
(n) Attachment 13: Declaration regarding Social Accountability
(o) Attachment 14: Integrity Pact, in a separate envelope, duly signed on each page by the person signing the bid.
(p) Attachment 15: Option for Initial Advance (either Interest Bearing Initial Advance or No Initial Advance) and Information for E – payment, PF details and declaration for Micro/Small and Medium Enterprise
(q) Attachment 16: Additional information
(r) Attachment 17: Declaration for tax exemptions, reductions, allowances or benefits
(s) Attachment 18: Safety Pact
(t) Attachment 19: Declaration
(u) Attachment 20: Declaration of Key Managerial Person jointly with Power of Attorney holder is attached herewith
(v) Attachment 21: Affidavit of Self certification regarding Minimum Local Content in line with PPP-MII order, if applicable
(w) Attachment 22: Certificate from statutory auditor or cost auditor of the company (in the case of companies) or from a practicing cost accountant or practicing chartered accountant (in respect of suppliers other than companies) giving the percentage of Local Content, in line with PPP-MII order, if applicable
(x) Attachment 23: Compliance to the process related to the e-RA Terms & Conditions and the Business Rules governing the e-RA
(y) Attachment 24: Bid security declaration
(z) Attachment 25: Declaration by the Bidder regarding events encountered pursuant to ITB Clause 2.1 (All partners of the Joint Venture in case of Joint Venture bids)
3.0 We are aware that, in line with Clause No. 27.1 (ITB), our Second Envelope (Price Part) is liable to be rejected in case the same contains any deviation/omission from the contractual and commercial conditions and technical Specifications other than those identified in this First Envelope.
4.0 We confirm that except as otherwise specifically provided our Bid Prices in Second Envelope include all taxes, duties, levies and charges as may be assessed on us, our Sub-Contractor/Sub-Vendor or their employees by all municipal, state or national government authorities in connection with the Facilities, in and outside of India.
4.1 100% of applicable Taxes and Duties i.e. GST which are payable by the Employer under the Contract, shall be reimbursed by the Employer on production of satisfactory documentary evidence by the Contractor in accordance with the provisions of the Bidding Documents.
5.0 Construction of the Contract
, whose capacity, capability and experience are enclosed with our Bid as our Associate(s) for the purpose of executing the ‘Second Contract’ and / or the ‘Third Contract’ and written unequivocal consent of the above mentioned proposed Associate(s) to work as your independent Contractor, on the same terms and conditions as offered by us to you in this bid, is also enclosed with the Bid Form. We shall, however, be overall responsible for the execution of all the three Contracts.
5.1 We declare that we have studied Clause GCC 2.1 relating to mode of contracting for Domestic Bidders and we are making this proposal with a stipulation that you shall award us two separate Contracts viz ‘First Contract’ for ex-works supply of all equipment and materials including mandatory spares and ‘Second Contract’ for providing all the services i.e. inland transportation for delivery at site, In-transit insurance, unloading, handling at site, installation, testing and commissioning including Trial operation in respect of all the equipment supplied under the ‘First Contract’ and other services specified in the Contract Documents. We declare that the award of two contracts, will not, in any way, dilute our responsibility for successful operation of plant/equipment and fulfillment of all obligations as per Bidding Documents and that both the Contracts will have a cross-fall breach clause i.e. a breach in one Contract will automatically be classified as a breach of the other contract which will confer on you the right to terminate the other contract at our risk and cost.
6.0 We have read the provisions of following clauses and confirm that the specified stipulations of these clauses are acceptable to us:
(a) ITB 13 Bid Security
(b) GCC 2.14 Governing Law
(c) GCC 5.1 Contractor’s Responsibilities
(d) GCC 8 Terms of Payment
(e) GCC 9.3 Performance Security
(f) GCC 10 Taxes and Duties
(g) GCC 21.2 Completion Time Guarantee
(h) GCC 22 Defect Liability
(i) GCC 23 Functional Guarantee
(j) GCC 25 Patent Indemnity
(k) GCC 26 Limitation of Liability
(l) GCC 38 Settlement of Disputes
(m) GCC 39 Arbitration
(n) Appendix 2 to Form of Contract Agreement Price Adjustment
Further we understand that deviation taken in any of the above clauses by us shall make our bid non-responsive as per provision of bidding documents and rejected by you.
7.0 We undertake, if our bid is accepted, to commence the work on Facilities immediately upon your Notification of Award to us, and to achieve Completion within the time stated in the Bidding Documents.
8.0 If our bid is accepted, we undertake to provide an Advance Payment Security and Performance Security(ies) in the form and amounts, and within the times specified in the Bidding Documents.
9.0 We agree to abide by this bid for a period of Six (06) months from the date fixed for submission of bids as stipulated in the Bidding Documents, and it shall remain binding upon us and may be accepted by you at any time before the expiration of that period.
10.0 Until a formal Contract is prepared and executed between us, this bid, together with your written acceptance thereof in the form of your Notification of Award shall constitute a binding contract between us.
11.0 We understand that you are not bound to accept the lowest or any bid you may receive.
*12.0 (for Joint Venture only) We, the partners of Joint Venture submitting this bid, do agree and confirm that in case of Award of Contract on the Joint Venture, we shall be jointly and severally liable and responsible for the execution of the Contract in accordance with Contract terms and conditions. 1
13.0 We are a Micro and Small Enterprise (MSE) registered with , a designated Authority of GoI under the Public Procurement Policy for MSEs order 2012. 0 2 2
13.0 We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
Thanking you, we remain
Yours faithfully,
For and on behalf of : 0
Date : 00 January 1900 Printed Name: 0
Place : 00-Jan-00 Designation : 0
Please provide additional information of the Bidder
Business Address :
Country of Incorporation :
(State/Province to be indicated)
Name of Principal Officer :
Address of Principal Officer :
USD One Lac Fifty Five Thousand Eight Hundred Eighty Five Only EURO Four Thousand Nine Hundred Sixty Only RMB Ten Thousand Three Hundred Fifty Two Only INR Six Lac Ninety One Thousand Six Hundred Forty Seven Only USD 155885/- + EURO 4960/- + RMB 10352/- + INR 691647/-
USD One Lac Fifty Five Thousand Eight Hundred Eighty Five Only plus EURO Four Thousand Nine Hundred Sixty Only plus RMB Ten Thousand Three Hundred Fifty Two Only plus INR Six Lac Ninety One Thousand Six Hundred Forty Seven Only
85 Eighty Five 60 Sixty 52 Fifty Two 47 Forty Seven
8 Eight Hundred 9 Nine Hundred 3 Three Hundred 6 Six Hundred
55 Fifty Five Thousand 4 Four Thousand 10 Ten Thousand 91 Ninety One Thousand 0 0 0 0 0 plus
1 One Lac 0 0 6 Six Lac 0 0 0 0 1
1 One 1 One 1 One 1 One 0 0 1 0 1
2 Two 2 Two 2 Two 2 Two 0 0 1 1 0
3 Three 3 Three 3 Three 3 Three 0 0 1 1 1
4 Four 4 Four 4 Four 4 Four 0 1 0 0 0
5 Five 5 Five 5 Five 5 Five 0 1 0 0 1
6 Six 6 Six 6 Six 6 Six 0 1 0 1 0
7 Seven 7 Seven 7 Seven 7 Seven 0 1 0 1 1
8 Eight 8 Eight 8 Eight 8 Eight 0 1 1 0 0
9 Nine 9 Nine 9 Nine 9 Nine 0 1 1 0 1
10 Ten 10 Ten 10 Ten 10 Ten 0 1 1 1 0
11 Eleven 11 Eleven 11 Eleven 11 Eleven 1 1 1 1 1 USD One Lac Fifty Five Thousand Eight Hundred Eighty Five Only plus EURO Four Thousand Nine Hundred Sixty Only plus RMB Ten Thousand Three Hundred Fifty Two Only plus INR Six Lac Ninety One Thousand Six Hundred Forty Seven Only
12 Twelve 12 Twelve 12 Twelve 12 Twelve
13 Thirteen 13 Thirteen 13 Thirteen 13 Thirteen
14 Fourteen 14 Fourteen 14 Fourteen 14 Fourteen
15 Fifteen 15 Fifteen 15 Fifteen 15 Fifteen
16 Sixteen 16 Sixteen 16 Sixteen 16 Sixteen 0 0 0 0 0 +
17 Seventeen 17 Seventeen 17 Seventeen 17 Seventeen 0 0 0 0 1 /- +
18 Eighteen 18 Eighteen 18 Eighteen 18 Eighteen 0 0 0 1 0 /-
19 Nineteen 19 Nineteen 19 Nineteen 19 Nineteen 0 0 0 1 1
20 Twenty 20 Twenty 20 Twenty 20 Twenty 0 0 1 0 0
21 Twenty One 21 Twenty One 21 Twenty One 21 Twenty One 0 0 1 0 1
22 Twenty Two 22 Twenty Two 22 Twenty Two 22 Twenty Two 0 0 1 1 0
23 Twenty Three 23 Twenty Three 23 Twenty Three 23 Twenty Three 0 0 1 1 1
24 Twenty Four 24 Twenty Four 24 Twenty Four 24 Twenty Four 0 1 0 0 0
25 Twenty Five 25 Twenty Five 25 Twenty Five 25 Twenty Five 0 1 0 0 1
26 Twenty Six 26 Twenty Six 26 Twenty Six 26 Twenty Six 0 1 0 1 0
27 Twenty Seven 27 Twenty Seven 27 Twenty Seven 27 Twenty Seven 0 1 0 1 1
28 Twenty Eight 28 Twenty Eight 28 Twenty Eight 28 Twenty Eight 0 1 1 0 0
29 Twenty Nine 29 Twenty Nine 29 Twenty Nine 29 Twenty Nine 0 1 1 0 1
30 Thirty 30 Thirty 30 Thirty 30 Thirty 0 1 1 1 0
31 Thirty One 31 Thirty One 31 Thirty One 31 Thirty One 1 1 1 1 1 USD 155885/- + EURO 4960/- + RMB 10352/- + INR 691647/-
32 Thirty Two 32 Thirty Two 32 Thirty Two 32 Thirty Two
33 Thirty Three 33 Thirty Three 33 Thirty Three 33 Thirty Three
34 Thirty Four 34 Thirty Four 34 Thirty Four 34 Thirty Four
35 Thirty Fivr 35 Thirty Fivr 35 Thirty Fivr 35 Thirty Fivr
36 Thirty Six 36 Thirty Six 36 Thirty Six 36 Thirty Six
37 Thirty Seven 37 Thirty Seven 37 Thirty Seven 37 Thirty Seven
38 Thirty Eight 38 Thirty Eight 38 Thirty Eight 38 Thirty Eight
39 Thirty Nine 39 Thirty Nine 39 Thirty Nine 39 Thirty Nine
40 Forty 40 Forty 40 Forty 40 Forty
41 Forty One 41 Forty One 41 Forty One 41 Forty One
42 Forty Two 42 Forty Two 42 Forty Two 42 Forty Two
43 Forty Three 43 Forty Three 43 Forty Three 43 Forty Three
44 Forty Four 44 Forty Four 44 Forty Four 44 Forty Four
45 Forty Five 45 Forty Five 45 Forty Five 45 Forty Five
46 Forty Six 46 Forty Six 46 Forty Six 46 Forty Six
47 Forty Seven 47 Forty Seven 47 Forty Seven 47 Forty Seven
48 Forty Eight 48 Forty Eight 48 Forty Eight 48 Forty Eight
49 Forty Nine 49 Forty Nine 49 Forty Nine 49 Forty Nine
50 Fifty 50 Fifty 50 Fifty 50 Fifty
51 Fifty One 51 Fifty One 51 Fifty One 51 Fifty One
52 Fifty Two 52 Fifty Two 52 Fifty Two 52 Fifty Two
53 Fifty Three 53 Fifty Three 53 Fifty Three 53 Fifty Three
54 Fifty Four 54 Fifty Four 54 Fifty Four 54 Fifty Four
55 Fifty Five 55 Fifty Five 55 Fifty Five 55 Fifty Five
56 Fifty Six 56 Fifty Six 56 Fifty Six 56 Fifty Six
57 Fifty Seven 57 Fifty Seven 57 Fifty Seven 57 Fifty Seven
58 Fifty Eight 58 Fifty Eight 58 Fifty Eight 58 Fifty Eight
59 Fifty Nine 59 Fifty Nine 59 Fifty Nine 59 Fifty Nine
60 Sixty 60 Sixty 60 Sixty 60 Sixty
61 Sixty One 61 Sixty One 61 Sixty One 61 Sixty One
62 Sixty Two 62 Sixty Two 62 Sixty Two 62 Sixty Two
63 Sixty Three 63 Sixty Three 63 Sixty Three 63 Sixty Three
64 Sixty Four 64 Sixty Four 64 Sixty Four 64 Sixty Four
65 Sixty Five 65 Sixty Five 65 Sixty Five 65 Sixty Five
66 Sixty Six 66 Sixty Six 66 Sixty Six 66 Sixty Six
67 Sixty Seven 67 Sixty Seven 67 Sixty Seven 67 Sixty Seven
68 Sixty Eight 68 Sixty Eight 68 Sixty Eight 68 Sixty Eight
69 Sixty Nine 69 Sixty Nine 69 Sixty Nine 69 Sixty Nine
70 Seventy 70 Seventy 70 Seventy 70 Seventy
71 Seventy One 71 Seventy One 71 Seventy One 71 Seventy One
72 Seventy Two 72 Seventy Two 72 Seventy Two 72 Seventy Two
73 Seventy Three 73 Seventy Three 73 Seventy Three 73 Seventy Three
74 Seventy Four 74 Seventy Four 74 Seventy Four 74 Seventy Four
75 Seventy Five 75 Seventy Five 75 Seventy Five 75 Seventy Five
76 Seventy Six 76 Seventy Six 76 Seventy Six 76 Seventy Six
77 Seventy Seven 77 Seventy Seven 77 Seventy Seven 77 Seventy Seven
78 Seventy Eight 78 Seventy Eight 78 Seventy Eight 78 Seventy Eight
79 Seventy Nine 79 Seventy Nine 79 Seventy Nine 79 Seventy Nine
80 Eighty 80 Eighty 80 Eighty 80 Eighty
81 Eighty One 81 Eighty One 81 Eighty One 81 Eighty One
82 Eighty Two 82 Eighty Two 82 Eighty Two 82 Eighty Two
83 Eighty Three 83 Eighty Three 83 Eighty Three 83 Eighty Three
84 Eighty Four 84 Eighty Four 84 Eighty Four 84 Eighty Four
85 Eighty Five 85 Eighty Five 85 Eighty Five 85 Eighty Five
86 Eighty Six 86 Eighty Six 86 Eighty Six 86 Eighty Six
87 Eighty Seven 87 Eighty Seven 87 Eighty Seven 87 Eighty Seven
88 Eighty Eight 88 Eighty Eight 88 Eighty Eight 88 Eighty Eight
89 Eighty Nine 89 Eighty Nine 89 Eighty Nine 89 Eighty Nine
90 Ninety 90 Ninety 90 Ninety 90 Ninety
91 Ninety One 91 Ninety One 91 Ninety One 91 Ninety One
92 Ninety Two 92 Ninety Two 92 Ninety Two 92 Ninety Two
93 Ninety Three 93 Ninety Three 93 Ninety Three 93 Ninety Three
94 Ninety Four 94 Ninety Four 94 Ninety Four 94 Ninety Four
95 Ninety Five 95 Ninety Five 95 Ninety Five 95 Ninety Five
96 Ninety Six 96 Ninety Six 96 Ninety Six 96 Ninety Six
97 Ninety Seven 97 Ninety Seven 97 Ninety Seven 97 Ninety Seven
98 Ninety Eight 98 Ninety Eight 98 Ninety Eight 98 Ninety Eight
99 Ninety Nine 99 Ninety Nine 99 Ninety Nine 99 Ninety Nine
100 One Hundred 100 One Hundred 100 One Hundred 100 One Hundred
23 Twenty Three
27 Twenty Seven
28 Twenty Eight
33 Thirty Three
37 Thirty Seven
38 Thirty Eight
73 Seventy Three
74 Seventy Four
75 Seventy Five
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
83 Eighty Three
87 Eighty Seven
88 Eighty Eight
93 Ninety Three
97 Ninety Seven
98 Ninety Eight
100 One Hundred
USD One Lac Fifty Five Thousand Eight Hundred Eighty Five Only EURO Four Thousand Nine Hundred Sixty Only RMB Ten Thousand Three Hundred Fifty Two Only INR Six Lac Ninety One Thousand Six Hundred Forty Seven Only USD 155885/- + EURO 4960/- + RMB 10352/- + INR 691647/-
USD One Lac Fifty Five Thousand Eight Hundred Eighty Five Only plus EURO Four Thousand Nine Hundred Sixty Only plus RMB Ten Thousand Three Hundred Fifty Two Only plus INR Six Lac Ninety One Thousand Six Hundred Forty Seven Only
85 Eighty Five 60 Sixty 52 Fifty Two 47 Forty Seven
8 Eight Hundred 9 Nine Hundred 3 Three Hundred 6 Six Hundred
55 Fifty Five Thousand 4 Four Thousand 10 Ten Thousand 91 Ninety One Thousand 0 0 0 0 0 plus
1 One Lac 0 0 6 Six Lac 0 0 0 0 1
1 One 1 One 1 One 1 One 0 0 1 0 1
2 Two 2 Two 2 Two 2 Two 0 0 1 1 0
3 Three 3 Three 3 Three 3 Three 0 0 1 1 1
4 Four 4 Four 4 Four 4 Four 0 1 0 0 0
5 Five 5 Five 5 Five 5 Five 0 1 0 0 1
6 Six 6 Six 6 Six 6 Six 0 1 0 1 0
7 Seven 7 Seven 7 Seven 7 Seven 0 1 0 1 1
8 Eight 8 Eight 8 Eight 8 Eight 0 1 1 0 0
9 Nine 9 Nine 9 Nine 9 Nine 0 1 1 0 1
10 Ten 10 Ten 10 Ten 10 Ten 0 1 1 1 0
11 Eleven 11 Eleven 11 Eleven 11 Eleven 1 1 1 1 1 USD One Lac Fifty Five Thousand Eight Hundred Eighty Five Only plus EURO Four Thousand Nine Hundred Sixty Only plus RMB Ten Thousand Three Hundred Fifty Two Only plus INR Six Lac Ninety One Thousand Six Hundred Forty Seven Only
12 Twelve 12 Twelve 12 Twelve 12 Twelve
13 Thirteen 13 Thirteen 13 Thirteen 13 Thirteen
14 Fourteen 14 Fourteen 14 Fourteen 14 Fourteen
15 Fifteen 15 Fifteen 15 Fifteen 15 Fifteen
16 Sixteen 16 Sixteen 16 Sixteen 16 Sixteen 0 0 0 0 0 +
17 Seventeen 17 Seventeen 17 Seventeen 17 Seventeen 0 0 0 0 1 /- +
18 Eighteen 18 Eighteen 18 Eighteen 18 Eighteen 0 0 0 1 0 /-
19 Nineteen 19 Nineteen 19 Nineteen 19 Nineteen 0 0 0 1 1
20 Twenty 20 Twenty 20 Twenty 20 Twenty 0 0 1 0 0
21 Twenty One 21 Twenty One 21 Twenty One 21 Twenty One 0 0 1 0 1
22 Twenty Two 22 Twenty Two 22 Twenty Two 22 Twenty Two 0 0 1 1 0
23 Twenty Three 23 Twenty Three 23 Twenty Three 23 Twenty Three 0 0 1 1 1
24 Twenty Four 24 Twenty Four 24 Twenty Four 24 Twenty Four 0 1 0 0 0
25 Twenty Five 25 Twenty Five 25 Twenty Five 25 Twenty Five 0 1 0 0 1
26 Twenty Six 26 Twenty Six 26 Twenty Six 26 Twenty Six 0 1 0 1 0
27 Twenty Seven 27 Twenty Seven 27 Twenty Seven 27 Twenty Seven 0 1 0 1 1
28 Twenty Eight 28 Twenty Eight 28 Twenty Eight 28 Twenty Eight 0 1 1 0 0
29 Twenty Nine 29 Twenty Nine 29 Twenty Nine 29 Twenty Nine 0 1 1 0 1
30 Thirty 30 Thirty 30 Thirty 30 Thirty 0 1 1 1 0
31 Thirty One 31 Thirty One 31 Thirty One 31 Thirty One 1 1 1 1 1 USD 155885/- + EURO 4960/- + RMB 10352/- + INR 691647/-
32 Thirty Two 32 Thirty Two 32 Thirty Two 32 Thirty Two
33 Thirty Three 33 Thirty Three 33 Thirty Three 33 Thirty Three
34 Thirty Four 34 Thirty Four 34 Thirty Four 34 Thirty Four
35 Thirty Fivr 35 Thirty Fivr 35 Thirty Fivr 35 Thirty Fivr
36 Thirty Six 36 Thirty Six 36 Thirty Six 36 Thirty Six
37 Thirty Seven 37 Thirty Seven 37 Thirty Seven 37 Thirty Seven
38 Thirty Eight 38 Thirty Eight 38 Thirty Eight 38 Thirty Eight
39 Thirty Nine 39 Thirty Nine 39 Thirty Nine 39 Thirty Nine
40 Forty 40 Forty 40 Forty 40 Forty
41 Forty One 41 Forty One 41 Forty One 41 Forty One
42 Forty Two 42 Forty Two 42 Forty Two 42 Forty Two
43 Forty Three 43 Forty Three 43 Forty Three 43 Forty Three
44 Forty Four 44 Forty Four 44 Forty Four 44 Forty Four
45 Forty Five 45 Forty Five 45 Forty Five 45 Forty Five
46 Forty Six 46 Forty Six 46 Forty Six 46 Forty Six
47 Forty Seven 47 Forty Seven 47 Forty Seven 47 Forty Seven
48 Forty Eight 48 Forty Eight 48 Forty Eight 48 Forty Eight
49 Forty Nine 49 Forty Nine 49 Forty Nine 49 Forty Nine
50 Fifty 50 Fifty 50 Fifty 50 Fifty
51 Fifty One 51 Fifty One 51 Fifty One 51 Fifty One
52 Fifty Two 52 Fifty Two 52 Fifty Two 52 Fifty Two
53 Fifty Three 53 Fifty Three 53 Fifty Three 53 Fifty Three
54 Fifty Four 54 Fifty Four 54 Fifty Four 54 Fifty Four
55 Fifty Five 55 Fifty Five 55 Fifty Five 55 Fifty Five
56 Fifty Six 56 Fifty Six 56 Fifty Six 56 Fifty Six
57 Fifty Seven 57 Fifty Seven 57 Fifty Seven 57 Fifty Seven
58 Fifty Eight 58 Fifty Eight 58 Fifty Eight 58 Fifty Eight
59 Fifty Nine 59 Fifty Nine 59 Fifty Nine 59 Fifty Nine
60 Sixty 60 Sixty 60 Sixty 60 Sixty
61 Sixty One 61 Sixty One 61 Sixty One 61 Sixty One
62 Sixty Two 62 Sixty Two 62 Sixty Two 62 Sixty Two
63 Sixty Three 63 Sixty Three 63 Sixty Three 63 Sixty Three
64 Sixty Four 64 Sixty Four 64 Sixty Four 64 Sixty Four
65 Sixty Five 65 Sixty Five 65 Sixty Five 65 Sixty Five
66 Sixty Six 66 Sixty Six 66 Sixty Six 66 Sixty Six
67 Sixty Seven 67 Sixty Seven 67 Sixty Seven 67 Sixty Seven
68 Sixty Eight 68 Sixty Eight 68 Sixty Eight 68 Sixty Eight
69 Sixty Nine 69 Sixty Nine 69 Sixty Nine 69 Sixty Nine
70 Seventy 70 Seventy 70 Seventy 70 Seventy
71 Seventy One 71 Seventy One 71 Seventy One 71 Seventy One
72 Seventy Two 72 Seventy Two 72 Seventy Two 72 Seventy Two
73 Seventy Three 73 Seventy Three 73 Seventy Three 73 Seventy Three
74 Seventy Four 74 Seventy Four 74 Seventy Four 74 Seventy Four
75 Seventy Five 75 Seventy Five 75 Seventy Five 75 Seventy Five
76 Seventy Six 76 Seventy Six 76 Seventy Six 76 Seventy Six
77 Seventy Seven 77 Seventy Seven 77 Seventy Seven 77 Seventy Seven
78 Seventy Eight 78 Seventy Eight 78 Seventy Eight 78 Seventy Eight
79 Seventy Nine 79 Seventy Nine 79 Seventy Nine 79 Seventy Nine
80 Eighty 80 Eighty 80 Eighty 80 Eighty
81 Eighty One 81 Eighty One 81 Eighty One 81 Eighty One
82 Eighty Two 82 Eighty Two 82 Eighty Two 82 Eighty Two
83 Eighty Three 83 Eighty Three 83 Eighty Three 83 Eighty Three
84 Eighty Four 84 Eighty Four 84 Eighty Four 84 Eighty Four
85 Eighty Five 85 Eighty Five 85 Eighty Five 85 Eighty Five
86 Eighty Six 86 Eighty Six 86 Eighty Six 86 Eighty Six
87 Eighty Seven 87 Eighty Seven 87 Eighty Seven 87 Eighty Seven
88 Eighty Eight 88 Eighty Eight 88 Eighty Eight 88 Eighty Eight
89 Eighty Nine 89 Eighty Nine 89 Eighty Nine 89 Eighty Nine
90 Ninety 90 Ninety 90 Ninety 90 Ninety
91 Ninety One 91 Ninety One 91 Ninety One 91 Ninety One
92 Ninety Two 92 Ninety Two 92 Ninety Two 92 Ninety Two
93 Ninety Three 93 Ninety Three 93 Ninety Three 93 Ninety Three
94 Ninety Four 94 Ninety Four 94 Ninety Four 94 Ninety Four
95 Ninety Five 95 Ninety Five 95 Ninety Five 95 Ninety Five
96 Ninety Six 96 Ninety Six 96 Ninety Six 96 Ninety Six
97 Ninety Seven 97 Ninety Seven 97 Ninety Seven 97 Ninety Seven
98 Ninety Eight 98 Ninety Eight 98 Ninety Eight 98 Ninety Eight
99 Ninety Nine 99 Ninety Nine 99 Ninety Nine 99 Ninety Nine
100 One Hundred 100 One Hundred 100 One Hundred 100 One Hundred
23 Twenty Three
27 Twenty Seven
28 Twenty Eight
33 Thirty Three
37 Thirty Seven
38 Thirty Eight
73 Seventy Three
74 Seventy Four
75 Seventy Five
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
83 Eighty Three
87 Eighty Seven
88 Eighty Eight
93 Ninety Three
97 Ninety Seven
98 Ninety Eight
100 One Hundred
Package Name Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
Package Code Services
Package ref. SRTS-II/C&M/WC-4880/2026/
Spec.no. SR2/T/S-CONS/DOM/C00/26/09081
SRTS-II/C&M/WC-4880/2026/
1 Fill up only green shaded cells in Sch-1 and Bid Form 2nd Envelope.
2 All the cells in Sch-5 & Sch-6 are auto filled, therefore no cell is required to be filled up there.
3 Instructions / error messages, if any, will be displayed automatically after selecting the cell.
4 After filling up all the schedues, save the file, take print out of all the schedules and Bid form and sign & stamp and submit them as hard copy of the 2nd envelope (Price part) of the bid. Also ensure to submit the soft copy of the the same file on CD/ DVD.
I While filling up the worksheets following may please be observed :
(i) Fill up only green shaded cells.
(ii) Certain data type entries have been restricted, such as Numeric values or limits of numeric values.
(iii) Select only the options provided in pull down menus.
(iv) Do not link any cell of this work book with any other work book.
(v) Do not use copy & paste or cut & paste options for filling up the data.
(vi) Do not reformat any of the cell of the work book.
II This Workbook consists of following worksheets :
Opening page of the workbook.
Names of Bidder :
● Select Bidder from the pull down menu. Do not leave this cell blank.
● Select nos. of the JV Partners other than the Lead Partner from drop down menu.
● In case of JV partners more than 2, enter details of 3rd & more partners along with details of 2nd partner.
● Fill up names and address of the Bidder and /or Joint Venture.
● Fill up date in dd-mmm-yyyy format from drop down menu.
● Click for Sch-1 given at the right top of the worksheet to go to Sch-1.
Sch-1 (Ex-works Prices) :
● Fill up unit rates for all the items in numeric values greater than 0 (zero). If unit rate is left blank, the corresponding item shall be deemed to be included in the total price.
● Corresponding cell for mode of transaction shall be come enable only after filling up the unit rate, therefore first fill up the unit rate and then mode of transaction for the corresponding item.
● Total amount shall get calculated automatically.
● Type Test charges shall appear automatically after filling up Sch-7 appropriately.
Sch-2 (Freight & Insurance Charges) :
● Fill up unit rates for all the items in numeric values greater than 0 (zero). If unit rate is left blank, the corresponding item shall be deemed to be included in the total price.
● Total amount shall get calculated automatically.
Sch-1 (Erection Charges) :
● Fill up unit rates for all the items in numeric values greater than 0 (zero). If unit rate is left blank, the corresponding item shall be deemed to be included in the total price.
● Total amount shall get calculated automatically.
Sch-4 (Training Charges) :
● Not applicable, hence no cell is required to be filled up.
Sch-5 (Summary of Taxes and Duties applicable on the Services) :
● No cell is required to be filled in by the bidder in this worksheet.
● Summary of all the Schedules without considering discount (mentioned in the work sheet discount) shall be displayed automatically.
● No cell is required to be filled in by the bidder in this worksheet.
Sch-7 (Type Test Charges) :
● Fill up the rates & location where type tests are proposed.
● Total of this Sch-7 shall automatically appear in Sch-1.
Bid from 2nd Envelope :
● Fill up ref. no. as bidder's ref no. of this letter.
● This letter shall consider the net price as per Sch-6 (After Discount).
● Fill up names & Designation of the representatives of other JV partner(s) if the bidder is JV (Joint Venture) .
● Fill up additional information as required.
Happy Bidding !
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
SRTS-II/C&M/WC-4880/2026/ Sole Bidder
Enter following details of the bidder
Specify type of Bidder [Select from drop down menu] Sole Bidder 1
Name of Sole Bidder
Address of Sole Bidder
email ID of Bid Signatory
Mobile No. of Bid Signatory
Tel No. of Bid Signatory
Fax No. of Bid Signatory
SRTS-II/C&M/WC-4880/2026/ Schedule - 1
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
(SCHEDULE OF RATES AND PRICES)
Bidder’s Name and Address (Sole Bidder) : To:
Sr.General Manager,
Name : Power Grid Corporation of India Ltd.,
Address : SR-II,RHQ
Singanayakanahalli,Yelahanka
Bangalore -560064
Plant and Equipment (including Mandatory Spares Parts) to be supplied, including Type Test Charges for Tests to be conducted
All Prices are in Indian Rupees.
SI. No. HSN Code Whether HSN in column ‘ 2’ is confirmed. If not indicate applicable the HSN code * Rate of GST applicable ( in %) Whether rate of GST in column ‘ 4 ’ is confirmed. If not indicate applicable rate of GST * Item Description Unit Qty. Unit Ex-works price (excluding GST) Total Ex-works price (excluding GST) GST TAX as confirmed by Bidder
I Services Revaluation of J column Tax Calculation
Part A - Indoor components of LT System
1 222222 18% confirmed 415V AC Main Switch Board as per the TS enclosed. Set 1 Included 0.00 0 0.00
2 2 18% 415V ACDB- I as per the TS enlosed. Set 1 Included 0.00 0 0.00
3 2 18% 415V ACDB- II as per the TS enclosed Set 1 Included 0.00 0 0.00
4 2 18% 415V AC Main Lighting Distribution Board including two nos 100KVA rated lighting transformers as per the TS enclosed Set 1 Included 0.00 0 0.00
5 2 18% 415V AC Emergency Lighting Distribution Board including one no 100KVA rated lighting transformers. Set 1 Included 0.00 0 0.00
6 2 18% 415V AC Emergency Diesel Switchgear Set 1 Included 0.00 0 0.00
7 2 18% 415V ACDB for colony lighting Set 2 Included 0.00 0 0.00
8 2 18% 415V Air conditioning DB Set 1 Included 0.00 0 0.00
9 2 18% 48V DCDB Nos 2 Included 0.00 0 0.00
10 2 18% 220V DCDB Nos 2 Included 0.00 0 0.00
11 2 18% Mandatory Spares as per the BOM in Vol-II Lot 1 Included 0.00 0 0.00
Part B - Out door components of LT system 0 0.00
1 1 18% 630KVA, 22kV/433V, DYn1 LT transformer Nos 2 Included 0.00 0 0.00
2 1 18% 33kV, 200A, Horn Gap fuse(1Ph) as per the TS enclosed. Nos. 6 Included 0.00 0 0.00
3 1 18% 33KV, 630A, 3Ph, 25KA/3sec, manual operated HDB electrically ganged Isolator without earth switch as per the TS enclosed. Nos. 2 Included 0.00 0 0.00
4 1 18% 22KV/433V Potential transformer (1Ph) as per the TS enclosed. Nos. 6 Included 0.00 0 0.00
5 1 18% 18KV, 10KA , Class-III Surge arrestors as per TS enclosed. Nos. 6 Included 0.00 0 0.00
6 1 18% 33KV Post insulators Nos. 24 Included 0.00 0 0.00
7 1 18% H-Pole structure for 22KV sytem as per the indicative drawing enclosed, Set 2 Included 0.00 0 0.00
8 1 18% Conductor, Clamps,Connector including equipment connectors earthing materials for 22KV system equipments including LT transformer neutral earthing, risers, Lighting spike, GI flats for earthing the structures, Equipments etc for connection of LT transformer and other 22KV equipments Set 2 Included 0.00 0 0.00
9 1 18% 1CX630Sq.mm AL.XLPE cable along with clamps, Glands and straight Joints Km 1.4 Included 0.00 0 0.00
10 Mandatory spares for LT transformer 0 0.00
a 1 18% All Bushings with metal parts Set 1 Included 0.00 0 0.00
b 1 18% OTI with sensing device Set 1 Included 0.00 0 0.00
c 1 18% Set of valves (o1 no. each type) Set 1 Included 0.00 0 0.00
d 1 18% Silica Gel container Set 1 Included 0.00 0 0.00
e 1 18% Bucholz relay Set 1 Included 0.00 0 0.00
11 1 18% Mandatory spares for 22KV equipments as per the BOM attached Lot 1 Included 0.00 0 0.00
Total Ex-Works Price Excluding GST 0.00 Total Tax
Total Type Test charges as per Schedule-7 0.00
Total Ex-works Price including Type Test charges 0.00
Total GST Tax as confirmed by Bidder 0.00
Note : Specify amount of GST on the transaction between the Contractor and the Employer.
* In case the bidder leaves the cell for confirmation of the HSN code and/or GST rate “blank”, the HSN code and corresponding GST rate indicated by the Employer shall be deemed to be the one confirmed by the Bidder.
Place : Printed Name :
SRTS-II/C&M/WC-4880/2026/ Schedule - 1 Direct Total 0 Sole Bidder `
BO Total #REF! 0
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
(SCHEDULE OF RATES AND PRICES : EX-WORKS PRICES)
Bidder’s Name and Address (Sole Bidder) : To:
Contract Services
Name : Power Grid Corporation of India Ltd., #REF!
Address : "Saudamini", Plot No.-2
Gurgaon (Haryana) - 122001
Plant and Equipment (including Mandatory Spares Parts) to be supplied, including Type Test Charges for Tests to be conducted. Direct
All Prices are in Indian Rupees. Bought-Out
SI. No. Item Description Unit Qty. Unit Ex-works price Total Ex-works price Mode of Transaction (Direct / Bought-out)
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
Total Ex-Works Price Direct 0.00 Direct
Total Ex-Works Price Bought Out 0.00
Total Ex-Works Price 0.00
Total Type Test charges as per Schedule-7 #REF! #REF! #REF!
Total Ex-works Price including Type Test charges #REF! #REF! #REF!
Discount Sch-1 #REF! MPD Sch-1 #REF!
Dis Alert #REF!
Note : Specify amount of Excise Duty, Sales Tax/'VAT and other taxes payable on the transaction between the Contractor and the Employer and octroi/entry tax as applicable for destination site/state on all items of supply including bought-out finished items (to be identified in the Contract), which shall be dispatched directly from the sub-vendor’s works to the Employer’s site (sale-in-transit), separately in Schedule-5. Excise Duty, Sales tax and other levies for all the bought-out items are to be included in the EXW Price (Col. No. 5) only and not to be indicated in Schedule-5.
Place : Printed Name :
SRTS-II/C&M/WC-4880/2026/ Schedule - 2
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
(SCHEDULE OF RATES AND PRICES)
Bidder’s Name and Address (Sole Bidder) : To:
Name : Power Grid Corporation of India Ltd.,
Address : SR-II,RHQ
Singanayakanahalli,Yelahanka
Bangalore -560064
Local Transportation, Insurance and other Incidental Services
All Prices are in Indian Rupees.
SI. No. HSN Code Whether HSN in column ‘2’ is confirmed. If not indicate applicable the HSN code * Rate of GST applicable ( in %) Whether rate of GST in column ‘4’ is confirmed. If not indicate applicable rate of GST * Description Unit Quantity Unit Freight, Insurance, loading & unloading Charges Total Freight, Insurance, loading & unloading Charges
Part A - Indoor components of LT System
1 415V AC Main Switch Board as per the TS enclosed. Set 1 Included
2 415V ACDB- I as per the TS enlosed. Set 1 Included
3 415V ACDB- II as per the TS enclosed Set 1 Included
4 415V AC Main Lighting Distribution Board including two nos 100KVA rated lighting transformers as per the TS enclosed Set 1 Included
5 415V AC Emergency Lighting Distribution Board including one no 100KVA rated lighting transformers. Set 1 Included
6 415V AC Emergency Diesel Switchgear Set 1 Included
7 415V ACDB for colony lighting Set 2 Included
8 415V Air conditioning DB Set 1 Included
9 48V DCDB Nos 2 Included
10 220V DCDB Nos 2 Included
11 Mandatory Spares as per the BOM in Vol-II Lot 1 Included
Part B - Out door components of LT system
1 630KVA, 22kV/433V, DYn1 LT transformer Nos 2 Included
2 33kV, 200A, Horn Gap fuse(1Ph) as per the TS enclosed. Nos. 6 Included
3 33KV, 630A, 3Ph, 25KA/3sec, manual operated HDB electrically ganged Isolator without earth switch as per the TS enclosed. Nos. 2 Included
4 22KV/433V Potential transformer (1Ph) as per the TS enclosed. Nos. 6 Included
5 18KV, 10KA , Class-III Surge arrestors as per TS enclosed. Nos. 6 Included
6 33KV Post insulators Nos. 24 Included
7 H-Pole structure for 22KV sytem as per the indicative drawing enclosed, Set 2 Included
8 Conductor, Clamps,Connector including equipment connectors earthing materials for 22KV system equipments including LT transformer neutral earthing, risers, Lighting spike, GI flats for earthing the structures, Equipments etc for connection of LT transformer and other 22KV equipments Set 2 Included
9 1CX630Sq.mm AL.XLPE cable along with clamps, Glands and straight Joints Km 1.4 Included
10 Mandatory spares for LT transformer
a All Bushings with metal parts Set 1 Included
b OTI with sensing device Set 1 Included
c Set of valves (o1 no. each type) Set 1 Included
d Silica Gel container Set 1 Included
e Bucholz relay Set 1 Included
11 Mandatory spares for 22KV equipments as per the BOM attached Lot 1 Included
Total F&I Price 0.00
Place : Printed Name :
SRTS-II/C&M/WC-4880/2026/ Schedule - 2 Dis
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL) As per Lum-sum 0
(SCHEDULE OF RATES AND PRICES : FREIGHT & INSURANCE CHARGES) AS per Percent #REF!
As per lum-sum on Sch-2 0.00%
Bidder’s Name and Address (Sole Bidder) : To: As per Percent on Sch-2 #REF!
C&M Department Total Discount #REF!
Name : Power Grid Corporation of India Ltd.,
Address : SR-II,RHQ
Singanayakanahalli,Yelahanka Multipackage Discount #REF!
Bangalore -560064
All Prices are in Indian Rupees. Amount after Discount (Rs.) Dis Alert Amount after MPD (Rs.)
SI. No. Description Unit Quantity Unit Freight & Insurance Charges Total Freight & Insurance Charges Unit Freight & Insurance Charges Total Freight & Insurance Charges Unit Freight & Insurance Charges Total Freight & Insurance Charges
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
Total F&I Price #REF!
Place : Printed Name :
SRTS-II/C&M/WC-4880/2026/ Schedule - 1
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL) As per Lum-sum 0.00%
(SCHEDULE OF RATES AND PRICES ) AS per Percent #REF!
As per lum-sum on Sch-3 0.00%
Bidder’s Name and Address (Sole Bidder) : To: As per Percent on Sch-3 #REF!
Sr.General Manager,
C&M Department Total Discount #REF!
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 SR-II,RHQ
Singanayakanahalli,Yelahanka Multipackage lum-sum #REF!
Bangalore -560064
Service Charges : Amount after Discount (Rs.) Dis Alert Amount after MPD (Rs.)
All Prices are in Indian Rupees.
SI. No. SAC (Service Accounting Codes) Whether SAC in column '2’ is confirmed. If not, indicate applicable SAC * Rate of GST applicable ( in %) Whether rate of GST in column ‘ 4 ’ is confirmed. If not indicate applicable rate of GST * Description Unit Quantity Unit Price charges (Rs.) Total Price (Rs.) GST TAX as confirmed by Bidder Unit Erection Charges Total Erection Charges Unit Erection Charges Total Erection Charges
I Gadag-II PS-Koppal-II PS 400KV(Quad Moose) 2nd D/C line (TL-01 package) Revaluation of J column Tax Calculation
1 995428 18% confirmed Supervision services of Checking/implementation of POWERGRID FQP for Foundation Nos 40 Included 0.00 0 0
2 995428 18% confirmed Supervision services of Checking/implementation of POWERGRID FQP for Tower Erection Nos 101 Included 0.00 0 0
3 995428 18% confirmed Supervision services of Checking/implementation of POWERGRID FQP for Stringing work KM 38.55 Included 0.00 0 0
4 995428 18% confirmed Final Checking of line after completion including activity of final testing and pre-commissioning checks of transmission lines KM 38.55 Included 0.00 0 0
GST Amount 0.00
Total incl GST 0.00
In case the bidder leaves the cell for confirmation of the SAC and/or GST rate “blank”, the SAC and corresponding GST rate indicated by the Employer shall be deemed to be the one confirmed by the Bidder.
Place : Printed Name :
SRTS-II/C&M/WC-4880/2026/ Schedule - 3
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL) As per Lum-sum 0.00%
(SCHEDULE OF RATES AND PRICES : ERECTION CHARGES) AS per Percent #REF!
As per lum-sum on Sch-3 0.00%
Bidder’s Name and Address (Sole Bidder) : To: As per Percent on Sch-3 #REF!
C&M Department Total Discount #REF!
Name : Power Grid Corporation of India Ltd.,
Address : SR-II,RHQ
Singanayakanahalli,Yelahanka Multipackage lum-sum #REF!
Bangalore -560064
All Prices are in Indian Rupees. Amount after Discount (Rs.) Dis Alert Amount after MPD (Rs.)
SI. No. Description Unit Quantity Unit Erection Charges Total Erection Charges Unit Erection Charges Total Erection Charges Unit Erection Charges Total Erection Charges
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! (a) Detailed Soil Investigation
#REF! #REF! #REF! #REF! #REF! (b) All kinds of soil except fissured rock & hard rock
#REF! #REF! #REF! #REF! #REF! (e) River Crossing Location
#REF! #REF! #REF! #REF! #REF! (f)
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
Total Erection Price (A+B) #REF!
Place : Printed Name :
SRTS-II/C&M/WC-4880/2026/ Schedule - 4
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
(SCHEDULE OF RATES AND PRICES )
Bidder’s Name and Address (Sole Bidder) : To:
Name : Power Grid Corporation of India Ltd.,
Address : SR-II,RHQ
Singanayakanahalli,Yelahanka
Bangalore -560064
Training Charges for Training to be imparted
TOTAL TRAINING CHARGES 0.00
Date : -- Printed Name :
Place : Designation :
SRTS-II/C&M/WC-4880/2026/ Schedule - 5
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
(SUMMARY OF TAXES & DUTIES APPLICABLE ON PLANT & EQUIPMENT)
Bidder’s Name and Address (Sole Bidder) : To:
Sr.General Manager,
Name : Power Grid Corporation of India Ltd.,
Address : SR-II,RHQ
Singanayakanahalli,Yelahanka
Bangalore -560064
Sl. No. Item Nos. Total Price (INR) After Discount After MPDiscount
1 TOTAL GST ON SERVICES Sales Tax 0.00 Sales Tax 0.00
Total GST (Schedule-1) 0.00 #REF! #REF! #REF! #REF!
GRAND TOTAL [] 0.00 Grand Total after Discount #REF! Grand Total after MPD #REF!
Date : Printed Name :
Place : Designation :
SRTS-II/C&M/WC-4880/2026/ Schedule - 5
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
SUMMARY OF TAXES & DUTIES APPLICABLE ON GOODS
Bidder’s Name and Address (Sole Bidder) : To:
Name : Power Grid Corporation of India Ltd.,
Address : SR-II,RHQ
Singanayakanahalli,Yelahanka
Bangalore -560064
Sl. No. Item Nos. Total Price (INR)
1 TOTAL GST ON GOODS #REF!
Total GST for Supply of Goods (inter-alia including Type Test Charges) between the Contractor and the Employer (identified in Schedule 1') which are not included in the Ex-works price as per the provision of the Bidding Documents, as applicable.
2 TOTAL GST ON SERVICES #REF!
Total GST on Installation Services (Schedule-3) and Training to be imparted in India (Schedule-4)
GRAND TOTAL [1+2] #REF!
Date : --2025 Printed Name :
Place : Designation :
SRTS-II/C&M/WC-4880/2026/ Schedule - 6
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
(GRAND SUMMARY)
Bidder’s Name and Address (Sole Bidder) : To:
Sr.General Manager,
Name : Power Grid Corporation of India Ltd.,
Address : SR-II,RHQ
Singanayakanahalli,Yelahanka
Bangalore -560064
Sl. No. Description Total Price (INR)
1 TOTAL SCHEDULE NO. 1 0.00
Ex-works price of Plant and Equipment
2 TOTAL SCHEDULE NO. 2 0.00
Local Transportation, Insurance and other Incidental Services
1 TOTAL SCHEDULE NO. 1 0.00
Total Installtion/Service Charges
4 TOTAL SCHEDULE NO. 4 0.00
Training Charges
2 TOTAL SCHEDULE NO. 5 0.00
Taxes and Duties(GST)
6 TOTAL SCHEDULE NO. 7 0.00
Type Test Charges [Total of this Schedule is included in Schedule - 1 above.]
GRAND TOTAL [1+2] 0.00
Date : Printed Name :
Place : Designation :
This letter of discount is optional. Bidder may / may not offer any discount.
SRTS-II/C&M/WC-4880/2026/ Letter of Discount
LETTER OF DISCOUNT
Contract Services
Power Grid Corporation of India Ltd.,
"Saudamini", Plot No.-2
Sector-29, (near IFFCO Chowk)
Gurgaon (Haryana) - 122001
Subject : Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
With reference to the subject tender, we hereby offer unconditional discount on the prices quoted by us as per details given here below : Eq Weightage of Rs/ % Final Discount Factor
1 Discount on lum-sum basis on total price quoted by us without Taxes & Duties. [The discount shall be proportionately applicable on all the items of all the Schdules i.e. Sch-1 (without type test charges), Sch-2, Sch-3 & Sch-7] In Rs. #REF! #REF!
2 Discount on percent basis on total price quoted by us without Taxes & Duties. [The discount shall be proportionately applicable on all the items of all the Schdules i.e. Sch-1 (without type test charges), Sch-2 , Sch-3 & Sch-7] In Percent (%) #REF! 0.00%
3 Discount on lum-sum basis on the Schedules as given below : [The discount shall be proportionately applicable on all the relevent items of the respective Schdules.] In Rs.
Schedule-1 : Ex works prices In Rs. 0.00 0.0000000000% Schedule-1 : (Direct Only) #REF!
Schedule-2 : Freight & Insurance In Rs. 0.00 0.0000000000% Schedule-2 : Freight & Insurance #REF!
Schedule-1 : Erection Charges In Rs. #REF! #REF! Schedule-3 : Erection Charges #REF!
Schedule-4 : Training Charges In Rs. 0.00 0.0000000000% Schedule-4 : Training Charges #REF!
Schedule-7 : Type Test Charges In Rs. 0.00 0.0000000000% Schedule-6 : Type Test Charges #REF!
1 Discount on percent basis on the Schedules as given below : [The discount shall be proportionately applicable on all the relevent items of the respective Schdules.] In Percent (%)
Schedule-1 : Ex works prices In Percent (%) 0.00 0.00%
Schedule-2 : Freight & Insurance In Percent (%) 0.00 0.00%
Schedule-1 : Erection Charges In Percent (%) #REF! 0.00%
Schedule-4 : Training Charges In Percent (%) 0.00 0.00%
Schedule-7 : Type Test Charges In Percent (%) 0.00 0.00%
Discount(s) offered at sl. No. 1 will get displayed and accounted for automatically in the respective items of the Schedules.
5 We hereby offer Multi-package discount as given below:
Multi-Package Discount(s) offered at sl. No. 5 will not get automatically accounted for in the respective items of the Schedules. The same shall be worked out saparately for evaluation.
Please consider this letter of discount as the integral part of our price bid.
Thanking you, we remain,
Yours faithfully,
For and on behalf of
Date : --2025 Printed Name :
Place : Designation :
SRTS-II/C&M/WC-4880/2026/ Schedule - 6 After Discount
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL)
(GRAND SUMMARY)
Bidder’s Name and Address (Sole Bidder) : To:
Name : Power Grid Corporation of India Ltd.,
Address : SR-II,RHQ
Singanayakanahalli,Yelahanka
Bangalore -560064
Sl. No. Description Total Price (INR)
1 TOTAL SCHEDULE NO. 1 #REF!
Ex-works price of Plant and Equipment
2 TOTAL SCHEDULE NO. 2 #REF!
Local Transportation, Insurance and other Incidental Services
1 TOTAL SCHEDULE NO. 1 #REF!
Total Charges for Site Levelling works
4 TOTAL SCHEDULE NO. 4 #REF!
Training Charges
2 TOTAL SCHEDULE NO. 5 0.00
Taxes and Duties(GST)
6 TOTAL SCHEDULE NO. 7 #REF!
Type Test Charges [Total of this Schedule is included in Schedule - 1 above.]
GRAND TOTAL [1+2] #REF!
Date : --2025 Printed Name :
Place : Designation :
SRTS-II/C&M/WC-4880/2026/ Schedule 7
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL) As per Lum-sum 0.00%
(SCHEDULE OF RATES AND PRICES ) AS per Percent #REF!
As per lum-sum on Sch-7 0.00%
Bidder’s Name and Address (Sole Bidder) : To: As per Percent on Sch-7 #REF!
C&M Department Total Discount #REF!
Name : Power Grid Corporation of India Ltd.,
Address : SR-II,RHQ
Singanayakanahalli,Yelahanka Multipackage Discount #REF!
Bangalore -560064
Type test Charges
SL. NO. Description of Test Unit Quantity Unit Test Charge Total Test Charges (Rs.) #REF! Total Test Charges After Discount (Rs.) Dis Alert Total Test Charges After MPD (Rs.)
TOTAL TYPE TEST CHARGES 0.00
Dis Alert #REF!
Date : --2025 Printed Name :
Place : Designation :
Note : Bidder should indicate the name of test laboratories where type tests are proposed to be conducted
SRTS-II/C&M/WC-4880/2026/
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL) 0 0 0
(SCHEDULE OF RATES AND PRICES ) 0 0 0
Bidder’s Name and Address (Sole Bidder) : 0
SL. NO. Description of Test 0
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
SRTS-II/C&M/WC-4880/2026/
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL) As per Lum-sum 0.00%
(SCHEDULE OF RATES AND PRICES : TYPE TEST CHARGES) AS per Percent #REF!
As per lum-sum on Sch-7 0.00%
Bidder’s Name and Address (Sole Bidder) : To: As per Percent on Sch-7 #REF!
C&M Department Total Discount #REF!
Name : Power Grid Corporation of India Ltd.,
Address : SR-II,RHQ
Singanayakanahalli,Yelahanka Multipackage Discount #REF!
Bangalore -560064
Type Tests on Earthwire
SL. NO. Description of Test Unit Quantity Unit Test Charge Total Test Charges (Rs.) Total Test Charges After Discount (Rs.) Dis Alert Total Test Charges After MPD (Rs.)
(a) #REF! #REF! #REF! #REF! #REF!
(b) #REF! #REF! #REF! #REF! #REF!
Sub-Total (I) #REF!
TOTAL TEST CHARGES (I) #REF!
Discount Sche-7 #REF! MPD Sche-7 #REF!
Dis Alert #REF!
Date : --2025 Printed Name :
Place : Designation :
Note : Bidder should indicate the name of test laboratories where type tests are proposed to be conducted
SRTS-II/C&M/WC-4880/2026/
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL) 0 0 0
(SCHEDULE OF RATES AND PRICES : TYPE TEST CHARGES) 0 0 0
Bidder’s Name and Address (Sole Bidder) : 0
SL. NO. Description of Test 0
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
Details of Octroi
Sl No. Description of Items Amount on which Octroi is applicable Rate of Octroi Octroi
Details of Entry Tax
Sl No. Description of Items Amount on which Entry Tax is applicable Rate of Entry Tax Entry Tax
Details of Other Taxes & Duties
Sl No. Description of Items Amount on which Other Taxes & Duties are applicable Description of Taxes & Duties Rate of Taxes & Duties Amount of Taxes & Duties
SRTS-II/C&M/WC-4880/2026/ Bid Form 2nd Envelope Sole Bidder 1 st 1 January
0 2 nd 2 February
BID FORM (Second Envelope) 3 rd 3 March
Bid Proposal Ref. No. 5 th 5 May
Date : 6 th 0 6 June
To: 8 th January 8 August
Sr.General Manager,
C&M Department 9 th 1900 9 September
Power Grid Corporation of India Ltd., 10 th 10 October
SR-II,RHQ 11 th 11 November
Singanayakanahalli,Yelahanka 12 th 12 December
Bangalore -560064 13 th
Name of Contract : Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL) 15 th
Dear Ladies and/or Gentlemen, 16 th
1.0 In continuation of First Envelope of our Bid, we hereby submit the Second Envelope of the Bid, both of which shall be read together and in conjunction with each other, and shall be construed as an integral part of our Bid. Accordingly, we the undersigned, offer to design, manufacture, test, deliver, install and commission (including carrying out Trial Operation, Performance & Guarantee Test as per provision of Technical Specification) under the above-named package in full conformity with the said Bidding Documents for the sum of Rs. _____________ or such other sums as may be determined in accordance with the terms and conditions of the Bidding Documents. In continuation of First Envelope of our Bid, we hereby submit the Second Envelope of the Bid, both of which shall be read together and in conjunction with each other, and shall be construed as an integral part of our Bid. Accordingly, we the undersigned, offer to design, manufacture, test, deliver, install and commission (including carrying out Trial Operation, Performance & Guarantee Test as per provision of Technical Specification) under the above-named package in full conformity with the said Bidding Documents for the sum of Rs. or such other sums as may be determined in accordance with the terms and conditions of the Bidding Documents. _____________ 17 th
Schedule 1 Plant and Equipment (Including Mandatory Spare Parts) to be supplied. 21 st
Schedule 2 Local Transportation, In-transit Insurance, loading and unloading 22 th
Schedule 1 Installation Charges. Sole Bidder 23 th
Schedule 4 Training charges for training to be imparted. Not applicable 24 th
Schedule 5 Taxes and Duties not included in Schedule 1 25 th
Schedule 6 Grand Summary [Schedule 1to 5] 26 th
Schedule 7 Break-up of Type Test Charges for Type Tests to be conducted-Not applicable 27 th
2.4 We declare that items left blank in the Schedules will be deemed to have been included in other items. The TOTAL for each Schedule and the TOTAL of Grand Summary shall be deemed to be the total price for executing the Facilities and sections thereof in complete accordance with the Contract, whether or not each individual item has been priced. 31 st
3.0 We confirm that except as otherwise specifically provided our Bid Prices in this Second Envelope include all taxes, duties, levies and charges as may be assessed on us/our Associate (applicable for Foreign Bidder), our Sub-Contractor/Sub-Vendor or their employees by all municipal, state or national government authorities in connection with the Facilities, in and outside of India.
3.1 100% of applicable Taxes and Duties i.e GST, which are payable by the Employer under the Contract, shall be reimbursed by the Employer on production of satisfactory documentary evidence by the Contractor in accordance with the provisions of the Bidding Documents.
3.3 We confirm that we have also registered/we shall also get registered in the GST Network with a GSTIN, in all the states where the project is located and the states from which we shall make our supply of goods.
4.0 # (For Joint Venture only) We, the partners of Joint Venture submitting this bid, do agree and confirm that in case of Award of Contract on the Joint Venture, we shall be jointly and severally liable and responsible for the execution of the Contract in accordance with Contract terms and conditions. 1
4.0 We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
Thanking you, we remain,
Yours faithfully,
For and on behalf of
Date : Printed Name :
Place : Designation :
Please provide additional information of the Bidder
Business Address :
Country of Incorporation :
State/Province to be indicated :
Name of Principal Officer :
Address of Principal Officer :
Note: Bidders may note that no prescribed proforma has been enclosed for Attachment 2 : Power of Attorney. Bidders may use their own proforma for furnishing the required information with the bid.
STATEMENT OF QUOTED / CORRECTED PRICES
All Figures are in Rupees
Sl. No. Price Component Quoted Price Corrected Price
1 TOTAL SCHEDULE NO. 1:Ex-Works Price of Plant and Equipment including Type Test Charges 0.00 0.00
2 TOTAL SCHEDULE NO.2: Local Transportation, Insurance and other Incidental Services. 0.00 0.00
3 TOTAL SCHEDULE NO.3: Installation Charges 0.00 0.00
4 TOTAL SCHEDULE NO.4: Training Charges Not Applicable Not Applicable
5 TOTAL BID PRICE: (Excluding Taxes & Duties) 0.00 0.00
6 DISCOUNT #REF! #REF! #REF!
7 NET BID PRICE (Excluding Taxes & Duties) #REF! #REF!
8 TAXES & DUTIES PAYABLE ADDITIONALLY
A) EXCISE DUTY #REF! 0.00
B) CENTRAL SALES TAX #REF! 0.00
C) VAT #REF! 0.00
D) ENTRY TAX / OCTROI #REF! 0.00
F) TOTAL TAXES & DUTIES #REF! 0.00
8 TOTAL BID PRICE (INCLUDING TAXES & DUTIES) #REF! 0.00
9 TOTAL SCHEDULE NO.7: Type Test Charges [Total of this Schedule is included in Schedule-1 above] 0.00 0.00
I) Bidder has indicated the following taxes and duties additionally applicable for their bid:
#REF! Excise Duty #REF! #REF!
#REF! CST #REF! #REF!
#REF! VAT #REF! #REF!
#REF! Entry Tax/ Octroi #REF! #REF!
Others as Others
II) With regard to Entry Tax, it may be mentioned that the substations covered under the subject pacakge falls in State of MP, where an entry tax @ 2% of Purchase Price is applicable. In view of the above, the taxes and duties inter-alia including entry tax applicable for the bids are calculated :
a) Ex-Works Price of Direct Supplies (after discount, if any) Rs. 0
b) Excise Duty, as applicable on (a) above at the rate : 10.00% Rs. 0
c) Amount on which Sales Tax is applicable 0.00 0
d) CST, as applicable on (a) + ED (b) above at the rate : 2.00% Rs. 0
e) VAT, as applicable on (a) + ED (b) above at the rate : 1.00% 0
g) Purchase Price for Entry Tax (Total Ex-Works+F&I+ED+CST+Others) Rs. 0
h) Entry Tax, as applicable on (e) above at the rate : Rs. 0.00
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL) Statement of Quoted / Corrected Prices Page
Spec. No. SRTS-II/C&M/WC-4880/2026/
STATEMENT OF QUOTED / CORRECTED PRICES
All Figures are in Rupees
Sl. No. Price Component Quoted Price Corrected Price
1 TOTAL SCHEDULE NO. 1:Ex-Works Price of Plant and Equipment including Type Test Charges 0.00 0.00
2 TOTAL SCHEDULE NO.2: Local Transportation, Insurance and other Incidental Services. 0.00 0.00
3 TOTAL SCHEDULE NO.3: Installation Charges 0.00 0.00
4 TOTAL SCHEDULE NO.4: Training Charges Not Applicable Not Applicable
5 TOTAL BID PRICE: (Excluding Taxes & Duties) 0.00 0.00
6 DISCOUNT #REF! #REF!
7 NET BID PRICE (Excluding Taxes & Duties) #REF! #REF!
8 TAXES & DUTIES PAYABLE ADDITIONALLY
A) EXCISE DUTY #REF! #REF!
B) CENTRAL SALES TAX /VAT #REF! #REF!
C) ENTRY TAX / OCTROI #REF! #REF!
D) OTHERS #REF! 0.00
E) TOTAL TAXES & DUTIES #REF! #REF!
8 TOTAL BID PRICE (INCLUDING TAXES & DUTIES) #REF! #REF!
9 TOTAL SCHEDULE NO.7: Type Test Charges [Total of this Schedule is included in Schedule-1 above] 0.00 0.00
I) Bidder has indicated the following taxes and duties additionally applicable for their bid:
a) Excise Duty Rs. #REF!
b) CST /VAT Rs. #REF!
c) Entry Tax / Octroi Rs. #REF!
d) Others Rs. #REF!
II) Bidder has offered following discount(s)
III) With regard to Entry Tax, it may be mentioned that the substations covered under the subject pacakge falls in State of MP, where an entry tax @ 1% of Purchase Price is applicable. In view of the above, the taxes and duties inter-alia including entry tax applicable for the bids are calculated : Details of dicounts
a) Ex-Works Price of Direct Supplies (after discount, if any) Rs. #REF! Gross LS #REF! #REF! #REF! Gross % #REF! #REF! #REF!
b) Excise Duty @ 10.3% of (a) above Rs. #REF! #REF! #REF!
c) CST / VAT @ 2% of Ex-Works of Direct Supplies (a) + ED (b) above Rs. #REF! Sch-1 Direct LS #REF! #REF! #REF! Sch-1 Direct % #REF! #REF! #REF!
d) Others Rs. Sch-1 BO LS #REF! #REF! #REF! Sch-1 BO % #REF! #REF! #REF!
e) Purchase Price for Entry Tax (Total Ex-Works+F&I+ED+CST+Others) Rs. #REF! Sch-2 LS #REF! #REF! #REF! Sch-2 % #REF! #REF! #REF!
f) Entry Tax @ 1% of (e) above Rs. #REF! Sch-3 LS #REF! #REF! #REF! Sch-3 % #REF! #REF! #REF!
Sch-7 LS #REF! #REF! #REF! Sch-7 % #REF! #REF! #REF!
Engagement of 3rd party for implementation of SFQPs during Construction of Gadag-II PS – Koppal-II PS 400KV (Quad Moose) 2nd D/C line under the scheme “System strengthening at Koppal-II and Gadag-II for integration of RE Generation Projects” by POWERGRID Koppal Gadag Augmentation Transmission Limited (PKGATL) Statement of Quoted / Corrected Prices Page Different Manner #REF!
Text for Discount #REF!
23 Twenty Three
27 Twenty Seven
28 Twenty Eight
33 Thirty Three
37 Thirty Seven
38 Thirty Eight
73 Seventy Three
74 Seventy Four
75 Seventy Five
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
83 Eighty Three
87 Eighty Seven
88 Eighty Eight
93 Ninety Three
97 Ninety Seven
98 Ninety Eight
100 One Hundred
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
First Envelope and Bid forms.xlsx
xlsx • 1.85 MB
Price_schedule.xlsx
xlsx • 1.44 MB
Approved L2 Schedule.pdf
pdf • 0.25 MB
Safety Provisions for site packages.pdf
pdf • 1.04 MB
Transmission line SFQP Rev 08.pdf
pdf • 3.54 MB
TS-Scope of work.pdf
pdf • 0.97 MB
01-Section-I Invitation for Bids (IFB).pdf
pdf • 0.32 MB
02_Section - II ITB SSTE S&I DCB-PRANIT_Vol-I.pdf
pdf • 0.58 MB
05-Section - IV GCC -S&I Rev 3-DCB.pdf
pdf • 1.93 MB
06- Section-V-SCC.pdf
pdf • 0.25 MB
06_Att-21-MII_revised.DOCX
docx • 0.03 MB
09-Section - VI Forms and Procedures.pdf
pdf • 0.59 MB
12_Attach-27_BSD.docx
docx • 0.02 MB
13_Attach-28-UT HC.docx
docx • 0.03 MB
3_ Bid Data Sheet(BDS)-Section-III.pdf
pdf • 0.37 MB
4-Annexure-A (BDS).pdf
pdf • 0.16 MB
Appendix-II SCC.pdf
pdf • 0.62 MB
Attach-25_Declaration reg events to ITB Cl 2.1.docx
docx • 0.04 MB
Attachment 24- Certificate by Bidder.docx
docx • 0.03 MB
Attachment- Code of Integrity.docx
docx • 0.02 MB
Attachment-18-SAFETY PACT.docx
docx • 0.04 MB
Attachment-20-KMP Delaration.doc
doc • 0.05 MB
Formats for Insurance_surity_Bonds.pdf
pdf • 0.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].