Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H-1₹1.8 CrAccepted-Finance | ₹1.8 Cr | H-1 | Accepted-Finance Lowest Amount Quoted |
| 2 | H-2₹2.7 CrAccepted-Finance LION TOWER PLOT NO 97 ELEGANT ESTATE BAIRAGARH CHICHLI KOLAR ROAD BHOPAL M P | BHOPAL | MADHYA PRADESH | ₹2.7 Cr | H-2 | Accepted-Finance High Amount Quoted by Bidder |
| 3 | H-3₹2.9 CrAccepted-Finance | ₹2.9 Cr | H-3 | Accepted-Finance High Amount Quoted by Bidder |
| 4 | H-4₹2.2 CrAccepted-Finance | ₹2.2 Cr | H-4 | Accepted-Finance High Amount Quoted by Bidder |
| 5 | H-5₹2.2 CrAccepted-Finance | ₹2.2 Cr | H-5 | Accepted-Finance High Amount Quoted by Bidder |
Tender Value
₹55.6 Cr
Closing Date
30 Mar 2021, 5:30 pmClosed
Executive Engineer
Executive Engineer,PWD NH Division Sagar
Consultancy Services for Authoritys Engineer for Supervision of Construction of High Level Bridge across Jamni River on Tikamgarh-Jhansi road and Betwa River on Orchha-Tikamgarh road in the State of Madhya Pradesh on EPC mode
2021_MoRTH_606805_1
23/NNH/AE/EPC/2020-21
Open Tender
Consultancy
540 days
Jamni River and Betwa River
As per RFP Document
4 documents required · 4 mandatory
₹5,000
Yes
002192- Regional Pay and Accounts Office NH Bhopal
Exempted
Nirman Bhanvan, 2nd floor Bhopal MP
1 Sept 2021
3 Mar 2021
1 Apr 2021
3 Mar 2021
30 Mar 2021
3 Mar 2021
15 Mar 2021
Amount
Remuneration for Local Staff (inclusive of per diem allowance)
Team Leader Cum Senior Bridge Engineer
Resident cum Bridge Engineer
Senior Contract Specialist
Road Safety Expert
Senior Quality cum Material Expert
Sub Professional Staff (To be assessed by consultant as per requirement of assignment)
Environmental Engineer
Bridge Design Engineer
Assistant Bridge Engineer
Assistant Quality cum Material Engineer
Quantity Surveyor
Support Staff (inclusive of per diem allowance) Note: To be assessed by consultant as per requirement of assignment
Office Manager
Accountant cum Cashier
Steno cum Computer Operator
Office Boy ( 1 no)
Transportation (Fixed Costs)
1 Innova
2 Bolero
V. Office Rent (Fixed Costs)– Minimum 200 sqm area of office shall be rented.
Office Rent
Office Supplies, Utilities and Communication (Fixed Costs)
Office Supplies
Drafting Supplies
Computer Running Costs
Domestic and International Communication
Office Furniture and Equipment (Rental)
Office Furniture and Equipment
Reports and Document Printing
Monthly reports (Design and Construction) [18x4]
Half yearly Reports [3x4]
Various others reports as provided in the Concession Agreement such as Completion Report [4x4]
Contingencies
Technocrats Advisory Services Pvt. Ltd.
Planning & Infrastructural Development Consultants Pvt. Ltd.
Lion Engineering Consultants Private Limited
Hexa Co.
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid