| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹55,101.15Accepted-Finance | L1 | Accepted-Finance Accept | |
| 2 | L2₹74,603.90+₹19,502.75 (35.4%)Accepted-Finance | L2 | Accepted-Finance Accept | |
| 3 | Not Admitted-Fee/PreQual/Technical 11 ANUPAM VIHAR ENGINEERS ENCLAVE GMS ROAD DEHRADUN UTTARAKHAND 248001 | DEHRADUN | UTTARAKHAND | 248001 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
17 Feb 2024, 4:00 pmClosed
Executive Engineer Irrigation and FC Div Nowshera
Executive Engineer Irrigation and FC Div Nowshera
Restoration/ clearing of sump tank/Jungle clearance / Disilting of main canal and its distributaries/ Raising of canal at spots etc of Dabber Potha L.I.S.
2024_IFC_244714_2
Fresh e-NIT No.31 of 2023-24.
Open Tender
Civil Works - Canal
Item Rate
Nowshera
As per NIT
4 documents required · 4 mandatory
₹500
Yes
Executive Engineer Irrigation and FC Div Nowshera
₹4,000
Yes
20 Feb 2024
12 Feb 2024
19 Feb 2024
12 Feb 2024
17 Feb 2024
12 Feb 2024
Amount
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge: 15.2.1 1:3:6 or richer mix (i/c equivalent design mix)
Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.
Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: 15.9.2 In cement mortar
Removing mortar from and cleaning stones and concrete articles (net quantity of stacks of cleaned materials will be measured) 15.11.2 In cement mortar
Dismantling concrete grouted stone pitching in aprons drains etc. including stacking of serviceable material and disposal of unserviceable material, stacking /disposal lead upto 100 meters.
Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meters lead.
Dry stone pitching (any thickness) excluding cost of stones. 24.4.3 On Slopes
Dry stone pitching (any thickness) excluding cost of stones. 24.4.1 On Horizontal
Dumping stone excluding cost of stones. 24.6.1 in Horizontal on level
Grouting of stone pitching using M-10 nominal mix concrete (max. size of aggregates; 20mm nominal) @ 6.00 cum per 100 sq m on horizontal/side slopes; complete including curing.
Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sand.
Supply of EC bags.
Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) 24.17.1 Dry
Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) 24.17.2 Wet
Weed clearance 24.19.2 From canals(including extraction of roots)
In soils; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m.
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earthlead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. 2.6.1 All kinds of soil :
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. 2.7.1 All kinds of soil :
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: 2.9.1 All kinds of soil :
Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil:
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with. 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with. 4.5.5 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form work for: 4.6.1 Foundations, footings, bases for columns
Centering and shuttering including strutting, propping etc. and removal of form work for: Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc.
Centering and shuttering including strutting, propping etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platforms.
Edges of slabs and breaks in floors and walls 5.16.1.1 Under 20 cm wide
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 5.1.2 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Cold twisted bars
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 5.2.2 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 5.3.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. 2.27.1 Beyond 30 cm girth upto and including 60 cm girth.
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 60 cm girth upto and including 120 cm girth.
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material 2.27.3 Beyond 120 cm girth upto and including 240 cm girth.
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. 2.27.4 Above 240 cm girth
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarsesand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: 7.1.1 Cement mortar 1:6 (1 Cement : 6 coarse sand) a) Nallah
Random Rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including levelling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) and curing complete at window sills, ceiling level and the like: 7.2.1 Cement mortar 1:6 (1 Cement : 6 coarse sand) A) Nallah
Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil.
Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto1.5 m in -All kinds of soil.
Extra for levelling & neatly dressing of disposed soil completely as directed by Engineer-in-charge.
Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.
12mm Cement plaster of mix: 13.1.1 1 : 4 ( 1 cement : 4 fine sand)
12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand)
Constructing muthu bunds, comprising boulders and wood bushes in alternate layers; including working in water situations.
Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like.
Carriage of sand and bajri for an avg. distance 0 to 5 kms by MT
Carriage of sand and bajri for an avg. distance 10 kms by MT
Carriage of sand and bajri for an avg. distance 20 kms and above by MT
Carriage of sand and bajri for an avg. distance 0 to 100 m by H.L
Carriage of sand and bajri for an avg. distance 200 m by H.L
Carriage of sand and bajri for an avg. distance 300 m by H.L
Carriage of stone for an avg distance of 10 km by MT
Carriage of stone for an avg distance of 20 km and above by MT
Carriage of stone for an avg distance of 0 to 100 m by H.L
Carriage of stone for an avg distance of 200 m by H.L
Carriage of stone for an avg distance of 300 m by H.L
Unloading sand/earth filled bags from boats; placing in water
Supply of Sand
Extra for every additional 1.5 m or part thereof in excavation/banking excavated or stacked material in all kinds of soil
Engagement of labour
ANIL KUMAR
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .