Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-AOC SANTINEKATAN ROAD BOLPUR | BOLPUR | L1 | Accepted-AOC lowest bidder | |
| 2 | L2₹4.5 L+₹3,333.47 (0.74%)Rejected-Finance 00 DEY ENTERPRISE SODEPUR 9 10 PITS COLLIERY ASANSOL BARDHAMAN WEST BENGAL 713372 | PASCHIM BARDHAMAN | WEST BENGAL | 713372 | L2 | Rejected-Finance higher than L1 | |
| 3 | L3₹4.5 L+₹6,651.44 (1.49%)Rejected-Finance 17 1 ABHOY HALDER LANE KOLKATA | KOLKATA | L3 | Rejected-Finance higher than L1 |
Tender Value
Refer Docs
EMD Value
₹9,500
Closing Date
5 Feb 2025, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
Utility_Bldg__Beside_Delhi_Public_School_AA_ID_New_Town_Kol_700156
Arrangement of neutralization pit and allied works for gaseous chlorination arrangement at OHR-12 in AA-II under NTK Project.
2025_PHED_802999_5
PHE/NTKMD/e-18 of 2024-25
Open Tender
Project Work
Item Wise
60 days
WORK
Please refer Tender documents.
4 documents required · 4 mandatory
₹9,500
25 Feb 2025
20 Jan 2025
7 Feb 2025
21 Jan 2025
5 Feb 2025
21 Jan 2025
Amount
Supply and delivery of gaseous chlorination Safety Device Unit for the following sites :-
Air Blower Centrifugal Fan / 1000 CFM @ 400 mm WC with motor capacity of 3.7 kW (5HP)
Baby Cylinder FRP Full Hood Cover.
100 mm dia uPVC pipe with fittings (100 mm dia uPVC Pipe- 12 mtr., 100 mm dia uPVC Elbow-10 nos., 100 mm dia Tee - 4 nos., 100 mm dia uPVC Flange- 2 nos., 4" X 3" uPVC Bush 2 nos., 100 mm dia uPVC NRV-1 no. 100 mm dia Flexible Hose - 10 mtr.)
Caustic Solution.
Construction of neutralization pit With FRP cover, Size- (1.5 mtr. x 1 mtr.x 1.5 mtr.) by excavation of soil, brick soiling, brick work 2 plastering finish for neutralization of chlorine gas by deploying skilled, unskilled labour all complete as per direction.
Fitting fixing of the above new supplied spares on the gaseous chlorination pipe line & Injector service & rotameter service new existing 3 position part by part with necessary fitting materials job by expert mechanical complete the job as per direction of EIC and as per IS-10553.
N.B. - 1) Manufacturer warranty of Air Blower Centrifugal Fan for 1 year from the date of installation or 1.5 Years from the date of delivery should be given. 2) Manufacturer Test certificate should be submitted during the delivery of Air Blower Centrifugal Fan. 3) If any defects arises within one year from the date of installation, the agency should be bound to repair or replace the same without claiming any additional cost for the related works.
GST @18% of Total Value in Amount
CESS @1% of Total Value in Amount
DEY ENTERPRISE (BID ID -6086923)
ORIENTAL ENGINEERING CO. (BID ID -6091689)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .