Loading…
Loading…
Tender Value
₹49.5 L
EMD Value
₹50,000
Closing Date
10 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, Salinity Control Division, Porbandar
UPGRADATION OF VARIOUS BARDA GHED ROADS IN VILLAGE KINDERKHEDA AND SISLI OF PORBANDAR TALUKA AND DISTRICT
291025
50 of 2025-26
Open
Civil Works - Others
Porbandar
10 documents required · 8 mandatory · 2 optional
₹1,500
Yes
Executive Engineer, Salinity Control Division, Porbandar
₹50,000
Yes
28 Mar 2026
28 Mar 2026
28 Mar 2026
10 Apr 2026
28 Mar 2026
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder, Conditions
of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and are given to
provide a common basis for bidding. The basis of payment will be the actual quantities of work
ordered and carried out, as measured by the Contractor and verified by the Engineer and
valued at the rates and prices tendered in the priced Bill of Quantities, where applicable, and
otherwise at such rates and prices as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far as it is
otherwise provided under the Contract, include all constructional plant, layout, supervision,
materials, erection, maintenance, insurance, profit, taxes and duties, together with all general
risks, liabilities and obligations set out or implied in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether quantities
are stated or not. The cost of Items against which Contractor has failed to enter a rate or price
shall be deemed to be covered by other rates and prices entered in the Bill of Quantities (in
case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included in the items
provided in the priced Bill of Quantities, and where no Items are provided the cost shall be
deemed to be distributed among the rates and prices entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily repeated or
summarized in the Bill of Quantities. References to the relevant sections of the contract
documentation shall be made before entering rates or prices against each item in the Bill of
8. The method of completed work of payment shall be in accordance with the specification for
Road and Bridge works. For building works specifications for building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to Clause
of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required blasting, or the
use of metal wedges and sledgehammers, or the use of compressed air drilling for its removal,
and which cannot be extracted by ripping with a tractor of at least 150 kw with a single rear
mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr.)
Item Description of Item (with brief Quantity Unit Rate in Amount
No. specification and reference to book Figures
of specifications)
1 Jungle Clerance (Ganda Baval etc) of Light/ 62000.00 Sqmt. 3.80
Heavy Dence (work done by manually or by
machinery) including grabbing of &
Removing the roots & grith completely from
the ground & back fill with earth & making
surface good as in earth as directed
including depositing & removing the
material away from the site of work at own
risk and cost as and where directed etc.
completed for following (a) light density
2 Providing murrum including spreading the 17438.00 Cumt. 237.46
same and dressing the side slope & top
surface in required grade and camber with
lead upto 5.0 km etc. complete.
3 Rolling and consolidation using vibratory 17438.00 Cumt. 33.09
road roller 8-10 tonne capacity (incl.
watering) (A) earth work (layer not
exceeding 200mm thickness)
Rs. Rupees Fourty Nine Lac Fifty Three Thousand Four Hundred Fifty and Ninty
I/We am/are willing to carry out the work at……………. % above/below percent (Should be written in
figures and words) of the estimated rate mentioned above. Amount of my /our tender works out as
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
Signature of Contractor Executive Engineer
Salinity Control Division
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
specification and In In
reference to book of figures Words
specifications)
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ………………………………
(C) Net Tendered Amount (A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work
as directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken
as per Govt. G.R. PRC-10/2017 Cement Consumption/16/C Date:- 11/05/2017 as
stated in S.O.R. therefore in R.C.C. items where is a change as per actual mix design
the cost of difference of cement consumption have been deducted from the rate of
original item at the rate of input rate mentioned in all the tender.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Notice No.50 of 2025-26.pdf
BOQ Kinderkheda and Sisli 49.53.pdf
SBD Kinderkheda and Sisli.pdf
Download all tender documents and submit your bid