| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.9 LAccepted-AOC | ₹45.9 L | L1 | Accepted-AOC OFBA CWC- I decided to accept the offer and place the work order on M/s. S.N.Construction, Sawari, Bhandara, at the revised overall offer of Rs. 4587041/- |
| 2 | L2₹49.5 L+₹3.6 L (7.90%)Rejected-Finance | ₹49.5 L+₹3.6 L (7.90%) | L2 | Rejected-Finance As per CWC- I decision Held on 13/06/2026 |
| 3 | L3₹51.2 L+₹5.3 L (11.6%)Rejected-Finance | ₹51.2 L+₹5.3 L (11.6%) | L3 | Rejected-Finance As per CWC- I decision Held on 13/06/2026 |
| 4 | L4₹54.8 L+₹8.9 L (19.5%)Rejected-Finance | ₹54.8 L+₹8.9 L (19.5%) | L4 | Rejected-Finance As per CWC- I decision Held on 13/06/2026 |
| 5 | L5₹57.0 L+₹11.1 L (24.2%)Rejected-Finance | ₹57.0 L+₹11.1 L (24.2%) | L5 | Rejected-Finance As per CWC- I decision Held on 13/06/2026 |
| Sl No | Description | Qty | Unit | DARSHAN SINGH PLAHA L5 | H R LANJEWAR L4 | Mangla And Mangla Construction L2 | S.N.Construction L1 | M/s. H.B.CONSTRUCTION L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of Cement concrete (Unreinforced) of any description and in any position not otherwise specifically provided for all as specified and as directed by theE-I-C. | 110 | CUM | 2,100 ₹2,31,000 | 2,000 ₹2,20,000 | 2,000 ₹2,20,000 | 1,745 ₹1,91,950 Lowest | 1,800 ₹1,98,000 |
| 2.00 | Excavation over area in hard/dense soil n. exc 1.5 m deep and getting out all as directed by EIC. | 230 | CUM | 605 ₹1,39,150 | 600 ₹1,38,000 | 500 ₹1,15,000 | 481 ₹1,10,630 Lowest | 495 ₹1,13,850 |
| 3.00 | Boring holes 300mm diameter not exceeding 3m deep in soil for under reamed piles and getting out and diposted soil to a distance 50m | 50 | NOS. | 1,514 ₹75,700 | 1,500 ₹75,000 | 1,300 ₹65,000 Lowest | 1,309 ₹65,450 | 1,350 ₹67,500 |
| 4.00 | Excavating in trenches, not exc 1.5m wide and not exc 1.5m in depth; for foundation etc. or for shafts, wells, cesspits, manholes, pier holes etc. not exc 10 sq. m on plan and not exc 1.5m in depth and getting out in mud soil, complete all as specified | 90 | CUM | 1,301 ₹1,17,090 | 1,300 ₹1,17,000 | 500 ₹45,000 Lowest | 1,188 ₹1,06,920 | 1,200 ₹1,08,000 |
| 5.00 | Returning filling of demolished concrete debris and spreading, consolidated not exc. 25 CM complete all as specified. | 40 | CUM | 159 ₹6,360 | 160 ₹6,400 | 100 ₹4,000 Lowest | 148 ₹5,920 | 150 ₹6,000 |
| 6.00 | M & L for hardcore of broken stone or boulders gauge n exc. 63mm, deposited, spread and levelled in layers n exc. 15cm thick, watered and remmed to a true surface, complete all as specified | 30 | CUM | 2,530 ₹75,900 | 2,500 ₹75,000 | 3,000 ₹90,000 | 2,214 ₹66,420 Lowest | 2,500 ₹75,000 |
| 7.00 | M & L for sand filling under floors or in foundations including watering and consolidation, complete all as specified | 30 | CUM | 2,005 ₹60,150 | 2,000 ₹60,000 Lowest | 2,200 ₹66,000 | 2,112 ₹63,360 | 2,300 ₹69,000 |
| 8.00 | Providing cement concrete Ty. B-0, 1:2:4 (12.5mm graded aggregate) 40 mm thick foregoing (Reinforcement measured separately), completed as specified and directed by EIC | 550 | SQM | 460 ₹2,53,000 | 450 ₹2,47,500 | 300 ₹1,65,000 Lowest | 372 ₹2,04,600 | 400 ₹2,20,000 |
| 9.00 | Providing cement concrete Ty. B-1, 1:2:4 (20 mm graded aggregate) 100 mm thick foregoing (Reinforcement measured separately) , completed as specified and directed by EIC | 1,500 | SQM | 810 ₹12,15,000 | 800 ₹12,00,000 | 700 ₹10,50,000 | 684 ₹10,26,000 Lowest | 700 ₹10,50,000 |
| 10.00 | Providing cement concrete Ty. D-2, 1:4:8 (40 mm graded aggregate) 100 mm thick , completed as specified and directed by EIC | 1,250 | SQM | 645 ₹8,06,250 | 600 ₹7,50,000 | 600 ₹7,50,000 | 570 ₹7,12,500 Lowest | 610 ₹7,62,500 |
Tender Value
₹45.0 L
EMD Value
₹90,000
Closing Date
29 May 2026, 5:45 pmClosed
CHIEF GENERAL MANAGER
CHIEF GENERAL MANAGER ORDNANCE FACTORY BHANDARA MUNITIONS INDIA LTD
Item rate contract for masonry concrete works, ceiling and linings, otta, floor finishes, plinth protection, approaches, paving and other related works of qtrs. and area at OFBa
2026_MIL_277663_1
EO/51/RD2601/BF
Open Tender
Civil Works
Item Rate
304 days
O.F.BHANDARA
AS PER TENDER DOCUMENT
7 documents required · 7 mandatory
₹0
₹90,000
Yes
13 Jun 2026
15 May 2026
1 Jun 2026
15 May 2026
29 May 2026
15 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of Cement concrete (Unreinforced) of any description and in any position not otherwise specifically provided for all as specified and as directed by theE-I-C. | 110 | CUM | 1,631.3 | ₹1,79,443 |
| 2 | Excavation over area in hard/dense soil n. exc 1.5 m deep and getting out all as directed by EIC. | 230 | CUM | 450 | ₹1,03,500 |
| 3 | Boring holes 300mm diameter not exceeding 3m deep in soil for under reamed piles and getting out and diposted soil to a distance 50m | 50 | NOS. | 1,224.7 | ₹61,235 |
| 4 | Excavating in trenches, not exc 1.5m wide and not exc 1.5m in depth; for foundation etc. or for shafts, wells, cesspits, manholes, pier holes etc. not exc 10 sq. m on plan and not exc 1.5m in depth and getting out in mud soil, complete all as specified | 90 | CUM | 1,111.9 | ₹1,00,071 |
| 5 | Returning filling of demolished concrete debris and spreading, consolidated not exc. 25 CM complete all as specified. | 40 | CUM | 139.1 | ₹5,564 |
| 6 | M & L for hardcore of broken stone or boulders gauge n exc. 63mm, deposited, spread and levelled in layers n exc. 15cm thick, watered and remmed to a true surface, complete all as specified | 30 | CUM | 2,070.8 | ₹62,124 |
| 7 | M & L for sand filling under floors or in foundations including watering and consolidation, complete all as specified | 30 | CUM | 1,974.3 | ₹59,229 |
| 8 | Providing cement concrete Ty. B-0, 1:2:4 (12.5mm graded aggregate) 40 mm thick foregoing (Reinforcement measured separately), completed as specified and directed by EIC | 550 | SQM | 348.9 | ₹1,91,895 |
| 9 | Providing cement concrete Ty. B-1, 1:2:4 (20 mm graded aggregate) 100 mm thick foregoing (Reinforcement measured separately) , completed as specified and directed by EIC | 1,500 | SQM | 640.3 | ₹9,60,450 |
| 10 | Providing cement concrete Ty. D-2, 1:4:8 (40 mm graded aggregate) 100 mm thick , completed as specified and directed by EIC | 1,250 | SQM | 533 | ₹6,66,250 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.14 MB
EligibilityConditionsAnnexureA.pdf
Tender Documents • 0.10 MB
TenderAcceptanceLetterFormatAnnexureE.pdf
Tender Documents • 0.05 MB
ScopeOfWorkAnnexureD.pdf
Tender Documents • 0.17 MB
StandardConditionsOfContractAnnexureC.pdf
Tender Documents • 0.67 MB
StandardConditionsOfContractAnnexureCPart123.pdf
Tender Documents • 0.21 MB
InstructionsToBiddersAnnexureB.pdf
Tender Documents • 0.05 MB
ANNEXTUREI.pdf
Tender Documents • 0.27 MB
BOQ_324280.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .