| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 CrAccepted-AOC | L1 | Accepted-AOC Work allotted Rajbir Singh Hooda contractor | |
| 2 | L2₹4.0 Cr+₹18.3 L (4.86%)Rejected-Finance | L2 | Rejected-Finance Reject | |
| 3 | L3₹4.1 Cr+₹34.6 L (9.18%)Rejected-Finance HSVP PANCHKULA | PANCHKULA | HARYANA | 133301 | L3 | Rejected-Finance reject | |
| 4 | L4₹4.5 Cr+₹70.4 L (18.7%)Rejected-Finance FLAT NO 2450 KRISHNA COLONY JIND 126102 | JIND | HARYANA | 126102 | L4 | Rejected-Finance Reject |
Tender Value
₹3.3 Cr
EMD Value
₹6.6 L
Closing Date
24 Feb 2021, 11:00 amClosed
EE
PHED No 2 Sonipat
BAJANA KALAN PROVIDING CANAL BASED WATER SUPPLY SCHEME FOR GROUP OF 3 VILLAGES ie BAJANA KALAN BAJANA KHURD PUGTHALA BY CONSTRUCTING WW AT BAJANA KALAN PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTIONS LAYING OF BALANCE PIPE LINES IN VILLAGES DISTT
2021_HRY_159337_1
Bajana Kalan canel based water supply
Open Tender
Civil Works
Works
1825 days
Sonipat
Please refer Tender documents.
2 documents required · 2 mandatory
₹15,000
₹6.6 L
29 Apr 2021
10 Feb 2021
24 Feb 2021
10 Feb 2021
24 Feb 2021
10 Feb 2021
Amount
WATER TREATMENT PLANT (WTP) Design, construction, testing & commissioning of 1.00 MLD capacity Water treatment plant including inlet channel, Alum dozing, Flash mixing, Clarifloculator, filter box, over head Reservoir for back wash, waste water tank including all civil work, pumping machineries and electric cabling, control panels, entire piping network of suitable size laying the DI pipe from raw water pump to inlet box of WTP, WTP to CWT & Suction Well for CW including DI specials, suitable size Sluice valves, Hodies, manhole covers, air scour equipment, chemical house including chlorination equipment and arrangement of flow measurement and sand bed complete in all respects as per NIT (Sluice valves of make IVC/VAG) .
RAW WATER PUMPING MACHINERY Supply & Eraction of Horizontal spindle split casing type pumping sets of following duties directly coupled to AC squirrel cage induction type motor with accessories as described in Schedule No II complete in all respect with priming arrangement with complete base frame WATER WORKS 900 LPM X 12.5 M. Head
CLEAR WATER PUMPING MACHINERY Supply & Eraction of Horizontal spindle split casing type pumping sets of following duties directly coupled to AC squirrel cage induction type motor with accessories as described in Schedule No II complete in all respect with priming arrangement with complete base frame WATER WORKS 700 LPM X 30 M. Head
700 LPM X 45 M. Head
B/STN. PUGTHALA 1000 LPM X 45 M. Head
B/STN. BAJANA KHURD 700 LPM X 45 M. Head
PANEL BOARDS FOR MOTORS Supply, erection, testing & commissioning of wall mounted electrical L.T. Panel board, fabricated from 16 SWG CRCA sheet duly stouted with suitable angle iron frame work and completely powder coated of approximate size 1200 x 900 mm and 400 mm deep having follwing items For 3 no Pumping Sets of 900 LPM x 12.5 m Head a) Main switch 63 amp. 1 No. (L&T Siemens, ABB) b) CT 100/3 = 3 Nos. (AE/ KAPPA/ L&T) c) Digital Multi function meter = 1 No. d) SPP = 1 No. of approved make e) Motor starter, Star delta for 900 LPM x 12.5 m Head = 2 Nos (L&T Siemens, ABB) f) VSS 1 No. & ASS 3 Nos. of approved make. g)Capacitor KVAR as per site requirement = 1 No. h) Indicating Lamp = One Set i) Change over switch of suitable Amp = 1 No. (Each) Ref. sr. no. 2.1.1
For 2 no Pumping Sets of 700 LPM x 30 m Head a) Main switch 63 amp. 2 No. (L&T Siemens, ABB) b) CT 100/3 = 2 Nos. (AE/ KAPPA/ L&T) c) Digital Multi function meter = 1 No. d) SPP = 1 No. of approved make e) Motor starter, Star delta for 700 LPM x 30 m Head = 2 Nos (L&T Siemens, ABB) f) VSS 1 No. & ASS 2 Nos. of approved make. g)Capacitor KVAR as per site requirement = 1 No. h) Indicating Lamp = One Set i) Change over switch of suitable Amp = 1 No. (Each) Ref. sr. no. 3.1.1
For 2 no Pumping Sets of 700 LPM x 45 m Head a) Main switch 63 amp. 1 No. (L&T Siemens, ABB) b) CT 100/3 = 2 Nos. (AE/ KAPPA/ L&T) c) Digital Multi function meter = 1 No. d) SPP = 1 No. of approved make e) Motor starter, Star delta for 700 LPM x 45 m Head = 2 Nos (L&T Siemens, ABB) f) VSS 1 No. & ASS 2 Nos. of approved make. g)Capacitor KVAR as per site requirement = 1 No. h) Indicating Lamp = One Set i) Change over switch of suitable Amp = 1 No. (Each) Ref. sr. no. 3.1.2
For 2 no Pumping Sets of 1000 LPM x 45 m Head a) Main switch 63 amp. 1 No. (L&T Siemens, ABB) b) CT 100/3 = 2 Nos. (AE/ KAPPA/ L&T) c) Digital Multi function meter = 1 No. d) SPP = 1 No. of approved make e) Motor starter, Star delta for 1000 LPM x 45 m Head = 2 Nos (L&T Siemens, ABB) f) VSS 1 No. & ASS 2 Nos. of approved make. g)Capacitor KVAR as per site requirement = 1 No. h) Indicating Lamp = One Set i) Change over switch of suitable Amp = 1 No. (Each) Ref. sr. no. 3.2.1
For 2 no Pumping Sets of 700 LPM x 45 m Head a) Main switch 63 amp. 1 No. (L&T Siemens, ABB) b) CT 100/3 = 2 Nos. (AE/ KAPPA/ L&T) c) Digital Multi function meter = 1 No. d) SPP = 1 No. of approved make e) Motor starter, Star delta for 700 LPM x 45 m Head = 2 Nos (L&T Siemens, ABB) f) VSS 1 No. & ASS 2 Nos. of approved make. g)Capacitor KVAR as per site requirement = 1 No. h) Indicating Lamp = One Set i) Change over switch of suitable Amp = 1 No. (Each) Ref. sr. no. 3.3.1
Sluice Valves / NRV & specials for Pumping Machinery Supplying, fixing, jointing, testing & commissioning of DI sluice valves resilient sheet P.N. 1.6 including cost of jointing material complete in all respect. (IVC / VAG make, Kirloskar) 100 mm i/d
Supplying,fixing, testing & commissioning of DI swing check type reflux valve (non returned valve) PN 1.6 including cost of jointing material complete in all respect.( IVC / VAG , Kirloskar make) 100 mm i/d
Supply, fixing & testing of Mechanical Joints PN 1.6 alongwith ruber gaskit & galvanized nuts / bolts complete in all respect. 100 mm i/d
Supply, erection, fixing & testing of DI Double flanged pipe complete with all jointing materials 100 mm i/d
Sluice Valves/ Specials For Rising Mains & W/W Supplying, fixing, jointing, testing & commissioning of DI sluice valves resilient sheet P.N. 1.6 as per DNIT specification on the pumping machinery & head works including cost of jointing material (IVC / VAG make) 100 mm i/d
Supply & Fixing of Mechanical Joints PN 1.6 alongwith ruber gaskit & galvanized nuts / bolts complete in all respect. 100 mm i/d
Supply, erection, testing & commissioning of IS marked copper wire for various motors with underground system in PVC and flexible pipes copper wire 3 core complete in all respevts with accessories like thimble etc. 10mm2 3core
25mm2 3core
Providing and fixing of insulated Rubber matting suitable for HKV installation 1 meter x 2 meter x 12 mm as per specification.
Providing & fixing suitable size floating along with swivel bend as per required specifications approved by Engineer-in-Charge
Supply erection testing of reputed make LED light 100 wats with fittings and accessories complete in all repects. (4 at ww + 2 B/Stn Pughtala + 2 Bstn Bajana Khurd)
Providing & fixing of D.I. Kinetic Air Valve soft seated as confirming to I.S.I. complete in all respect including surface chamber box, hodi etc. 80mm
Design, Supply & Erection of copper wound outdoor type Transformers of required KVA as mentioned below on load tap changer of suitable capacity on higher side of standard make outdoor type, VCB Panel, G.O. Switch, H.T. Metering Panels, APFC Panels for Transformer, 11KV Substation, entire cable network from G.O. Switch to H.T. Metering equipment and from H.T. Metering to Transformer Main to L.T. Panel, Earthing, safety equipment and any other contingent thereto complete in all respect as per DNIT and getting it passed from Chief Electrical Officer including operation & Maintenance of 5 Years. at WW 100 KAV
Providing & fixing in position GI elbow ISI marked complete in all respect 15 mm i/d 917 x 4 = 3,668
Providing & fixing in position GI Nipple ISI marked complete in all respect 15mm x150mm /100 mm 917 x 2 = 1,834
Operation & Maintenance Operation & maintenance for the complete scope of work mentioned in the DNIT (Disinfection material will be supplied by the PHED) as per schedule-IV for a period of 5 yrs after 12 months during Defect liability period of 03 months trial run. (Will be charged to A/mtc estimate)." Operation and maintenance during defet liability period (Operational Only)
Operation & maintenance during 1st year after defect liability period.
Operation and maintenance during 2nd year
Operation and maintenance during 3rd year
Operation and maintenance during 4th year
Operation and maintenance during 5th year
Bidder Name
Amount
SATVIR SINGH CONTRACTOR(GSTN-06ABNPS8716P1ZO)
Rajbir Singh Hooda(GSTN-NA)
ROHTASH KUMAR CONTRACTOR(GSTN-NA)
M/S AAR PEE CONSTRUCTION COMPANY JIND(GSTN-NA)
SATVIR SINGH CONTRACTOR
ROHTASH KUMAR CONTRACTOR
M/S AAR PEE CONSTRUCTION COMPANY JIND
Rajbir Singh Hooda
ROHTASH KUMAR CONTRACTOR
M/S AAR PEE CONSTRUCTION COMPANY JIND
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .