Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC | ₹1.7 Cr | L1 | Accepted-AOC 1st Lowest Bidder Winner of Lottery |
| 2 | L1₹1.7 CrRejected-Finance | ₹1.7 Cr | L1 | Rejected-Finance 1st Lowest Bidder Looser of Lottery |
| 3 | L1₹1.7 CrRejected-Finance | ₹1.7 Cr | L1 | Rejected-Finance 1st Lowest Bidder Looser of Lottery |
| 4 | L1₹1.7 CrRejected-Finance | ₹1.7 Cr | L1 | Rejected-Finance 1st Lowest Bidder Looser of Lottery |
| 5 | L1₹1.7 CrRejected-Finance | ₹1.7 Cr | L1 | Rejected-Finance 1st Lowest Bidder Looser of Lottery |
Tender Value
₹1.7 Cr
EMD Value
₹1.7 L
Closing Date
11 May 2026, 4:00 pmClosed
Circle Officer
Circle Office Keonjhar
Construction of New Tahasil Office building for Tahasil, Sadar, Sundargarh as per Revenue and DM Deptt. Lr. No. 47483 dt. 17.12.2025 Buildings.
2026_EICCL_128478_1
CCEKC-02/2026-27
Open Tender
Civil Works - Buildings
Percentage
210 days
Sundargarh
4 documents required · 4 mandatory
₹10,000
₹1.7 L
Yes
1 Sept 2026
27 Apr 2026
12 May 2026
27 Apr 2026
11 May 2026
27 Apr 2026
27 Apr 2026 - 5 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil Work WORKS (PART-I)
Earthwork in excavation of foundation in hard soil or gravelly soil within 50m initial lead and 1.5m, initial lift including shoring,shuttering, propping bullahs, piling,dewatering from foundation, with & working pumps & staking the excaveted materials away from the working area including rough dressing the bed and foundation tranches to required size including cost, conveyance, taxes, cess, royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge | 444.99 | cum | 276.89 | ₹1,23,213.28 |
| 2 | Supplying and filling in foundation and plinths with sand well watered and compacted including cost of all materials, labour, conveyance, loading and unloading, taxes, cess, royalties, watering, sundries, tools and plants, etc., complete as per the direction of the Engineer-in-charge. | 265.95 | cum | 540.01 | ₹1,43,615.66 |
| 3 | Providing and laying plain cement concrete (1:3:6)(using branded cement) in foundation using 40 mm size hard crusher broken granite metal of approved quality from approved quarry including mixing, lowering, laying and compacting to proper thickness, watering and curing for the required period including cost of all material, labour, conveyance, loading and unloading, taxes,cess, royalties, scaffolding, watering, curing, sundries, tools and plants,etc. ,complete as per the direction of the Engineer-in-charge. | 67.96 | cum | 6,646.29 | ₹4,51,681.87 |
| 4 | Fly Ash brick masonry in cement mortar (1:6) (Using Branded Cement) in foundation & plinth using Fly Ash bricks of 23x11x 8 cm size having a crushing strength of not less than 75 kg./sqcm with dimensional tolerance ± 2% including splays cutting circular moulding chamfering and corbelling and similar such type of works with all necessary projections watering and curing after immersing the bricks in water at least for six hours before use including cost, conveyance, royalties and taxes of all materials with all labour,labour cess and T & P required for the work complete in all respect as per specification & direction of Engineer-in-charge. | 44.83 | cum | 5,437.97 | ₹2,43,784.2 |
| 5 | Providing Fly Ash brick masonry work in super structure using 23 X 11 X 8 cm (with dimensional tolerance of ± 2% ) Fly Ash bricks having crushing strength not less than 75 kg. / sq cm, mortar of mix 1:6 (1 cement : 6 sand),(using branded cement) immersing the bricks for minimum 6 hrs in water before use, with all necessary projections, splay cutting, circular moulding, corbelling, etc., including cost of all materials, labour, conveyance, loading and unloading, taxes, cess, royalties, scaffolding, watering, curing, sundries, tools and plants,etc., complete as per the direction of the Engineer-in-charge.
a) Ground Floor | 74.17 | cum | 5,476.3 | ₹4,06,177.17 |
| 6 | b) 1st Floor | 60.42 | cum | 5,854.69 | ₹3,53,740.37 |
| 7 | c) 2nd Floor | 23 | cum | 6,289.83 | ₹1,44,666.09 |
| 8 | Providing Fly Ash brick masonry work in super structure using 23 X 11 X 8 cm (with dimensional tolerance of ± 2% ) Fly Ash bricks having crushing strength not less than 75 kg. / sq cm, mortar of mix 1:4 (1 cement : 4 sand),(using branded cement) immersing the bricks for minimum 6 hrs in water before use, with all necessary projections, splay cutting, circular moulding, corbelling, etc., including cost of all materials, labour, conveyance, loading and unloading, taxes, cess, royalties, scaffolding, watering, curing, sundries, tools and plants,etc., complete as per the direction of the Engineer-in-charge.
a) Ground Floor | 4.6 | cum | 5,664.22 | ₹26,055.41 |
| 9 | b) 1st Floor | 7.1 | sqm | 6,042.61 | ₹42,902.53 |
| 10 | Providing lifting , hoisting and laying Reinforced Cement Concrete of M 20 grade(using branded cement) to the following structural member or in places as shown in the drawing for all floors with 20 mm and down graded size hard crusher broken granite chips of approved quality from approved quarry including mixing and vibro compacting to proper shape and size, level and plumb and finishing the exposed surfaces smooth (if required by grouting / providing plaster with cement mortar 1:4 wherever necesary without any extra cost) scaffolding, including watering and curing for the required period including providing strong, rigid, levelled and plumbed centring and shuttering to required shape and size, for floors with wood/Steel centring materials, with all necessary bracing and ties and supports pockets for electrical conduits, pipes, PH pipes, for hooks or boxes, switchboards and insert plates, clamps and extension bars, etc, including dismantling the same after the required interval from the date of casting, including cost of all materials, labour, conveyance, loading and unloading, taxes, cess, royalties, scaffolding, watering,curing, sundries. tools and plants etc. complete as per direction of the engineer-in-charge, but excluding cost of steel reinforcement.
i) R.C.C Column Base, Footing | 47.81 | cum | 6,101.49 | ₹2,91,712.24 |
stage.html
html • 0.13 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 3.57 MB
Tendernotice_1.pdf
PDF • 1.71 MB
BOQ_588772.xls
BOQ • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .