Loading…
Loading…
Tender Value
₹79.8 L
EMD Value
₹79,816
Closing Date
3 Aug 2026, 3:15 pm2d left
GUNTUR MUNICIPAL CORPORATION
Guntur
Cobble Stone Pavement Works for Jinnah Tower in Guntur Municipal Corporation.
969016
ET NO.30/2026-27 Item No.7
OPEN - NCB
Similar Work
GUNTUR
1 document required · 1 mandatory
₹2,826
₹79,816
27 Jul 2026
27 Jul 2026
27 Jul 2026
Dismantling of flexible pavements by mechanical means and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately as directed by the Engineer-in-Charge and as per MoRTH specification 202 II (5th revision)
Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete for finished item of work, excluding seigniorage charges, as per MoRT&H specification 304 (5th Revision) and as directed by the Engineer-in-Charge
Filling with Gravel , including cost of Gravel, seinourage charges and conveyance to site, filling charges, watering, tamping and rammming and all labour charges and operational charges complete as directed by the Departmental officers.
Supplying and fixing with Cobble stones of size 100mm x 100mm x 100mm (4" x 4" x 4") and any colour of granite stone with hand cut edges/Machine cut edges / Thumbed edges & of flamed / shotblasted finish.etc set over base coat of 30mm thick and jointing with cement mortar (1:3) using screened sand over CC bed (1:3;6) already laid, including flushing with neat cement slurry of honey like consistency spread @ 3.0 kgs per sqm, including cost and conveyance of all materials like cobble stone, cement , 2.36mm - 5mm size stone chips (sand), water etc., and overheads & contractors profit complete, but excluding seigniorage charges, as per drawing or as directed by the Engineer-incharge for finished itme of work
Construction of Granular sub-base by providing HBG material confirming to Grading - V of MoRT&H Table 400-1 including cost and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. ( Pavement will be made based on levels for finished item of work ).
Plain Cement Concrete (1:3:6) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard, machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402)
Provision for Seignorage charges
Provision for NAC @ 0.10%
Provision for GST @ 18%
Provision for TPQA @ 0.739 %
Unforeseen item
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ.xlsx
TENDER_DOCUMENT • 0.07 MB
NIT - Copy.docx
TENDER_DOCUMENT • 0.03 MB
Self Declaration.docx
TENDER_DOCUMENT • 0.03 MB
Tender Document.doc
TENDER_DOCUMENT • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].