Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹1,200
Closing Date
4 Jul 2022, 6:55 pmClosed
Executive Engineer Mech. Irrig. Div. Baramulla
Mech. Irrig. Div. Baramulla
Electrical work to be carried out at lift Irrigation scheme Ijara
2022_IFC_176338_4
eNIT 24 of 2022-23
Open Tender
Repair and Maintenance Works
Item Rate
7 days
Baramulla
Please refer Tender documents.
6 documents required · 6 mandatory
₹50
Yes
Executive Engineer Mech. Irrig. Div. Baramulla
₹1,200
Yes
14 Jul 2022
27 Jun 2022
5 Jul 2022
27 Jun 2022
4 Jul 2022
27 Jun 2022
Amount
Repairs to 400HP Starter unit no.01at L.I.S Ijara by way of: Disconnecting of fully automatic Autotransformer Starter from the main circuit, then dismantling of damaged parts from the starter which comprises of following job. a) Replacement of damaged A.C coils of Telemecanique & Controls LCIF 630A 415volt 50HZ with new one. The Electromagnetic Contactor assembly coil voltage range 240V Ac. (01 no) b) Providing/fitting & Testing of Single Phase preventer with Phase unbalance, phase failure Phase Reversal protection relay voltage range 415V Ac 50Hz. (01 no) c) Providing and fitting of new Voltmeter & Ampere meter (0-500) of reputed make (01 no each.). d) Providing and fitting of new fuse set of reputed make as per sample. e) Replacement of damaged copper control wiring of ATS including cable ties, connections, tapping and insulation as per requirement. old scrap parts amount already deducted. After completion of work the starter should be tested on full load.
Repairs to 800 Amp ACB 03 pole unit no.01 of lift irrigation scheme Ijara by way of disconnecting the pvc cables of the starter from the ACB, opening nuts & bolts then remove it from panel & shifted it to working place with the help of skilled labour, then overhaul ACB at site by way of p/f of new moving and fixed arcing contact, main spring and shunt release, racking handle after proper repairs fitted it back to panel tighting nuts & bolts, & tested it on full load after connecting connections properly with the help of skilled labour. Old scrap parts amount already deducted. After completion of work the ACB should be tested on full load.
Asif Engineering Works
M/s SAJID ENGINEERING WORKS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .