Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-AOC | ₹1.4 L Quoted ₹1.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.5 L+₹1,522 (1.02%)Rejected-Finance 171 KATWA ROAD P O DIST BURDWAN | BURDWAN | BURDWAN | WEST BENGAL | ₹1.5 L+₹1,522 (1.02%) | L2 | Rejected-Finance L2 bidder |
| 3 | L3₹1.6 L+₹7,695 (5.17%)Rejected-Finance | ₹1.6 L+₹7,695 (5.17%) | L3 | Rejected-Finance L3 bidder |
| 4 | L4₹1.7 L+₹16,290.50 (10.9%)Rejected-Finance | ₹1.7 L+₹16,290.50 (10.9%) | L4 | Rejected-Finance L4 bidder |
| Sl No | Description | Qty | Unit | SEKH AJIM L1 | KABIR CHOUDHURY L3 | CHOUDHURY ENTERPRISE L2 | ABDUL HAFIZ CHOWDHURY L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | M.S. ( structural works in columns, beams etc. with simple rolled structural members …………………..including all incidental charges such as electricity charges, labour insurance charges etc. ) For structural members of specified sections weighing less than 22.5 Kg./m P.W.D. SOR Bldg. w.e.f 1/11/2017 p. no-99, item no-1 & P.No-84 item no:-01 3rd Corrigendum ) | 0.45 | MT | 72,500 ₹32,625 Lowest | 72,650 ₹32,692.5 | 72,550 ₹32,647.5 | 80,000 ₹36,000 |
| 2.00 | Supplying ,nitting ,fixing ( Chain link fencing of approved quality with R.C.C posts wooden posts or iron posts by means of galvanised "C" clips to grid of horizontal strands of galvanised high tensile spring steel wire of 12 S.W.G which have to be tensioned and fixed to the vertical posts by means of galvanised special clips, bolts and nuts etc P.W.D. SOR Bldg. w.e.f 1/11/2017 p. no-22 item no:-11 (IV) ) | 150 | M2 | 380 ₹57,000 Lowest | 400 ₹60,000 | 381 ₹57,150 | 450 ₹67,500 |
| 3.00 | Priming one coaton steel ( or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. P.W.D. SOR Bldg. w.e.f 1/11/2017 p. no-200 ) | 175 | M2 | 30 ₹5,250 Lowest | 32 ₹5,600 | 30 ₹5,250 Lowest | 40 ₹7,000 |
| 4.00 | Labour for fitting ( Labour for fitting wove wire or similar fencing net tightening and fixing the same to post with staples at every bar (including the cost of cutting and lapping joints in the net, the cost of staples, binding wire etc. and of labour for fixing such staples as necessary) P.W.D. SOR Bldg. w.e.f 1/11/2017 p. no-220 (a) Net upto 1350 mm. height ) | 25 | Mtr | 35 ₹875 | 38 ₹950 | 35 ₹875 | 9 ₹225 Lowest |
| 5.00 | Labour for fitting ( wove wire or similar fencing net tightening and fixing the same to post with staples at every bar (including the cost of cutting and lapping joints in the net, the cost of staples, binding wire etc. and of labour for fixing such staples as necessary) P.W.D. SOR Bldg. w.e.f 1/11/2017 p. no-220 Net above 1350 mm. height ) | 25 | Mtr | 35 ₹875 | 39 ₹975 | 37 ₹925 | 12 ₹300 Lowest |
| 6.00 | Supplying 7 ply galvanised ( strand wire 19 gauge fitted and fixed complete with necessary eyes, hooks and straining bolts (excluding the cost of straining bolts.) P.W.D. SOR Bldg. w.e.f 1/11/2017 p. no-221 ) | 155 | Mtr | 35 ₹5,425 Lowest | 37 ₹5,735 | 36 ₹5,580 | 40 ₹6,200 |
| 7.00 | Painting with best quality synthetic ( Enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary b) On steel or other metal surface : With super gloss (hi-gloss) - Two coats (white in shade) P.W.D. SOR Bldg. w.e.f 1/11/2017 p. no-200 ) | 165 | M2 | 69.3 ₹11,434.5 Lowest | 75 ₹12,375 | 70 ₹11,550 | 70 ₹11,550 |
| 8.00 | welding in MS structural work ( with gas or electric: (a) Tack weld P.W.D. SOR Bldg. w.e.f 1/11/2017 p. no-111 ) | 365 | Piece | 9 ₹3,285 Lowest | 12 ₹4,380 | 10 ₹3,650 | 9 ₹3,285 Lowest |
| 9.00 | welding in MS structural work ( Continuous weld P.W.D. SOR Bldg. w.e.f 1/11/2017 p. no-111 ) | 69 | CM | 9 ₹621 Lowest | 12 ₹828 | 10 ₹690 | 9 ₹621 Lowest |
| 10.00 | Making one set of scaffolding ( only for replacing glass panels, painting<(>,<)> uprooting plant and another repairing works of building and S&P works for external works only with 10 cm. dia bamboo as main posts at the rate of 1 metre centre to centre and 7.5 cm. dia bamboo ties @ 0.75 metre apart fitting and fixing with necessary coir, nails etc. as per direction of the Engineer-incharge. (This item should be executed only after prior approval of the Engineer-incharge). Firstly, one number to be paid and then labour rate for shifting up to further nineteenth (19) times @ 10% each time to be considered. If necessary further after twenty times of total use, another one number new and labour rate for shifting to be considered accordingly. P.W.D. SOR Bldg. w.e.f 1/11/2017 p. no-23 3.90 metre height ) | 15 | EA | 260 ₹3,900 Lowest | 270 ₹4,050 | 265 ₹3,975 | 300 ₹4,500 |
Tender Value
Refer Docs
EMD Value
₹2,618
Closing Date
13 Feb 2026, 5:00 pmClosed
The General Manager,BKTPS
Bakreswar Thermal Power Project P.O. - BkTPP, District - Birbhum Pin - 731104
Repair of damaged part of covering net at SILO peripheral area, BKTPS
2026_WBPDC_994990_1
WBPDCL/BKTPP/NIT/E4064/25-26
Limited
Miscellaneous Services
Item Rate
90 days
at Bakreswar Thermal Power Project
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2,618
Yes
9 May 2026
30 Jan 2026
16 Feb 2026
30 Jan 2026
13 Feb 2026
30 Jan 2026
M.S. ( structural works in columns, beams etc. with simple rolled structural members …………………..including all incidental charges such as electricity charges, labour insurance charges etc. ) For structural members of specified sections weighing less than 22.5 Kg./m P.W.D. SOR Bldg. w.e.f 1/11/2017 p. no-99, item no-1 & P.No-84 item no:-01 3rd Corrigendum )
Supplying ,nitting ,fixing ( Chain link fencing of approved quality with R.C.C posts wooden posts or iron posts by means of galvanised "C" clips to grid of horizontal strands of galvanised high tensile spring steel wire of 12 S.W.G which have to be tensioned and fixed to the vertical posts by means of galvanised special clips, bolts and nuts etc P.W.D. SOR Bldg. w.e.f 1/11/2017 p. no-22 item no:-11 (IV) )
Priming one coaton steel ( or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. P.W.D. SOR Bldg. w.e.f 1/11/2017 p. no-200 )
Labour for fitting ( Labour for fitting wove wire or similar fencing net tightening and fixing the same to post with staples at every bar (including the cost of cutting and lapping joints in the net, the cost of staples, binding wire etc. and of labour for fixing such staples as necessary) P.W.D. SOR Bldg. w.e.f 1/11/2017 p. no-220 (a) Net upto 1350 mm. height )
Labour for fitting ( wove wire or similar fencing net tightening and fixing the same to post with staples at every bar (including the cost of cutting and lapping joints in the net, the cost of staples, binding wire etc. and of labour for fixing such staples as necessary) P.W.D. SOR Bldg. w.e.f 1/11/2017 p. no-220 Net above 1350 mm. height )
Supplying 7 ply galvanised ( strand wire 19 gauge fitted and fixed complete with necessary eyes, hooks and straining bolts (excluding the cost of straining bolts.) P.W.D. SOR Bldg. w.e.f 1/11/2017 p. no-221 )
Painting with best quality synthetic ( Enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary b) On steel or other metal surface : With super gloss (hi-gloss) - Two coats (white in shade) P.W.D. SOR Bldg. w.e.f 1/11/2017 p. no-200 )
welding in MS structural work ( with gas or electric: (a) Tack weld P.W.D. SOR Bldg. w.e.f 1/11/2017 p. no-111 )
welding in MS structural work ( Continuous weld P.W.D. SOR Bldg. w.e.f 1/11/2017 p. no-111 )
Making one set of scaffolding ( only for replacing glass panels, painting<(>,<)> uprooting plant and another repairing works of building and S&P works for external works only with 10 cm. dia bamboo as main posts at the rate of 1 metre centre to centre and 7.5 cm. dia bamboo ties @ 0.75 metre apart fitting and fixing with necessary coir, nails etc. as per direction of the Engineer-incharge. (This item should be executed only after prior approval of the Engineer-incharge). Firstly, one number to be paid and then labour rate for shifting up to further nineteenth (19) times @ 10% each time to be considered. If necessary further after twenty times of total use, another one number new and labour rate for shifting to be considered accordingly. P.W.D. SOR Bldg. w.e.f 1/11/2017 p. no-23 3.90 metre height )
Making one set of scaffolding ( only for replacing glass panels, painting<(>,<)> uprooting plant and another repairing works of building and S&P works for external works only with 10 cm. dia bamboo as main posts at the rate of 1 metre centre to centre and 7.5 cm. dia bamboo ties @ 0.75 metre apart fitting and fixing with necessary coir, nails etc. as per direction of the Engineer-incharge. (This item should be executed only after prior approval of the Engineer-incharge). Firstly, one number to be paid and then labour rate for shifting up to further nineteenth (19) times @ 10% each time to be considered. If necessary further after twenty times of total use, another one number new and labour rate for shifting to be considered accordingly. P.W.D. SOR Bldg. w.e.f 1/11/2017 p. no-23 b) Extra for additional 3.6 height or part thereof )
Supplying of un-skilled worker ( for refixing New Cotton cloth Memo No.: BkTPP/HR&A/CL/63/2591 Date: 23.06.25 397 + PF (13%) +Bonus (8.33%) +ESIC (3.25%) = Rs. 494.58 )
GST extra as applicable
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_2435602.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .