Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.3 LAdmitted-Fee/PreQual/Technical/Finance | ₹40.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹40.6 L+₹36,653.50 (0.91%)Admitted-Fee/PreQual/Technical/Finance | ₹40.6 L+₹36,653.50 (0.91%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹41.2 L+₹96,175 (2.39%)Admitted-Fee/PreQual/Technical/Finance | ₹41.2 L+₹96,175 (2.39%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹41.7 L+₹1.4 L (3.60%)Admitted-Fee/PreQual/Technical/Finance | ₹41.7 L+₹1.4 L (3.60%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹45.4 L+₹5.2 L (12.9%)Admitted-Fee/PreQual/Technical/Finance | ₹45.4 L+₹5.2 L (12.9%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Himgiri Associates L6 | Mohd Yunus Ansari L2 | M/s Hindustan Construction L3 | M/s Riyanshi Contractor, Prop. Naveen Kumar L4 | Dheeru Bhai Construction L5 | shri contractor L1 | KURBAN CONSTRUCTION L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Gravel/Soil-Aggregate Base (Table 400.2) Grading A Construction of gravel/soil-aggregate base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller to achieve the desired density, complete as per Technical Specifications Clause 402 | 562.5 | Cum | 975 ₹5,48,437.5 | 689 ₹3,87,562.5 | 400 ₹2,25,000 Lowest | 800 ₹4,50,000 | 800 ₹4,50,000 | 497 ₹2,79,562.5 | 900 ₹5,06,250 |
| 2.00 | WBM Grading 2 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. | 281.25 | Cum | 1,375 ₹3,86,718.75 | 653 ₹1,83,656.25 Lowest | 1,200 ₹3,37,500 | 882 ₹2,48,062.5 | 1,400 ₹3,93,750 | 997 ₹2,80,406.25 | 1,300 ₹3,65,625 |
| 3.00 | WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. | 281.25 | Cum | 1,375 ₹3,86,718.75 | 1,771 ₹4,98,093.75 | 1,200 ₹3,37,500 | 1,200 ₹3,37,500 | 1,200 ₹3,37,500 | 997 ₹2,80,406.25 Lowest | 1,300 ₹3,65,625 |
| 4.00 | Interlocking Concrete Block PavementProviding and Laying of Interlocking Concrete Block (M-35) Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504. | 3,450 | Sqm | 480 ₹16,56,000 | 569 ₹19,63,050 | 460 ₹15,87,000 Lowest | 590 ₹20,35,500 | 580 ₹20,01,000 | 527 ₹18,18,150 | 500 ₹17,25,000 |
| 5.00 | Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing ofsides and bottom and backfilling in trenches with excavated suitable material. | 456 | Cum | 125 ₹57,000 | 20 ₹9,120 | 50 ₹22,800 | 27 ₹12,312 | 50 ₹22,800 | 10 ₹4,560 Lowest | 100 ₹45,600 |
| 6.00 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:3:6 | 114 | Cum | 2,500 ₹2,85,000 | 1,500 ₹1,71,000 | 3,500 ₹3,99,000 | 1,688 ₹1,92,432 | 2,500 ₹2,85,000 | 1,497 ₹1,70,658 Lowest | 3,500 ₹3,99,000 |
| 7.00 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (M - 20) | 86 | Cum | 2,500 ₹2,15,000 | 2,186 ₹1,87,996 Lowest | 3,500 ₹3,01,000 | 2,200 ₹1,89,200 | 3,500 ₹3,01,000 | 2,997 ₹2,57,742 | 4,000 ₹3,44,000 |
| 8.00 | Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 In 1:4 Cement mortar | 198 | Cum | 5,500 ₹10,89,000 | 3,100 ₹6,13,800 Lowest | 4,000 ₹7,92,000 | 3,200 ₹6,33,600 | 3,500 ₹6,93,000 | 4,130 ₹8,17,740 | 5,000 ₹9,90,000 |
| 9.00 | Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 | 1,200 | Sqm | 169 ₹2,02,800 | 40 ₹48,000 Lowest | 100 ₹1,20,000 | 60 ₹72,000 | 50 ₹60,000 | 97 ₹1,16,400 | 120 ₹1,44,000 |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
22 Jul 2026, 2:30 pmClosed
EE, PD, PWD, Haridwar
EE, PD, PWD, Haridwar
Construction of roads with drain by interlocking tiles in various colonies in Salempur-2 in constituency Jwalapur Distt. Haridwar under State Sector 2026-27 (Job 4)
2026_pwd_97418_4
1536/2A Dated 19.06.2026
Open Tender
Civil Works - Roads
Item Rate
90 days
Haridwar
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
EE, PD, PWD, Haridwar (through E-Challan)
₹1.5 L
4 Aug 2026
9 Jul 2026
22 Jul 2026
9 Jul 2026
22 Jul 2026
16 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Gravel/Soil-Aggregate Base (Table 400.2) Grading A Construction of gravel/soil-aggregate base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller to achieve the desired density, complete as per Technical Specifications Clause 402 | 562.5 | Cum | - | - |
| 2 | WBM Grading 2 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. | 281.25 | Cum | - | - |
| 3 | WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. | 281.25 | Cum | - | - |
| 4 | Interlocking Concrete Block PavementProviding and Laying of Interlocking Concrete Block (M-35) Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504. | 3,450 | Sqm | - | - |
| 5 | Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing ofsides and bottom and backfilling in trenches with excavated suitable material. | 456 | Cum | - | - |
| 6 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:3:6 | 114 | Cum | - | - |
| 7 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (M - 20) | 86 | Cum | - | - |
| 8 | Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 In 1:4 Cement mortar | 198 | Cum | - | - |
| 9 | Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 | 1,200 | Sqm | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
TC_Tiles_CC.pdf
Tender Documents • 0.28 MB
BOQ_115097.xls
BOQ • 0.27 MB
Corrigendum_Name_BHEL.pdf
PDF • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .