| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAdmitted-Finance | ₹3.5 L | L1 | Admitted-Finance |
| 2 | L2₹4.2 LAdmitted-Finance NO 3B 85 AK ILLAM UPPLIPALAYAM POST SINGANALLUR COIMBATORE TAMIL NADU 641015 UDYAM TN 03 0038134 33CFZPD6716A1ZJ R S MSME STATUS AS VERIFIED | COIMBATORE | TAMIL NADU | 641015 | ₹4.2 L | L2 | Admitted-Finance |
| 3 | L3₹4.2 LAdmitted-Finance | ₹4.2 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | D K SOLUTIONS L2 | RAGHAVENDRA C L1 | SM ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.00Siva Temple, Avittathur | ||||||
| 1.01 | Carefully removing the fallen compound/ prakara wall of laterite masonry in the North eastern side of compound wall of Siva Temple, Avittathur and stacking useful laterite stones for reuse and clearing unwanted debris away from the site, including all labourer and material cost as per the direction of work in charge. | 15.65 | Cum. | 12,332.2 ₹14,552 | 25,040 ₹29,547.20 | 13,928.5 ₹16,435.63 |
| 1.02 | Carefully dismantling leaned/ damaged/ out of plumb/ internally separated portion of the laterite compound wall and stacking useful laterite stone properly for re-use and disposing of unwanted materials away from the site, including all labourer and material cost as per the direction of work in charge. | 9.53 | Cum. | 10,168.51 ₹11,998.84 | 14,295 ₹16,868.10 | 10,483 ₹12,369.94 |
| 1.03 | Restoration of the Laterite masonry foundation and superstructure using neatly dressed laterite stone of 80 % New and 20 % Old available, as per the existing pattern in Lime Mortal 1:2, including all labourer and material cost as per the direction of work in charge. (Drawing enclosed) | 21.19 | Cum. | 2,47,732.29 ₹2.9 L | 1,37,735 ₹1.6 L | 2,54,280 ₹3.0 L |
| 1.04 | Providing copping using special laterite stone as per the existing pattern (Drawing enclosed) 80 % New and 20 % Old available including all labourer and material cost, and scaffolding charges as per the direction of work in charge. | 3.68 | Cum. | 49,002.88 ₹57,823.40 | 34,960 ₹41,252.80 | 46,000 ₹54,280 |
| 1.05 | Pointing the masonry joints with lime mortar 1: 2 after thoroughly cleaning the joints and curing including all material and labour charge as per the direction of work in charge. | 69.7 | Sq.M | 37,638 ₹44,412.84 | 87,125 ₹1.0 L | 33,804.5 ₹39,889.31 |
Tender Value
₹3.8 L
Closing Date
5 Mar 2026, 10:00 amClosed
The Superintending Archaeologist
Office of the Superintending Archaeologist, Archaeological Survey of India, Thrissur Circle, Puratattva Bhavan, FF 19 (a), KSHB Flats, Pullazhy, Thrissur-680 012
MCEW AM and UK To Siva Temple Avittathur For 2025-26 under Archaeological Survey of India, Thrissur Circle
2026_ASI_899989_1
47/TCR-KL/2025-26
Open Tender
Civil Works
25 days
Siva Temple Avittathur
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
Exempted
8 May 2026
24 Feb 2026
6 Mar 2026
24 Feb 2026
5 Mar 2026
24 Feb 2026
Siva Temple, Avittathur
Carefully removing the fallen compound/ prakara wall of laterite masonry in the North eastern side of compound wall of Siva Temple, Avittathur and stacking useful laterite stones for reuse and clearing unwanted debris away from the site, including all labourer and material cost as per the direction of work in charge.
Carefully dismantling leaned/ damaged/ out of plumb/ internally separated portion of the laterite compound wall and stacking useful laterite stone properly for re-use and disposing of unwanted materials away from the site, including all labourer and material cost as per the direction of work in charge.
Restoration of the Laterite masonry foundation and superstructure using neatly dressed laterite stone of 80 % New and 20 % Old available, as per the existing pattern in Lime Mortal 1:2, including all labourer and material cost as per the direction of work in charge. (Drawing enclosed)
Providing copping using special laterite stone as per the existing pattern (Drawing enclosed) 80 % New and 20 % Old available including all labourer and material cost, and scaffolding charges as per the direction of work in charge.
Pointing the masonry joints with lime mortar 1: 2 after thoroughly cleaning the joints and curing including all material and labour charge as per the direction of work in charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
1.pdf
Tender Documents • 17.57 MB
BOQ_945983.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid