Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAccepted-Finance | ₹3.5 L | L1 | Accepted-Finance First Lowest |
| 2 | L2₹4.2 L+₹68,108.28 (19.3%)Rejected-Finance 0 DHULJI KI DHANI DESURIYAN VISHNOIYAN SURPURA JODHPUR JODHPUR RAJASTHAN 342304 | JODHPUR | RAJASTHAN | 342304 | ₹4.2 L+₹68,108.28 (19.3%) | L2 | Rejected-Finance Second Lowest |
| 3 | L3₹4.2 L+₹70,022.38 (19.8%)Rejected-Finance | ₹4.2 L+₹70,022.38 (19.8%) | L3 | Rejected-Finance Third Lowest |
| Sl No | Description | Qty | Unit | D K SOLUTIONS L2 | RAGHAVENDRA C L1 | SM ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.00Siva Temple, Avittathur | ||||||
| 1.01 | Carefully removing the fallen compound/ prakara wall of laterite masonry in the North eastern side of compound wall of Siva Temple, Avittathur and stacking useful laterite stones for reuse and clearing unwanted debris away from the site, including all labourer and material cost as per the direction of work in charge. | 15.65 | Cum. | 12,332.2 ₹14,552 Lowest | 25,040 ₹29,547.2 | 13,928.5 ₹16,435.63 |
| 1.02 | Carefully dismantling leaned/ damaged/ out of plumb/ internally separated portion of the laterite compound wall and stacking useful laterite stone properly for re-use and disposing of unwanted materials away from the site, including all labourer and material cost as per the direction of work in charge. | 9.53 | Cum. | 10,168.51 ₹11,998.84 Lowest | 14,295 ₹16,868.1 | 10,483 ₹12,369.94 |
| 1.03 | Restoration of the Laterite masonry foundation and superstructure using neatly dressed laterite stone of 80 % New and 20 % Old available, as per the existing pattern in Lime Mortal 1:2, including all labourer and material cost as per the direction of work in charge. (Drawing enclosed) | 21.19 | Cum. | 2,47,732.29 ₹2,92,324.1 | 1,37,735 ₹1,62,527.3 Lowest | 2,54,280 ₹3,00,050.4 |
| 1.04 | Providing copping using special laterite stone as per the existing pattern (Drawing enclosed) 80 % New and 20 % Old available including all labourer and material cost, and scaffolding charges as per the direction of work in charge. | 3.68 | Cum. | 49,002.88 ₹57,823.4 | 34,960 ₹41,252.8 Lowest | 46,000 ₹54,280 |
| 1.05 | Pointing the masonry joints with lime mortar 1: 2 after thoroughly cleaning the joints and curing including all material and labour charge as per the direction of work in charge. | 69.7 | Sq.M | 37,638 ₹44,412.84 | 87,125 ₹1,02,807.5 | 33,804.5 ₹39,889.31 Lowest |
Tender Value
₹3.8 L
Closing Date
5 Mar 2026, 10:00 amClosed
The Superintending Archaeologist
Office of the Superintending Archaeologist, Archaeological Survey of India, Thrissur Circle, Puratattva Bhavan, FF 19 (a), KSHB Flats, Pullazhy, Thrissur-680 012
MCEW AM and UK To Siva Temple Avittathur For 2025-26 under Archaeological Survey of India, Thrissur Circle
2026_ASI_899989_1
47/TCR-KL/2025-26
Open Tender
Civil Works
Works
25 days
Siva Temple Avittathur
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
Exempted
22 Jul 2026
24 Feb 2026
6 Mar 2026
24 Feb 2026
5 Mar 2026
24 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Siva Temple, Avittathur | |||||
| 1.01 | Carefully removing the fallen compound/ prakara wall of laterite masonry in the North eastern side of compound wall of Siva Temple, Avittathur and stacking useful laterite stones for reuse and clearing unwanted debris away from the site, including all labourer and material cost as per the direction of work in charge. | 15.65 | Cum. | 720.33 | ₹11,273.16 |
| 1.02 | Carefully dismantling leaned/ damaged/ out of plumb/ internally separated portion of the laterite compound wall and stacking useful laterite stone properly for re-use and disposing of unwanted materials away from the site, including all labourer and material cost as per the direction of work in charge. | 9.53 | Cum. | 974.57 | ₹9,287.65 |
| 1.03 | Restoration of the Laterite masonry foundation and superstructure using neatly dressed laterite stone of 80 % New and 20 % Old available, as per the existing pattern in Lime Mortal 1:2, including all labourer and material cost as per the direction of work in charge. (Drawing enclosed) | 21.19 | Cum. | 10,677.96 | ₹2,26,265.97 |
| 1.04 | Providing copping using special laterite stone as per the existing pattern (Drawing enclosed) 80 % New and 20 % Old available including all labourer and material cost, and scaffolding charges as per the direction of work in charge. | 3.68 | Cum. | 12,161.01 | ₹44,752.52 |
| 1.05 | Pointing the masonry joints with lime mortar 1: 2 after thoroughly cleaning the joints and curing including all material and labour charge as per the direction of work in charge. | 69.7 | Sq.M | 493.22 | ₹34,377.43 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
1.pdf
Tender Documents • 17.57 MB
BOQ_945983.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .