ADDITIONAL CITY ENGINNER - SOUTH ZONE (AMC)
Work of constructing footpaths on both sides of the road from Punitnagar to Durganagar under Amrut Station, as well as constructing footpaths at various other locations Lambha area in Vatva Ward of the South Zone. (A.R.C.)
350975
E Tender Notice 06/2026-27 Tender no 431
Open
Civil - All
Works
Ahmedabad
₹3,600
Municipal Commissioner, Ahmedabad
₹1.5 L
1 Oct 2026
1 Oct 2026
1 Oct 2026
12 Oct 2026
1 Oct 2026
2 TOTAL ESTIMATED COST - ₹
3 EARNEST MONEY - ₹
In DEMAND DRAFT FROM
BANK ACCEPTABLE TO THE AMC
4 VALIDITY PERIOD - 120 DAYS FROM THE DATE OF
OPENING OF THE TENDER.
5 SECURITY DEPOSIT - 5% OF SANCTIONED TENDER AMOUNT
IN FORM OF CASH / DEMAND DRAFT /
BANK GUARANTEE.
6 RETENTION MONEY - 2% FROM EACH RUNNING BILL WILL BE
RETAINED AND WILL BE RELEASED
AT THE TIME OF FINAL BILL
7 TIME ALLOWED FOR
COMPLETION OF THE WORK - 12 Months
FROM THE DATE OF WRITTEN
ORDER TO COMMENCE WORK
8 TENDER FEE Rs. -- - ₹ 3600 TENDER CLASS -- C
In DEMAND DRAFT
BANK ACCEPTABLE TO THE AMC
Contractor's Name :-
Contractor's Address :-
Contractor's Register Number / Renewal Year / class :-
Contractor's Bank, Branch Name :-
Bank Account Number :- Banks MICR Number-
8 DOWN LOAD DATES FOR AS PER TENDER NOTICE
TENDER FROM WEB SITE -
9 DATE ON OR BEFORE WHICH
THE TENDER MUST REACH
THE OFFICE - AS PER TENDER NOTICE
10 OPENING DATE OF THE
TENDER BY THE OFFICE - AS PER TENDER NOTICE
11 LOCAL COMPETITIVE BIDDING
-- TENDER CLASS -- C
12 MODE OF SENDING THE - IN SEALED COVER BY REGISTERED
TENDER POST OR IN PERSON.
TENDER SENT BY ORDINARY POST
WILL BE REJECTED OUTRIGHT.
CONDITIONAL TENDER WILL BE
REJECTED OUTRIGHT.
13 DESCRIPTION ESSENTIAL TO - NAME OF THE WORK.
BE MADE ON SEALED COVER TENDER No.--
DATE OF RECEIVING TENDER BY
14 MODE OF QUOTING RATES IN - PERCENTAGE RATE IN FIGURES AS
SCHEDULES OF RATES. WELL AS IN WORDS.
TENDER SHALL BE SUBMITTED IN
DUPLICATE.(EXCEPT E-TEDER)
15 Defect &Liability Period - The contractor shall be responsible to
make good and remedy at this own
exppence any defect which may
developed or may be noticed before
the period mentioned here under from
the certified date of complition, The
within 15 days of recipts of the notice.
In the case of failure on the part of the
contractor, the Engineer incharge may
rectfy or remove or reexecute the work
at the risk & cost of the contractore.
The Engineer incharge shall be
entitled to appropriate the whole or
any part of the amount of security
deposit towards theexpences, If any,
incurred by him in rectification,
removal or re- execution. The defect
liability period shall be as under (a)
for all works costing up to Rs.
(amount put to tender), the period
shall be three months from the cirtified
date of complition. (b) for all
workscosting more than Rs.
NAME OF WORK --
Work of constructing footpaths on both sides of the road from Punitnagar to Durganagar under
Amrut Station, as well as constructing footpaths at various other locations Lambha area in Vatva
Ward of the South Zone. (A.R.C.)
TENDER NOTICE No. -- 6 TENDER No. --
LOCAL COMPETITIVE BIDDING -- TENDER CLASS -- C
Time Limit (Months)
Issue Date AS PER Last Date of AS PER Opening AS PER
of tender --- TENDER Receiving of TENDER Date of TENDER
From - To NOTICE Tender --- NOTICE Tender- NOTICE
The Municipal Commissioner of Ahmedabad Municipal Corporation, invites Percentage
rate tender for the above works from the contractors registered with Municipal
Corporation of Ahmedabad in Class C or registered with Government of Gujarat
in Class C or from contractors registered in similar class with any other
State Government of India who have the financial capability and technical ability to
carry out the work. Also Private pre qualified reputed experience builders can also
apply. Experience in carrying out works of comparable nature is essential.
Filled up tender shall be received by Asst. Manager, SOUTH ZONE Zonal Office, Ahmedabad
Municipal Corporation, Rambag, Maninagar, Ahmedabad - 380008 on or before last date of receiving
tender with Tender Fee and E.M.D.as per information in memorandum above.
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
SPECIAL GENERAL INSTRUCTIONS TO TENDERERS
NAME OF WORK --
Work of constructing footpaths on both sides of the road from Punitnagar to Durganagar under
Amrut Station, as well as constructing footpaths at various other locations Lambha area in Vatva
Ward of the South Zone. (A.R.C.)
1 The work is to be completed in all respects within 12 months reckoned
from the date of written order to commence the work.
2 The tender shall be valid for acceptance for a period of 120 days from the date of
opening of tenders.
3 Each tender must be accompanied by a receipt for a deposit as Earnest Money
of ₹ 150000.00 in Pay order, Demand Draft, Bank Guarantee or Cheque from
bank acceptable to the AMC.
4 Tender deposit is accepted as detailed out in Ahmedabad Municipal Corporation, Section B-1,
Engineering Department, percentage Rate Tender and General condition's of Contract for Works here in
afterwards referred as Form- B-1.
5 An overall schedule of the "Work Plan "of the project based "Network Technique Method" Programmer
Evaluated and Review Technique (PERT) / Critical Path Method (CPM) for appreciating his method
of planning, scheduling and control of project execution should be submitted by the contractor.
6 After the demand of R.A. Bills by contractors, work shall be verified by the Engineer in charge of AMC or
the Architect / Consultant will give his certificate, whether the work has been executed according to the
standard norms and approved designs and the workmanship is of acceptable quality. Also the
progress of work shall be according to the construction programme approved by AMC or the Architect
/Consultant. On recommandations of Engineer in charge of AMC or Architect / consultant , R.A. Bills will
processed for the payment.
7 2% FROM EACH RUNNING BILL WILL BE RETAINED AND SHALL BE RELEASED
AT TIME OF FINAL BILL
8 In the circumstances of dispute, the decision of Add. City Engineer ( Zones) shall be final & bound
for the contractor. In case, in the detailed specifications of materials and code of practice specifications
of Index Nos. are found missing thus they must be referred to the of specification of materials and code of
PAYMENT CONDITIONS TO CONTRACTOR
9 Without proper Refilling, compaction and watering no payment shall be given to contractor for
excavation, refilling and or earth filling items.
10 Contractor shall have to submit a demand letter for running bill as well as final bill..
11 If progress of work is not in proportion to the time limit, otherwise penalty will be imposed.
MATERIAL PROCUREMENT
12 All material like Cement, M. S. Bars / Tor steel reinforcement and structural steel, Bitumen etc.
required for this work shall be procured by the contractor from the open market.
13 No difference in rates of cement and steel prevailing in the market in Ahmedabad at a later date shall be
paid /Recovered by A.M.C.(as the case may be) to / from contractor for the procurement of Cement and
Steel from open market in Ahmedabad. Contractor will not be paid for any transport, handling &
storage expenses separately and he should quote for the works accordingly.
14 Test certificate for all materials like Cement , Steel, Bitumen and other important materials shall be
obtained and submitted by contractor. Contractor shall have to produce test certificates for all
procurement of Cement , Steel, Bitumen and other important materials
INSTRUCTION TO THE TENDERER
15 ALL INSTRUCTIONS TO TENDERERS, SPECIAL INSTRUCTIONS FOR
CONTRACTORS, DOCUMENTS, RULES FOR GRANT OF ADVANCES, CLAUSE FOR
ARBITRATION, GENERAL SPECIFICATIONS, PROJECT INFORMATION
GENERAL,PAYMENT CONDITION TO THE CONTRACTOR, DEFINITION OF TERMS
EARNEST MONEY, SUBMISSION OF TENDERS, GENERAL RULES AND
DIRECTIONS FOR THE GUIDANCE OF CONTRACTORS TERMS AND
CONDITIONS OF CONTRACT AS PER FORM B-1. ETC. SHALL BE AS PER STANDARD
PERFORMA OF AHMEDABAD MUNICIPAL CORPORATION OF ENGINEERING
DEPARTMENT AND SHALL BE APPLIED TO THIS TENDER CONTRACTOR MUST
HAVE THIS DOCUMENT AND SHALL BOUND FOR THE SAME.
I HAVE READ AND VERIFIED ABOVE DOCUMENT AS WELL AS P.W.D.
GENERALTECHNICAL SPECIFICATIONS , CONDITIONS, CLAUSES, INSTRUCTIONS
ETC. AND AGREE TO ABIDE BY THEM.
I HAVE ALSO GONE THROUGH CONDITIONS AND CLAUSES OF FORM B -1 AND
AGREE TO ABIDE BY THEM.
I HAVE ALSO GONE THROUGH TECHNICAL SPECIFICATIONS FOR THE ITEMS
AND AGREE TO ABIDE BY THEM.
IN THIS TENDER THERE ARE MANY POSSIBILITIES OF ADDITIONAL AND
ALTERATION ITEMS HENCE MANY ITEMS ARE LIKELY TO BE DROPPED OR THERE
QUANTITIES ARE LIKELY TO BE VARY UP TO ANY EXTENT AND HENCE FOR
THIS CONTRACTOR WILL NOT CLIAM FOR ANY EXTRA AMOUNT OR
COMPENSATION FOR THE SAME I AGREE TO ABIDE BY THEM.
GENERAL RULES & DIRECTIONS FOR THE GUIDANCE OF CONTRACTORS TERMS
AND CONDITIONS OF CONTRACT AS PER FORM B-1. ETC. SHALL BE AS PER
STANDARD PROFORMA FOR TENDER OF AHMEDABAD MUNICIPAL CORPORATION
OF ENGINEERING DEPARTMENT AND SHALL BE APPLIED TO THIS TENDER .
CONTRACTOR MUST HAVE THIS DOCUMENT.
Dated Signature Of Contractor ADD. CITY ENGINEER
With Seal SOUTH ZONE
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPPARTMENT
16 DECLARATION FORM :- TENDER No
Name of the work for which the Tender is under consideration-
Work of constructing footpaths on both sides of the road from Punitnagar to Durganagar under
Amrut Station, as well as constructing footpaths at various other locations Lambha area in Vatva
Ward of the South Zone. (A.R.C.)
1 I / We hereby declare that I / We have visited the above site & fully acquainted my self / our selves with
the local situation regarding materials, labour and other factors pertaining to the work before submitting
2 I / We hereby declare that I / We have carefully studied the conditions of contract, sections and
other tender documents of this work and agree to execute the same accordingly.
3 I / We hereby declare that I / We shall not charge any costs towards the visit of site for preparing the
tender for submission accordingly.
4 I / We hereby declare that My / Our near relatives are not working in A.M.C. as City Engineer, Add.
City Engineer, Dy. City Engineer, Asst. City Engineer, Assistant Engineer, Add. Assistant
Engineer, Technical Supervisor, Assistant Manager, Accountant, Store Keeper or any such category. If
yes, then, the names should be submitted.
Dated Signature Of Contractor
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPPARTMENT
GENERAL SPECIFICATION
1 The work shall be completed with in 12 months time limit.
2 The details of reinforcement of R.C.C. work shall be as per design and instruction of Add. City
Engineer or his representative and his order will be considered final. The contractor shall have to
maintain account of steel, cement and other materials, that may be brought by him on site. This account
shall be regularly maintained and kept open for inspection by municipal staff. Watering of all the
items shall be done as per instructions. Mixing of concrete shall be done by concrete mixer machine.
3 Arrangements of bringing vibrator for R.C.C. works if required shall have to be made by the contractor
othervise concrete work shall not be allowed.
4 The contractor shall remain responsible for workman's compensation of any accident that may occur. The
contractor shall arrange for lights at night and fencing and security guard and shall be responsible for
any damage of life and property if any happen, during the execution of work in case of dispute for unseen
or over looked items, the decision of the Add. City Engineer or his representative shall be final. The
contractor shall have to clean all rubbish on completion of work and hand over the building with
final finishing as directed. All the rejected materials shall be removed from site with in 24 hours by
contractor at his risk and cost.
5 For mixing mortar either for masonry or for plaster; or for any other purpose contractor shall have to
prepare trough of bigger size and mix the mortar in the required proportion in case he shall be
allowed to mix the mortar either on solid floor or any finish surfaces.
6 The contractor shall have to make his own arrangement for water required for the work
7 If any extra item crops up during the progress of work, the same shall be carried out by the contractor and
he shall be paid at the rate fixed by Add. City Engineer or his representative as per the rate analysis
based on current market rates and as per prevailing circular of AMC..
8 If in the interest of the Corporation it is necessary to change either any site or the design of the proposed
work, the contractor shall carry out the same at his quoted rates without charging any extra and the
contractor will have to carry out the works and he will be paid at the rates quoted by him in the tender
and no claim for extra charges entertained.
9 The cubical contents of the cement bag shall be taken as 1.25 cft. or 0.035 cmt. / bag and the contractor
shall have to prepare the measure box according to this measures.
10 Retention money at the rate of 2% shall be deducted from every running bill of the contractor and which
will be paid at the time of final bill.
11 Contractor will be fully responsible for compliance of the various provision under contract Act.
1970 and rules framed there under.
12 The tender for the work shall remain valid for a period of 120 days from the date of
opening of the tenders for this work and that the Tenderer shall not be allowed to withdraw or
modify the offer on his own during this period. If any Tenderer withdraws or makes any, modifications or
additions in the terms and conditions of tender. His tender will not be acceptable to the Municipal
Corporation. The Municipal Corporation ,without prejudice to any right or remedy be at liberty to forfeit
the Earnest Money Deposit.
13 No Materials shall be supplied by A.M.C. The contractor have to make their own arrangement for
procurement of materials from open market. But the contractor shall have to give necessary test
certificates for different materials as per relevant I.S. code before using the same in the work at his cost
in presence of AMC Engineers..
14 As per circular No MGR 2176(96),2418 (ii)GHH dated 31-3-77 issued by Government of Gujarat
contractors are requested to procure their quarry materials required for construction work through
legal sources i.e. Only from the quarry lease. holders permit holder or middleman who satisfies the
contractor as the legality of the source of purchase by him on these materials.
15 If the work is not carried out within the specified time limit 12 months from the date
order to start the work. Penalty shall be recovered at the rate of 10% on the amount of the non
completion of the remaining work for delay in allotted,/ extended time limit and shall be recovered
from the immediate bills payable to the Contractor.
16 The contractor shall have to take labour License of the work as per Labour act. The contractor shall
have to follow Child Labour act. The Tenders are to be submitted in duplicate except E-Tender
without which the tenders are liable to be rejected. Conditional tender will not be accepted.
Dated Signature Of Contractor ADD. CITY ENGINEER
With Seal SOUTH ZONE
TECHNICAL SPECIFICATIONS FOR MATERIALS AND ITEMS
NAME OF WORK -- Tender No.
Work of constructing footpaths on both sides of the road from Punitnagar to Durganagar under
Amrut Station, as well as constructing footpaths at various other locations Lambha area in Vatva
Ward of the South Zone. (A.R.C.)
GENERAL AND STANDARD TECHNICAL SPECIFICATIONS FOR WORK.
1 In the specifications “as directed” / “ approved shall be taken to means "'directed” / “approved” by the
Engineer-in-charge.
2 Wherever a reference to any Indian Standard appears in the specifications, it shall be taken to mean as a
reference to the latest edition of the same inforce on the date of agreement.
3 In“Mode of Measurement”in the specification wherever a dispute arises in the absence of specific mention
of a particular point or aspect, the provisions on these particular points or aspects in the relevant Indian
Standards shall be referred to.
4 All measurements and computations, unless otherwise specified, shall be carried out nearest to the
following limits:
(i) Length, width and depth (height) 0.01 meter.
(ii) Areas 0.01 Sq. Mt.
(iii) Cubic Contents 0.01 Cu. Mt.
In recording dimensions of work, the sequence of length, width, and height (depth) or
thickness shall be followed.
5 The distance which constitutes lead shall be determined along the shortest practical route and note
necessarily the route actually taken. The decision of the Engineer-in-charge in this regard
shall be taken as final.
6 Where no lead is specific, it shall mean “all leads".
7 Lift shall be measured from plinth level.
8 Up to “floor two level” means actual height of floor (Maxi. 4 M) up to 3 Mt. Above plinth level.
9 Definite particulars covered in the items of work, though not mentioned or included in it specifications
shall be deemed to be included therein.
10 Reference to specifications of Materials as made in the detailed specification of the items of works is
in the form of a designation containing them number of the specification of the Materials and
prefix ‘M’ e.g. "M-5"
11 Approval to the samples of various Materials given by the Engineer in charge shall not absolve the
contractor from the responsibility of replacing defective Materials brought on site or Materials used in
the work found defective at later date. The contractor shall have no claim to any payment or
compensation whatsoever on accounts any such Materials being rejected by the Engineer-in-charge.
12 The contract rate of the item of work shall be for the work completed in all aspects.
13 No collection of Materials shall be made on site before it is got approved from the Engineer-in-
14 Collection of approved Materials shall be done at site of work in a systematic manner. Materials shall be
stored in such manner as to prevent damage ,deterioration of intrusion of foreign matter and to ensure
the preservation of their quality and fitness for the work.
15 Materials , if and when rejected by the Engineer - in - charge, shall be immediately removed from the
16 No Materials shall be stored prior to, during and after execution of a structure in such a way as to cause or
lead to damage or overloading of the various components of the structure.
17 All works shall be carried out in a workman like manner as per the best techniques for the particular item.
18 All tools, templates, machinery and equipment for correct execution of the work as well as for checking
lines, levels, alignment of the work during execution shall kept in sufficient numbers and in good
working condition on the site of the work.
19 The mode, procedure and manner of execution shall be such that it does not cause damage or
overloading of the various components of the structure during execution or after completion of the
20 Special modes of construction not adopted in general Engineering practice, if proposed to be
adopted by the Contractor, shall be considered only if the contractor provides satisfactory evidence that
such special mode of construction is safe, sound and helps in speedy construction and completion of
work to the required strength and quality. Acceptance of the same by the Engineer- in- charge shall not,
however, absolve the contractor of the responsibility of any adverse effects and consequence of adopting
here in the course of execution or completion of the work.
21 All installations pertaining to water supply and fixtures thereof as well as drainage lines and sanitary
fittings shall be deemed to be completed only after giving satisfactory tests by the contractor.
22 The contractor shall be responsible for observing the rules and regulations imposed under the “ Minor
Minerals Act ”, and such other laws and rules prescribed by Government from time to time.
23 All necessary safety measures and precautions (including those laid down in the various relevant
Indian Standards) shall be taken to ensure the safety of men, Materials and machinery on the works as also
of the work itself.
24 The testing charges of all Materials shall be borne by the Contractor.
25 Approval to any of the executed items for the work does not in any way relieve the contractor of
his responsibility for the correctness, soundness and strength of the structure as per the drawings and
specifications.
26 I HAVE ALSO GONE THROUGH TECHNICAL SPECIFICATION FOR THE ITEMS AS PER
STANDARD P.W.D. TECHNICAL SPECIFICATION FOR THE ITEMS AND AGREE TO
ABIDE BY THEM. (ALSO AVAILABLE ON AMC WEB SITE)
27 IN CASE OF WHERE THERE IS NO TECHNICAL SPECIFICATION FOR THE ANY ITEMS
AVAILABLE, SPECIFICATION GIVEN BY THE ENGINEER IN CHARGE SHALL BE
FOLLOWED. AND FOR THE SAME I AGREE TO ABIDE BY THEM.
Dated Signature Of Contractor ADD. CITY ENGINEER
With Seal SOUTH ZONE
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPPARTMENT
SUMMARY OF COST AND
SCHEDULE OF QUANTITIES AND RATES
_ SUMMARY OF COST AND RECAPITULATION SHEET
_ SCHEDULE OF QUANTITIES & RATES
PAGE -- 1 of 2 SHEDULE
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPPARTMENT
1 The schedule of quantities and rates are to be read for the purpose of pricing in conjunction with
instructions to tenderers, technical specifications, drawings and general conditions of contract for civil
2 The Price quoted in the summary of costs; sheet of schedule of quantities and rates shall be in all
inclusive value for the work described including all costs and expenses which may be required in and
for the execution of the work described together with all general risks, liabilities and obligations set forth
or implied in the document on which the tender is based.
3 The quantities furnished are approximate. In the event of actual quantities varying from those furnished
herein below or items deleted or added, the Rates quoted for the entire work shall remain firm and no
extra claims in this respect will be entertained. The payment shall be made based on the actual
quantities in the completed work.
4 All works shall be carried out strictly as per detailed specifications whether actually specified or not. If
not specified, as per directions of Engineer in charge
5 Rates quoted by Tenderer shall be firm even if the contract is split. If tenderer does not agree to keep his
quoted Rates valid under such a condition he shall clearly state so in his bid.
6 Rates and the total amount entered in the summary of cost sheet of schedule of quantities and
6 Rates and the total amount entered in the summary of cost sheet of schedule of quantities and
rates shall be written in ink and shall be entered both in figures and words.
7 If Tenderer need any clarifications, they should obtain the same in writing from owner/ Engineer.
No notice will be taken of any verbal discussion in such matter.
1 Rate and amount shall be written both in figures and words.
2 Refer Schedule of quantities for items of Works & Estimated Quantities.
3 Plans are available with Asst. City Engineer. Tenderers are instructed to see them during office
hours in his office before quoting tender.
PAGE -- 2 of 2 SHEDULE
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPPARTMENT
GENERAL TENDER CONDITIONS
1 After sanctioning of tender, a work order will be issued to the contractor. In response contractor shall have
to arrange for Security Deposit within 10 days for works up to 10 lacks of tender amount and 15 days for
works above 10 lacks of tender amount. The time limit shall be counted after 10 days for works up to
lacks of tender amount and 15 days for works above 10 lacks of tender amount after issuance of work
order. The contractor shall be fined 4% of interest per year for delay in submission of S.D. and shall be
deducted from contractor’s bill. Security Deposit of 5% of sanctioned tender amount shall be deposited by
pay order / demand draft / cheque or Bank Guarntee of nationalized bank/scheduled bank only. Contractor
shall have to sign contract paper with AMC.
2 In case of earnest money cheque bounce back, contractor’s tender shall treated as cancelled and the
contractor shall not be given any tender, offer, quotation work in AMC for one year.
3 Muni. Commissioner shall have right to accept, reject the tender as well as the rate at which tender to be
accepted and awarded.
4 Specification of tender items shall be as per PWD manual in general / AMC’s norms and B-1 form
conditions shall be applicable. In case of controversy, Addl.C.E.’s decision shall be final.
5 If watering is not done as per norms/specifications or if debris is not removed within 24 hours, then
without notice, AMC shall have a right to execute that work at contractor’s risk and the amount shall be
recovered from the bill.
6 Contractor shall have to work in such a system that there shall be no damage to any service line of electric,
telephone, gas, any type of service cable, drainage or water lines etc. In case of damage to service line, the
contractor will be responsible for damage and shall have to repair/reinstate the damaged existing services.
The contractor shall have to safe guard the labours against any accident or damage of lives or public
property if any.. In case of police complain, Contractor shall be held responsible for negligence. In case of
soil/land collapse, contractor shall be held responsible for not supporting the soil with shoring, strutting
and shuttering. Contractor shall safeguard the labour before allowing labour to enter in excavated pit or
other hazardous site. In case of accident to labours, contractor shall be held responsible for police complain
against him. AMC’s staff will not be responsible for any accident at the site of the work.
7 Contractor shall take insurance of his all labour and supervisory staff.
8 Only registered contractor shall quote the tender, if the contractor is registered with government then they
shall have to apply for registration in AMC within 180 days from the date of work order.
9 AMC’s general condition and Form-B-1 shall be binding to the contractor B-1 Form is put up on AMC’s
10 Payment of running bill, final bill shall be as per policy of AMC in force at time of payment.
11 Any time of litigation shall be in court of Ahmedabad city jurisdiction only.
12 As per site conditions/requirement of site, there shall be increase or decrease in tender item quantities. In
such case contractor shall not have right to any price rise. In case of decrease in any tender item quantity,
contractor shall not ask for compensation.
13 If any construction material brought to site by contractor is not as per specification, or any inferior quality
material brought to site, then such rejected material shall be removed from the site within 24 hours,
otherwise AMC can throw away such material at any place and recover the amount for such removal work
from contractor bill. In this case contractor shall not be entitled for compensation.
14 Cost of testing of material shall be borne by the contractor. He shall provide vehicle for taking material /
staff from site to testing laboratory / manufacturing site and contractor shall be bear the cost of
transportation of staff and material.
15 Contractor shall work as per labour Act. Contractor shall not be given any payment if labour act rules are
not followed or insurance of labour is not taken for work.
16 Contractor shall deposit the material on site in such a way that it should not become obstruction to any one
17 All type of taxes(e.g. sales tax, surcharge, vat etc) to be borne by the contractor.
18 If asked by AMC Engineering staff, contractor shall take photograph of site of work / before start of work,
during work and after the completion of work, with digital camera and deposit to AMC office or transfer
photograph from camera to AMC computer. No additional cost shall be paid.
19 In case of cancellation / rejection of tender, contractor shall not be entitled for any compensation or right.
20 In case of extra item, AMC circular no. 9 Dt.08.05.12 shall be follwed in general If item is not available in
SOR, then market rate shall be derived by the Eng. dept by rate analysis. Contractor shall not ask for the
rates as per his rate analysis. This should be clearly understood and taken in to consideration while quoting
the tender by the contractor.
21 During execution of work, contractor shall take safely measures like protection by ropes, drums, danger
sign boards, plastic strips, bamboos, wooden poles etc as per requirement & instruction of Egg.- in –charge.
In case of accident due to lack of protection, contractor shall responsible for police complains,
compensation etc AMC staff shall not be held responsible for contractor’s negligence.
22 If instructed by AMC officials, contractor shall have to keep daily progress register and get it signed by
Ass. City Engineer. Contractor shall maintain record of daily No.of labours employed, work done. If
rectification work is not done by contractor within 24 days, the contractor shall be finned Rs.250/- per day
for delay & shall be recovered from the contractors bill.
23 Contractor shall not be entitled for any type of compensation or right for the cancellation of tender or
tender items by any means.
24 Deduction from bills shall be done as per rules prevailing or the rules which shall come in to force, by State
or Central Govt.
25 1% amount shall be deducted for labour welfare fund as per state Govt. order.
26 All the above conditions shall over rule the conditions given in Form B-1.
27 Specifications are placed on AMC website www.egovamc.com for tender items, PWD manuals should be
followed in general.
28 Contractor shall have to register the work as per labour act & as per building safely act, 1906 with,
Dy.Director building safety act., Shram Bhavan, 5th floor labour commissioner office, Khanpur,
29 In case, at the time of submitting tender copy in duplicate, if single copy of tender bid is quoted by
contractor then it shall be treated as cancelled at the time of opening ( except E-Tendering).
30 At the time quoting tender, if tender fee or EMD is not deposited then tender shall be treated as cancelled at
the time of opening of tender.
31 In case of the bank detail are not given then EMD return procedure shall be delayed.
32 In case of water pipe line work, If materials are not available from AMC central stores, then the time limit
delay of providing materials by central stored shall be given to the contractor.
33 In case of road grouting work tender, if at the time of resurfacing paver work, If paver gets stucked in
grouting work then contractor shall have to rectify the poor grouting work without any cost.
34 Before quoting the tender contractor should know that, he has seen the site understood the item of works,
site conditions. He should be in a positions to provide labours at the time of festivals like Holi, Diwali,
Navratri, Marriage season, rainy season or any other time of the year Contractor cannot say that he has no
labours due to festivals.
35 Running bill amount should be restricted to 90% sanctioned tender amount and remaining 10% amount
shall be paid in final bill after completion of work..
36 "As and When Required" Clause: Most civic tenders include a flexibility clause stating that the services,
labor, or materials can be diverted to other administrative zones or wards at the same approved rates if an
exigency arises.
37 Competent Authority Approval: Utilizing the tender resources outside the originally designated ward
requires formal, prior approval from the competent authority (such as the Ward Officer, Deputy
Commissioner, or Municipal Commissioner).
38 Variation and Quantity Limits: While the approved item rates will remain identical, any significant increase
in the total volume of work may require a formal 'Excess Quantity' or deviation approval as per financial
I have read all above conditions carefully and ready to work as per above conditions.
Contractor’s Name and seal ADD.CITY ENGINEER
Mobile No. SOUTH ZONE
Address Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
ENGGNIERING DEPARTMENT
TECHNICAL SPECIFICATION
Item No. Technical Specification Description Mode of Measurement / Payment
Box cutting the road surface to proper slope and camber for making a
base for road work including removing the excavated stuff and
depositing on the road side slope as directed upto 200Mt.lead.
Any soil which generally yields to the application of ackaxes and
shoves, phawaras rakes or any such ordinary excavating implement or
organic soil, gravel silt, sand turfloam, clay, peat etc., fall under this
Clearing the site:
The site on which the structure is to be built shall be cleared and all
obstructions, loose stone, materials and rubbish of all kind, bush,
wood and trees shall be removed as directed. The materials so
obtained shall be property of the Government and be conveyed and Cubic Meter basis (according to
Item No. 1 stacked as directed. within 200 M. lead. The roots of the trees coming sections of trenches shown on drawing
in the sides shall be cut and coated with a hot asphalt. or given by Engineer-in-charge)
The rate of site clearance is deemed to be included in the rate of earth
work for which no extra will be paid.
After clearing the site, the center lines will be given by the Engineer-
in-charge. The contractor shall assume full responsibility for
alignment, elevation and dimension of each and all parts of the work.
Contractor shall supply laborers, materials, etc. required for setting
out the reference marks and bench marks and shall maintain them as
long as required and directed.
The excavation in foundation shall be carried out in true line and
level and shall have the width and depth as shown in the drawings or
as directed. The contractor shall do the necessary shoring and shutting
Conveyance charge of earth, lime, murrum, building rubbish,
manure, garbage, sludge, excavated rock, fly ash, aggregates of
any kind Including spreading & levelling etc. complete.
• (a)Lead Upto 1 Km.
• (b)Lead From 1 Km to 2 Km.
• (c)Lead From 2 Km to 3 Km
Item No. 2 One Cubic Meter basis
• (d)Lead From 3 Km to 4 Km
• (e)Lead From 4 Km to 5 Km
• (f)Lead From 5 Km to 10 Km
• (g)Lead From 10 Km to 15 Km
Disposal of earth, lime, murrum, building rubbish, manure,
Providing and laying cement concrete 1:3:6 (1- Cement : 3-
Item No. 03 Coarse sand : 6- Hand broken stone aggregates 40mm nominal CMT basis
size) and curing complete
Providing TMT Bar FE500D reinforcement for R.C.C. Work
including bending,binding and placing in position complete
Item No. 04 KG basis
upto floor two level. (As Per Road Tender) As per R & B SOR
Repairing damaged M.H. and raising M.H. up to road level
incl. removing damaged brick work and repairing by brick
masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I.
Item No. 5 steps and existing MH sheet cover, removing the debris from No. basis (up to 2.00 mt. depth work)
MH and carting the same as directed.(a)upto 0.15mt.(@Two
coarse)(b)upto to 0.35mt.(@Four coarse (c)upto
mt.(@seven Coarse) (d)upto 0.90mt.(@Ten Coarse)
Extra rate over item of excavation of earth for excavation of
asphalt pavement / RCC of thickness up to 0.20 meter
including demolishing the asphalt carpet, metal, soiling/cutting
Item No. 6 Reinforcement etc. comp. with stacking the material as Smt. Basis
directed. (a) up to 0.20 meter thickness (By Manual)(b) 0.20 to
0.30 meter (By any type of Breaker Machine or R.C.C.Cutter
machine)(c) 0.30 meter & above
Providing and fixing cast iron manhole frame of weight 80 to
85 kg suitable for existing EHD-35 FRC MH cover, rate also
incl. loading, unloading and fixing the frame in line and level
Item No. 7 kg. Basis
to match exisisting road level in C.C. 1:2:4 and finishing
smooth, watering and protecting for 7 days etc. complete as per
instruction by engg. in charge.
Providing and laying in position Ready Mixed M-200 grade
concrete for reinforced cement conctere work, using cement
content as per approved Design Mix manufactured in fully Volume basis (Length x Breadth x
automatic batching plant and transported to site of work in Depth)
transit mixer for a lead up to 10 kms having continuous
agitated mixer...
Providing Formwork of ordinary timber planking so as to give
a rough finish including centering shuttering strutting and
propping etc. Heightof propping and centering below
Item No. 9 supporting floor to ceiling not exceeding 4 M. and removal of Smt. Basis
the same for in situ reinforced concreteand plain concrete work
in. (A)Foundations Footings Bases of Columnsetc. and Mass
Providing and fixing S.W. Gully Trap with C.I. Grating brick
masonrychamber and water tightC.I. cover with frame of
Item No. 10 No. Basis
300mm x 300mmsize(inside) with standard weight.(i) Square
mouth traps. (A) 100mm x100mm size P type.
P/A Tremix with dewartering machine and floater machine on
Item No. 11 constructed CC work for finishing the surface as per Smt. Basis
Making 15 mm. Groove in RCC work on road & filling it with
Item No. 12 polysulfied selant & finished ot good incl. all labour charges Nos. Basis
etc. comp.as directed.
Leveling or orien tation of existing Gully Trap chamber
Item No. 13 incl.nece. masonry in CM (1:6) and plaster in CM (1:3) etc. Nos. Basis
using old GT stone and cover etc.comp.
Providing F.R.C. MH seat cover incl. carting to the work site
etc. comp. Directed.
Item No. 14 (a) F.R.C. Extra Heavy Duty (EHD-35) No. Basis
(b) F.R.C. Heavy Duty [HD-20]
(c) F.R.C. Medium Duty [MD-10]
CatchPit Jali (Heavy duty) Fixing P/F FRC catch pit jali with
Item No. 15 frame 600mm x 600mm clear opening etc. comp.. As directed No. Basis
by engineer in charge.
Providing & Laying For Approved Quality (ISO Certified
Item No. 16 Smt. Basis
Brand) Floor Hardner @ 3.0 Kg/Smt.
Providing and supplying,and jointing ISI mark only standard
Item No. 17 length stoneware pipes of following class and diameter Nos. Basis
including excavation for laying of pipes... d) 230mm dia
(B) PAVER BLOCK SECTION
Item No. Technical Specification Description Mode of Measurement / Payment
Item No. 01 Dismantling the following including loading, unloading (a) RMT (b) one sq. Meter (C) CMT
and disposal of unserviceable material for all lead or as (d) Cu.m (e) Cu.m
directed by Engineer-In-Charge and stacking the
serviceable material and backfilling the resulting trenches
and pits complete.
a. central verge -kerb stone.
b. Dismantling tiled or stone floors laid in mortar...
c. Demolition & disposal of unserviceable material for
unreinforced concrete.
d. Demolition of brick work & stone masonry...
e. Demolition including stacking of serviceable materials...
(I) R.C.C work.
Item No. 02 Extra rate over item of excavation of earth for excavation Smt. Basis
of asphalt pavement / RCC of thickness up to 0.20 meter
including demolishing the asphalt carpet, metal,
soiling/cutting Reinforcement etc. comp. with stacking the
material as directed.
Item No. 03 Barricading the entire break down or excavated area on Rmt. Basis
rental basis using wooden ballies / M.S.angles at max.
2.00 meter centre to centre, C.G.I. Sheet, reflective paint /
Board out side to avoid accident...
Item No. 4 Box cutting the road surface to proper slope and camber one cubic meter
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 200Mt.lead.
Item No. 5 Conveyance charge of earth, lime, murrum, building one cubic meter
rubbish, manure, garbage, sludge, excavated rock, fly ash,
aggregates of any kind Including spreading & levelling
etc. complete. (a) Lead Upto 1 Km to (g) Lead From
Item No. 6 Repairing damaged M.H. and raising M.H. up to road No. Basis
level incl. removing damaged brick work and repairing by
brick masonry in C.M. 1:5 and plaster in C.M. 1:3...
Item No. 07 Repairing damaged I.C./ Raising removing damaged brick No. Basis
work and repairing by brick masonry in C.M. 1:5 and
plaster in C.M. 1:3 and fixing C.I. steps and existing
chamber sheet cover...
Item No. 08 Excavation for pipe line trenches for sewerage line, Cmt. Basis
manhole etc all with shoring and struting if required as per
required gardient and lineincluding safety provisions using
site railes and stacking excavated stuff...
(A) In all sorts of soil and soft murrum
(B) In hard murrum, boulders including macadam road
Item No. 09 Providing F.R.C. MH seat cover incl. carting to the work Nos. Basis
site etc. comp. Directed. (A) F.R.C. Extra Heavy Duty
(EHD-35) (B) F.R.C. Heavy Duty [HD-20]
Item No. 10 F.R.C. Strom Water Grating Grating(Jali): 620 x 620 x Nos. Basis
75mm square jali, 5:00 MT load design, 75x1.2mm MS
flat allround, Frame: 500 x 500mm clear opening...
Item No. 11 Constructing Bombay Pattern Type Catch Pit of size 0.60 Nos. Basis
x 0.60 depth up to 1 mt including excavation, B.B.C.C.
(1:5:10), 23 cms thick brick maso. wall in the prop. of CM
(1:6) with 40 mm thick IPS flooring...
Item No. 12 Supplying and fixing of 300 mm-L x 150 mm-B x 380 Per specifications of Kerb
mm-H Kerb block for Footpath in M-20 grade using
mm nominal size black trap aggregate...
Item No. 13 Providing and Laying of Rubber Moulded Paver Block SMT
Grey/Coloured 60 mm thick, M-35 Grade of any size ;
shape (Usually Uni-Paver Blocks) using black trap good
quality aggragate of 20 mm nominal size for footpath...
Laying on 50 mm thick sand bedding.
Item No. 14 Labour work of fixing kurb any design of central verge, RMT basis
(both side) footpath kurb, items includes necessary
excavation, asphalt cutting of any thickness, erecting in
line and position...
Item No. 15 Providing and laying cement concrete 1:3:6 (1- Cement : CMT basis
3- Coarse sand : 6- Hand broken stone aggregates 40mm
nominal size) and curing complete
Item No. 16 Labour work for fixing interlocking blocks / any kind of RMT basis
pavement on up to 50 mm th sand bedding, levelling,
watering and fixing in line & level as well cleaning the site
etc.comp. as directed.
Item No. 17 Lowering laying jointing RCC Pipes in CM 1:1 1/2 of RMT basis
following dia meter in proper positon grade and alignment
at all level as directed by Engineer in charge...
Item No. 18 Proding and supplying ISI standord RCC pipes (of RMT basis
sulphate Ressisting Cement) in standord lengths of
following class and diameter...
Item No. 19 Making connection to the ex.M.H. in running sewer incl Nos basis
Dewatering and other required machinery etc.of following
dia pipe satany convenienttime...
a) 150mmto300mmdia.
CCRS Complaint Redressal SLA & Penalty Structure
No Department Category Problem Description SLA
1 Engineering Water >> Engineering Water-Pollution In Supply 24 Hours ₹1,000.00
2 Engineering Water >> Engineering Water -Other 72 Hours ₹500.00
3 Engineering Water >> Engineering Water-low pressure 240 Hours ₹500.00
4 Engineering Water >> Engineering Water-No Supply 240 Hours ₹500.00
Water-Requirement of Water
5 Engineering Water >> Engineering 6-12 Hours ₹500.00
6 Engineering Water >> Engineering Water-Leakage In Main Line 48 Hours ₹500.00
Drainage- Manhole Cover
7 Engineering Drainage >> Engineering 24 Hours ₹1,000.00
8 Engineering Drainage >> Engineering Drainage-Other 48 Hours ₹500.00
9 Engineering Drainage >> Engineering Drainage- Choking Of Line 48 Hours ₹500.00
Drainage- overflowing of
10 Engineering Drainage >> Engineering 48 Hours ₹1,000.00
mainline and distribution line on
Drainage-Public Toilets and
11 Engineering Drainage >> Engineering 72 Hours ₹500.00
Urinals Drainage Line Blockage
12 Engineering Road Road-Bhuva On Road 48 Hours ₹1,000.00
13 Engineering Road Road-Other 48 Hours ₹500.00
14 Engineering Road Road-Repair Require 72 Hours ₹500.00
15 Engineering Footpath Road-Footpath Repairing 168 Hours ₹500.00
16 Engineering Storm Water Road-Catch Pit Repairing 96 Hours ₹500.00
17 Engineering Storm Water Road-Waterlogged Due To Rain 24 Hours ₹1,000.00
Building-Municipal Schools
18 Engineering Building >> Engineering 168 Hours ₹500.00
Public Building-Public Toilets
19 Engineering Public Building 360 Hours ₹1,000.00
and Urinals - Repairing of
Note: If the total penalty amount goes above 10.00% of sanctioned tender amount, the said tender will be called off &
will be reinvited for the same at that particular stage of tender.
TENDER TERMS & CONDITIONS (ટ ડરની શરતો)
(1) CCRS complaints will be communicated to the contractor via WhatsApp, telephone, or in writing. Must be
completed within SLA.
(2) After completion, photographs, certificate, and completion updates must be shared with the ward staff within SLA.
(3) If complaints are not resolved within SLA, penalties will be deducted directly from the bill as per the matrix.
(4) A weekly report of CCRS complaints must be certified and submitted to the Ward Office in the prescribed format.
(5) If a complaint does not belong to the ward, department, or AMC jurisdiction, the ward staff must be informed
immediately after calling the applicant.
(6) Biometric attendance is mandatory for the supervisor deployed by the agency/contractor.
(7) The appointed supervisor must be literate (सा र).
(8) Supervisors cannot be changed without prior written notice. Uninformed changes attract a penalty of ₹2,000 per
(9) Complaints must only be closed after calling the applicant. Reopened complaints will attract a penalty of ₹1,500 per
Contractor’s Name and seal ADD.CITY ENGINEER
Mobile No. SOUTH ZONE
Address Ahmedabad Municipal Corporation
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
E Tender Notice 431 paver block vol 1.pdf
E Tender Notice 431 paver block vol 2.pdf
rate chanage E Tender Notice 431 paver block vol 2.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .