Tender Value
₹10.2 L
EMD Value
₹10,200
Closing Date
15 Jul 2026, 6:00 pm
Similar tender results from the same govt authority in the past 3 years.
Executive engineer Panchayat Irrigation Division Valsad
Construction of Community Well at village Ghotan khadi faliya Jagdishbhai Lokhand’s area,Ta-Kaprada, Dist-valsad
317353
02 of 2026-27
Open
Civil Works
Valsad
9 documents required · 8 mandatory · 1 optional
₹900
Executive Engineer panchayat Irrigation Division Valsad
₹10,200
25 Jun 2026
25 Jun 2026
25 Jun 2026
15 Jul 2026
25 Jun 2026
Name of work: Construction of Community Well at village Ghotan khadi faliya Jagdishbhai Lokhand’s area,Ta-
Kaprada, Dist-valsad
Memorandum Schowing the item of work to be carried out
Qty. Unit Description of Item In figures Amount
Item No. 1 :Excavation for well including Removing
and spreading the excavted stuff as directed with
(i) 0.00 Meter to 1.50 Meter depth
(Rupees One Hundred
29.03 M3 (i) In all sorts of soil incl.soft murrum. 140.80 Forty and Eighty Paisa
(Rupees Two Hundred
58.06 M3 (ii) In Hard murrum. 204.60 Four and Sixty Paisa
(ii) 1.5 Meter to 3.00 Meter depth
(Rupees Three Hundred
83.08 M3 (iii) soft Rock. 314.60 Fourteen and Sixty
(iii) 3.00 Meter to 4.50 Meter depth
81.12 M3 (iv) In hard rock with blasting & chiselling 760.10 Hundred Sixty and Ten
(Rupees Thirty Five and
54.08 M3 (b) Extra for dewatering in all strata. 35.20
Twenty Paisa Only)
(iv) 4.50 Meter to 6.00 Meter depth
Hundred Seventy Seven
75.36 M3 (iv) In hard rock with blasting & chiselling 777.70
and Seventy Paisa
(Rupees Forty Seven
75.36 M3 (b) Extra for dewatering in all strata. 47.30
and Thirty Paisa Only)
(v) 6.00 Meter to 7.50 Meter depth
42.46 M3 (iv) In hard rock with blasting & chiselling 798.60 Hundred Ninety Eight
and Sixty Paisa Only)
42.46 M3 (b) Extra for dewatering in all strata. 66.00 (Rupees Sixty Six Only)
(vi) 7.50 Meter to 9.00 Meter depth
(Rupees Eight Hundred
35.62 M3 (iv) In hard rock with blasting & chiselling 822.80 Twenty Two and Eighty
(Rupees Eighty Four
35.62 M3 (b) Extra for dewatering in all strata. 84.70 and Seventy Paisa
(vii) 9.00 Meter to 10.50 Meter depth
(Rupees Eight Hundred
34.34 M3 (iv) In hard rock with blasting & chiselling 856.90 Fifty Six and Ninety
(Rupees One Hundred
34.34 M3 (b) Extra for dewatering in all strata. 105.60 Five and Sixty Paisa
(viii) 10.50 Meter to 12.00 Meter depth
(Rupees Eight Hundred
33.08 M3 (iv) In hard rock with blasting & chiselling 893.20 Ninety Three and
Twenty Paisa Only)
(Rupees One Hundred
33.08 M3 (b) Extra for dewatering in all strata. 122.10 Twenty Two and Ten
(ix) 12.00 Meter to 13.50 Meter depth
(Rupees Nine Hundred
31.84 M3 (iv) In hard rock with blasting & chiselling 928.40 Twenty Eight and Forty
(Rupees One Hundred
31.84 M3 (b) Extra for dewatering in all strata. 152.90 Fifty Two and Ninety
(x) 13.50 Meter to 15.00Meter depth
(Rupees Nine Hundred
9.81 M3 (iv) In hard rock with blasting & chiselling 965.80 Sixty Five and Eighty
(Rupees Two Hundred
9.81 M3 (b) Extra for dewatering in all strata. 204.60 Four and Sixty Paisa
Item No. 2 :Providingand laying Plain / Reinforced
cement concrete of cement, sand and metal (20mm
to 25mm size) in following proportion laid in situ (Rupees Five Thousand
41.16 m including centering, shuttering, temping,smooth 5380.00 Three Hundred Eighty
finishing, curingetc. complete as directed for all Only)
leads and lifts (Manually With Conventional Mixer
Item No. 3 :Providing and laying Plain / Rein forced
cement concrete of cement , sand and metal (20
mm to 25 mm size ) in following proportion laid in (Rupees Four Thousand
4.78 m situ including centering , shuttering ,temping , 4110.50 One Hundred Ten and
smooth finishing , curing etc. completes directed for Fifty Paisa Only)
alllead sand lifts (Manually With Conventional
Mixer)(iii)1:3:6
Item No. 4 : Providing and placing in position
reinforcement bars including cutting, bending (Rupees Seven
10.78 Qtl welding, joints where necessary,hooking 7194.00 Thousand One Hundred
etc.complete as per drawing for all lead and lifts. Ninety Four Only)
Item No. 5 :Providing and fixing in position 110 (Rupees Two Hundred
21.000 MT mm dia PVC Pipe weep holes in abutment wing 263.70 Sixty Three and Seventy
wall , and laying training etc complete . Paisa Only)
Item No. 6 : Providing Supplying and fixing at site
(Rupees Seventy Three
of work with railway freight loading, unloading
0.034 MT carting etc. complete. Such as joints chenals 73361.00
Hundred Sixty One
angles iron etc .Medium weight channels (ISMC Only)
series) 75 x 40 mm. @ 6.8 kg / m.
Item No. 7 :Back fiing the foundation trenchesa
3 round the structures etc. with selected excavated (Rupees Nineteen and
stuff includingwatering, ramming, compactingetc. Fifty Paisa Only)
complete.(By machinary)
Item No. 8 : Providing ISI 2.5 " Sprinkler Pipe (Rupees Six Hundred
including loading unloading transportation etc comp Fifty Only)
Item No. 9 : Providing and fixing marble plate of 2 (Rupees Two Hundred
13.50 cm thickness including engraving and filling paint for 250.60 Fifty and Sixty Paisa
letters as directed. Only)
Item No. 10 : Providing and fixing Solar Panel with
3HP submersible motor including solar and grid
(Rupees Three Lakh
1.00 Job controller and all acessories and fiting including all 300000.00
labour carting loading unloadig etc comp For
HP sub mersible motor with all acessories
Item No. 11 : Providing & fixing in position sign
board of standard size of 0.60mx0.45m with M.S
angle 40mmx40mmx6mm with 3mm thick iron plate
1.00 Job 3011.30 Thousand Eleven and
including fixing in 1:5:10 prop. Concrete block size
Thirty Paisa Only)
40cmx40cmx75 cm including painting existing data
on the board etc. complete as directed.
(Rupees One Thousand
Item No. 12 : Hiring JCB-4CX for Approach Road &
8.00 No. 1348.00 Three Hundred Forty
other allied misc. activites for Well Construction
(Rupees Ten Lakh Eighteen Thousand Nine Hundred Seventy Three and Eleven Paisa Only)
I/We am/are Willing to carry out the work at……………………………...…………………% above/below Percent(should be written in
figures and words) of the estimated rates mentioned above.Amount of my/our tender works out as under.
Estimated amount Put ter Rs.
Rs. Add…….% above Rs.
Net Rs.`` Net Rs.
In words…………………….. In words……………………..
*(Please strike out whichever is not applicable)
Note 1 All works shall be carried out as per Public Works Department Handbook and other specifications of Division or as directed.
GM\Wv! AW]\ H SFD AF\WSFD lJEFUGL 5]l:TSF VG[ l0lJhGGL ALÒ BF; lJUT D]HA VYJF ;}RGF 5|DF6[ SZL VF5JFG]\ ZC[X[P
Note-2 All the columns is Schedule should be filled in ink and the total of the entries in the last column should be struck by the contractor
under his signature.
GM\WvZ VG];}lRDF\ AWF BFGFGL lJUTM ;CLYL EZJL VG[ K[<,F BFGFGL GM\WMGM ;ZJF/M SZL S\8=FS8Z[ 5MTFGL ;CL SZJLP
Note-3 Rates quotes include clearance of site (prior commencement of work and at its close) in all respects and hold good for work under all
conditions, site, moisture, weather etc.
GM\Wv# 8F\S[,F NZDF\4 :Y/GL sSFDGF VFZ\E[ VG[ 5]~ YFI T[ JBT[f NZ[S ZLT[ ;FO;}OL SZJFGM ;DFJ[X YFI K[4 VG[ T[ NZ TDFD 5lZl:YlT4 :Y/4 E[H4 CJFDFG JU[Z[ C[9/ SFD
Note-4 To be continued on additional sheets, if found necessary.
GM\Wv$ H~Z H6FI JWFZFGF SFU/M HM0L RF,]\ ZFBJ]\P
uded 1 % Labour Cess & shall be deducted from contractor all bills.
Deputy Executive Engineer, Executive Engineer,
Tribal Area Sub Division, Panchayat Irrigation Division,
Dharampur Valsad.
Signature of contractor
Name of work : Construction of Community Well at village Ghotan khadi faliya Jagdishbhai Lokhand’s area,Ta-
Kaprada, Dist-valsad
CEMENT & STEEL CONSUMPTION
Sr. No. Item Cement Required
in CM consumption
1 Item No. 2 :Providingand laying Plain / Reinforced
cement concrete of cement, sand and metal (20mm to
25mm size) in following proportion laid in situ including
41.16 8.00 Bags / CM
centering, shuttering, temping,smooth finishing,
curingetc. complete as directed for all leads and lifts
(Manually With Conventional Mixer (V)1:1.5:3
2 Item No. 3 :Providing and laying Plain / Rein forced
cement concrete of cement , sand and metal (20 mm to
25 mm size ) in following proportion laid in situ
4.78 4.40 Bags / CM
including centering , shuttering ,temping , smooth
finishing , curing etc. completes directed for alllead
sand lifts (Manually With Conventional Mixer)(iii)1:3:6
Deputy Executive Engineer
Tribal Area Sub Division,
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.SBD Ghotan.pdf
2.Schedule-B Ghotan.pdf
3.Nivida No. -02 Of 2026-27.pdf
4. ANEXURE-II.pdf
5.clause No 4.5.4 and 4.5.5.pdf
6.qualification information 1.1 to1.14 and 3.1 - Copy.pdf
7.Bid Capacity.pdf
8.Ghotan well DRW.pdf
Download all tender documents and submit your bid