| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.5 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹9.8 Cr+₹32.1 L (3.39%)Admitted-Finance AT CHHAMUNDA PO CHHAMUNDA PS TELKOI DIST KEONJHAR STATE ODISHA PIN 758084 | CHHAMUNDA | KEONJHAR | ODISHA | 758084 | L2 | Admitted-Finance | ||
| 3 | Rejected-Technical | - | Rejected-Technical Insufficient machineries and similar nature of work. |
Tender Value
₹8.3 Cr
EMD Value
₹8.3 L
Closing Date
24 Jun 2026, 5:00 pmClosed
Chief Construction Engineer, R.W. Circle, Keonjhar
O/o C.C.E., R.W. Circle, Keonjhar
Improvement to Dubuna OMC Squar to Pidapokhari Road under DMF in the District of Keonjhar for th year 2026-27
2026_CERWI_132016_1
NCB-07/RWCKJR/2026-27
National Competitive Bid
Civil Works - Roads
Percentage
270 days
Keonjhar
4 documents required · 4 mandatory
₹10,000
₹8.3 L
Yes
30 Sept 2026
12 Jun 2026
25 Jun 2026
12 Jun 2026
24 Jun 2026
12 Jun 2026
12 Jun 2026 - 23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 50 mtr outside the periphery of the area and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness as per specification and as per the direction of Engineer -in-charge. | 1,200 | sqm | 8.63 | ₹10,356 |
| 2 | Earth work in excavation of in hard or gravelly soil with initial lead and lift including dressing the sides & leveling the bed of the foundation to the required width & required depth including dewatering if necessary and stacking the excavated materials away from working area etc.complete and as per specification and as per the direction of Engineer -in-charge. | 15,600 | cum | 235.73 | ₹36,77,388 |
| 3 | Earth work in excavation of in stoney earth with initial lead and lift including dressing the sides & leveling the bed of the foundation to the required width & required depth including dewatering if necessary and stacking the excavated materials away from working area etc.complete and as per specification and as per the direction of Engineer-in-charge. | 9,360 | cum | 367.64 | ₹34,41,110.4 |
| 4 | Earth work in excavation of in disintegrated rock not requiring blasting to be removed by pick axes and crow bars and depositing material with initial lead and lift including dressing the sides & leveling the bed of the foundation to the required width & required depth including dewatering if necessary and stacking the excavated materials away from working area etc.complete and as per specification and as per the direction of Engineer-in-charge. | 4,680 | cum | 597.57 | ₹27,96,627.6 |
| 5 | Blasting hard rock and compacted sheet rock excluding sand stone measured in solid including jumping holes cost of explosive fuse, detonator etc and stacking the blasted debris clear of work within 50 m lead etc complete as per the direction of the Engineer-in-charge. | 1,560 | cum | 1,573.81 | ₹24,55,143.6 |
| 6 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by manual means within a lead of 5kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & clause 305 of MoSRT&H Specifications for Road & Bridge works (4th Revision)and as per the direction of engineer in charge. | 10,822.45 | cum | 271.82 | ₹29,41,758.36 |
| 7 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement as per MORD technical Specification Clause 301 and direction of the Engineer in Charge (excluding cost of excavation and transportation to site). | 4,970.11 | cum | 50.46 | ₹2,50,791.75 |
| 8 | Supplying & filling moorum of approved quality including watering to complete saturation & ramming complete with all leads & lifts including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Engineer in charge. | 575 | cum | 597.89 | ₹3,43,786.75 |
| 9 | Construction of granular sub-base by providing close graded granular sub base Grading III material as per table 401-1, spreading in uniform layer with moter grader on prepared surface, mixing by mix in place method with rotavator at OMC ,and compacting with vibratory roller to achieve the desired density complete as per clause 401 of MoSRT&H Specification for Road & Bridge works (4 th Revision) | 2,230.74 | cum | 2,510.1 | ₹55,99,380.47 |
| 10 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including pre mixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per Clause 406 of MoSRT&H Specifications for Road & Bridge works (4th Revision). | 3,040.88 | cum | 2,948.28 | ₹89,65,365.69 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 7.63 MB
Tendernotice_1.pdf
PDF • 2.12 MB
BOQ_596409.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .