Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 Cr Construction of OCR Complex including internal water supply, sanitary installations, drainage, IEI & fans, power wiring, lighting conductors, split AC system, firefighting with downcomer system, manual fire alarm system and development works like external water supply connections, storm water drains, UG Sump, Septic Tank, internal roads, borewells with pump sets, electrical service connection, street lights etc for SIB at Kadapa, AP | Construction of OCR Complex including internal water supply, sanitary installations, drainage, IEI & fans, power wiring, lighting conductors, split AC system, firefighting with downcomer system, manual fire alarm system and development works like external water supply connections, storm water drains, UG Sump, Septic Tank, internal roads, borewells with pump sets, electrical service connection, street lights etc for SIB at Kadapa, AP | ₹1.9 Cr | L1 | - |
| 2 | L2₹2.1 Cr+₹11.4 L (5.88%)Financial bid opened Construction of OCR Complex including internal water supply, sanitary installations, drainage, IEI & fans, power wiring, lighting conductors, split AC system, firefighting with downcomer system, manual fire alarm system and development works like external water supply connections, storm water drains, UG Sump, Septic Tank, internal roads, borewells with pump sets, electrical service connection, street lights etc for SIB at Kadapa, AP | Construction of OCR Complex including internal water supply, sanitary installations, drainage, IEI & fans, power wiring, lighting conductors, split AC system, firefighting with downcomer system, manual fire alarm system and development works like external water supply connections, storm water drains, UG Sump, Septic Tank, internal roads, borewells with pump sets, electrical service connection, street lights etc for SIB at Kadapa, AP | ₹2.1 Cr+₹11.4 L (5.88%) | L2 | Financial bid opened |
| 3 | L3₹2.1 Cr+₹11.9 L (6.14%) Construction of OCR Complex including internal water supply, sanitary installations, drainage, IEI & fans, power wiring, lighting conductors, split AC system, firefighting with downcomer system, manual fire alarm system and development works like external water supply connections, storm water drains, UG Sump, Septic Tank, internal roads, borewells with pump sets, electrical service connection, street lights etc for SIB at Kadapa, AP | Construction of OCR Complex including internal water supply, sanitary installations, drainage, IEI & fans, power wiring, lighting conductors, split AC system, firefighting with downcomer system, manual fire alarm system and development works like external water supply connections, storm water drains, UG Sump, Septic Tank, internal roads, borewells with pump sets, electrical service connection, street lights etc for SIB at Kadapa, AP | ₹2.1 Cr+₹11.9 L (6.14%) | L3 | - |
| 4 | L4₹2.1 Cr+₹13.7 L (7.02%) Construction of OCR Complex including internal water supply, sanitary installations, drainage, IEI & fans, power wiring, lighting conductors, split AC system, firefighting with downcomer system, manual fire alarm system and development works like external water supply connections, storm water drains, UG Sump, Septic Tank, internal roads, borewells with pump sets, electrical service connection, street lights etc for SIB at Kadapa, AP | Construction of OCR Complex including internal water supply, sanitary installations, drainage, IEI & fans, power wiring, lighting conductors, split AC system, firefighting with downcomer system, manual fire alarm system and development works like external water supply connections, storm water drains, UG Sump, Septic Tank, internal roads, borewells with pump sets, electrical service connection, street lights etc for SIB at Kadapa, AP | ₹2.1 Cr+₹13.7 L (7.02%) | L4 | - |
| 5 | L5₹2.1 Cr+₹15.0 L (7.71%) Construction of OCR Complex including internal water supply, sanitary installations, drainage, IEI & fans, power wiring, lighting conductors, split AC system, firefighting with downcomer system, manual fire alarm system and development works like external water supply connections, storm water drains, UG Sump, Septic Tank, internal roads, borewells with pump sets, electrical service connection, street lights etc for SIB at Kadapa, AP | Construction of OCR Complex including internal water supply, sanitary installations, drainage, IEI & fans, power wiring, lighting conductors, split AC system, firefighting with downcomer system, manual fire alarm system and development works like external water supply connections, storm water drains, UG Sump, Septic Tank, internal roads, borewells with pump sets, electrical service connection, street lights etc for SIB at Kadapa, AP | ₹2.1 Cr+₹15.0 L (7.71%) | L5 | - |
| Sl No | Description | Qty | Unit | K Yogeeshwar Rao L4 | MOHAMMAD HUSSAIN L3 | M/s PR PROJECTS L5 | SCS Infrastructures Private Limited L2 | NATH DECORS L1 | Challa Venkatesh L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Composite Tender
(Civil: Rs. 2,15,39,233+ Electrical: Rs.50,71,004/-) | - | - | -21.76 ₹2,08,19,849.43 | -22.4 ₹2,06,49,543.91 | -21.25 ₹2,09,55,561.64 | -22.59 ₹2,05,98,984.46 | -26.89 ₹1,94,54,744.27 Lowest | -17.88 ₹2,18,52,326.62 |
Tender Value
₹2.7 Cr
EMD Value
₹5.3 L
Closing Date
30 Aug 2023, 3:00 pmClosed
EE-Tirupati
P Ganesh
Room No. 016, Kenddriya Sadan,
Construction of OCR Complex including internal water supply, sanitary installations, drainage, IEI & fans, power wiring, lighting conductors, split AC system, firefighting with downcomer system, manual fire alarm system and development works like external water supply connections, storm water drains, UG Sump, Septic Tank, internal roads, borewells with pump sets, electrical service connection, street lights etc for SIB at Kadapa, AP
51582
23/EE/Tirupati/e-Tender/2023-24
OPEN
Civil Works - Buildings
NCB
300 days
Y.s.r., Andhra Pradesh
7 documents required · 7 mandatory
₹5.3 L
Office of Executive Engineer, Central PWD., CPWD Office Building, Nehru Nagar, Tirupati 517 507
30 Aug 2023
23 Aug 2023
30 Aug 2023
30 Aug 2023
25 Aug 2023
26 Aug 2023
stage.html
html • 0.07 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT_23.pdf
document • 6.52 MB
NOTICE_23.pdf
document • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .