Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.7 LAccepted-AOC 1003 SUB TREASURY DEVIKULAM | ₹8.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹8.8 LRejected-AOC PERAMBRA KERALA | ₹8.8 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | RAJAN L1 | C K AMMED L2 |
|---|---|---|---|---|---|
| 1.00Canal work | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 45.88 | cum | 260.27 ₹11,941.19 | 265.03 ₹12,159.58 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 15.1 | cum | 8,014.42 ₹1.2 L | 8,160.9 ₹1.2 L |
| 1.00 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 190.49 | sqm | 848.23 ₹1.6 L | 863.73 ₹1.6 L |
| 1.00 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 23.4 | cum | 8,657.2 ₹2.0 L | 8,815.42 ₹2.1 L |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 12.92 | cum | 9,330.9 ₹1.2 L | 9,501.43 ₹1.2 L |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 179.47 | kilogram | 113.57 ₹20,382.18 | 115.66 ₹20,757.27 |
| 1.01 | 13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand) | 141.9 | sqm | 320.58 ₹45,490.30 | 326.43 ₹46,320.42 |
| 1.01 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 21.27 | cum | 321.74 ₹6,844.05 | 327.63 ₹6,969.35 |
| 2.00Near 7/800 Flume | |||||
Tender Value
₹7.9 L
EMD Value
₹19,697
Closing Date
12 Aug 2025, 6:55 pmClosed
Assistant Executive Engineer
o/oAssistant Executive EngineerKyIP Canal Subdivision Vadakara
GENERAL-KyIP ACP PLAN 2025-26-Rectification works to Thiruvallur Distributary Canal in between Ch. 7/300 and 7/400 km,7/600 and 7/700km and RR flume near 7/800km-General Civil Work
2025_Irrig_782912_1
IRR/PI/TR/2017/2025_5_3_2/1
Open Tender
Civil Works - Canal
180 days
Thiruvallur
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,740
Yes
₹19,697
Yes
9 Jun 2026
5 Aug 2025
14 Aug 2025
5 Aug 2025
12 Aug 2025
5 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1284830.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid