Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.8 CrAccepted-AOC 357 KOTKAPURA ROAD STREET NO 8 MUKTSAR PUNJAB 152026 | SRI MUKTSAR SAHIB | PUNJAB | 152026 | ₹3.8 Cr | 1 | Accepted-AOC awarded |
| 2 | 2₹4.2 Cr+₹40.1 L (10.6%)Rejected-Finance LUDHIANA CANAL CIRCLE LUDHIANA | LUDHIANA | PUNJAB | 141001 | ₹4.2 Cr+₹40.1 L (10.6%) | 2 | Rejected-Finance high bidder |
| Sl No | Description | Qty | Unit | M/S ASHOK KUMAR CONTRACTOR L1 | DARSHAN SINGH KALER AND COMPANY L2 |
|---|---|---|---|---|---|
| 1.00 | Ordinary Jungle Clearance of both banks of running Disty., Minors and Drains including Boundary road with discharge exceeding 1.5 cumecs but upto 4.5cum/sec | 5.45 | km | 1,000 ₹5,450 Lowest | 2,605.83 ₹14,201.77 |
| 2.00 | Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. | 5,567.69 | cum | 30 ₹1,67,030.7 Lowest | 35.82 ₹1,99,434.66 |
| 3.00 | Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations inlcuding all lifts and leads, excluding royality. | 71,269.32 | cum | 132.98 ₹94,77,394.17 Lowest | 230.8 ₹1,64,48,959.06 |
| 4.00 | Extra for laying earthwork as per specifications for compaction in 20 cm layer and dressing including cost of rolling and watering as per specifications | 61,741.84 | cum | 99.03 ₹61,14,294.42 | 80 ₹49,39,347.2 Lowest |
| 5.00 | Dressing of Earthwork for new work or remodeling work. | 46,016.16 | sqm | 1 ₹46,016.16 Lowest | 1.3 ₹59,821.01 |
| 6.00 | Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 0 to 1.5 mtr depth | 7,382.09 | cum | 100 ₹7,38,209 Lowest | 100 ₹7,38,209 Lowest |
| 7.00 | Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 1.5 to 3.0 mtr depth | 2,281.76 | cum | 100 ₹2,28,176 Lowest | 100 ₹2,28,176 Lowest |
| 8.00 | Earthwork excavation in foundation, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and side of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within a lead of 30 metres. | 550.28 | cum | 110 ₹60,530.8 Lowest | 191.74 ₹1,05,510.69 |
| 9.00 | Dressing of Side Slopes and prepration of sub grade for lining complete in all respect as per pwd specification. | 33,930.02 | sqm | 18.49 ₹6,27,366.07 Lowest | 18.49 ₹6,27,366.07 Lowest |
| 10.00 | Dag Belling single kassi stroke complete in all respect | 5.45 | km | 100 ₹545 Lowest | 848.07 ₹4,621.98 |
Tender Value
₹3.7 Cr
EMD Value
₹7.4 L
Closing Date
17 Oct 2025, 10:00 amClosed
Executive Engineer
FARIDKOT CANAL AND GW DIVISION FARIDKOT
Estimate for concrete lining of Manuke Disty from RD 33590-51450
2025_WR_150835_1
Estimate for concrete lining of Manuke Disty from RD 33590-51450..
Open Tender
Civil Works - Canal
Item Rate
90 days
JAGROAN
Pre Qualification Details
2 documents required · 2 mandatory
₹2,000
Yes
₹7.4 L
Yes
Faridkot
10 Nov 2025
26 Sept 2025
17 Oct 2025
26 Sept 2025
17 Oct 2025
26 Sept 2025
8 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
Tendernotice_2.pdf
PDF • 0.51 MB
BOQ_305485.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .