Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 CrAccepted-AOC | ₹8.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹10.8 Cr+₹2.3 Cr (27.1%)Rejected-AOC | ₹10.8 Cr+₹2.3 Cr (27.1%) | L2 | Rejected-AOC L2 |
| 3 | L3₹12.4 Cr+₹4.0 Cr (46.9%)Rejected-AOC 1ST FLOOR B 116 VIBHUTI KHAND GOMTI NAGAR LUCKNOW U P | LUCKNOW | LUCKNOW | UTTAR PRADESH | ₹12.4 Cr+₹4.0 Cr (46.9%) | L3 | Rejected-AOC L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Disqualified |
| 5 | Rejected-Technical | - | - | Rejected-Technical Disqualified |
Tender Value
₹6.8 Cr
EMD Value
₹13.6 L
Closing Date
25 Jul 2020, 5:00 pmClosed
Superintending Engineer
Construction Circle, Uttarakhand Peyjal Nigam, Nainital
DESIGN BUILD OPERATE AND TRANSFER SEPTAGE TREATMENT PLANT OF 125KLD CAPACITY TO TREAT THE PREDOMINANTLY DOMESTIC RAW SEPTAGE TO THE GUARANTEED EFFLUENT CHARACTERISTICS
2020_MDPEY_24571_1
1132/613/141 Dated 19-06-2020
Open Tender
Civil Works
Turn-key
548 days
Rudrapur
Please refer tender documents
3 documents required · 3 mandatory
₹5,900
Executive Engineer, PIU (AMRUT) UKPJN, Kashipur
₹13.6 L
Kashipur
3 Jul 2025
25 Jun 2020
28 Jul 2020
25 Jun 2020
25 Jul 2020
2 Jul 2020
29 Jun 2020
Amount
Price Schedule : Part A – Design Build etc. work for construction of 125 KLD SeTP
Design, development, supply of equipment, erection of equipment, civil, electro mechanical and instrumentation control works, including testing, commissioning of 125 KLD SeTP in Rudrapur to treat the raw septage upto the standard mentioned in bid document. PROCESS DESIGN ENGINEERING AND DRAWINGS :- Process & Instrumentation Diagrams, Flow Charts, Hydraulic Diagram and Complete Process Design, Site Layout Plan and Site Grading Plan, Single line Diagrams, Control Philosophy & Basic Electrical and Instrumentation Drawings, Preparation of “QA” and construction procedure manual along with “Test Plan”, Civil and Mechanical General Arrangement Drawings, Architectural Drawings, Structural Designs and Drawings and Construction Drawings, Mechanical and Piping data sheets and Drawings, Detailed Electrical and Instrumentation and control Systems, Drawings and datasheets including PLC and SCADA, Ancillary Works and Non-Technology Structural Drawings including roads and drainage and compound wall bypass + treated effluent disposal arrangement like pipe line etc. RCC drain, external electrification plans, As-Built Drawings, Operation and Maintenance Manuals and Training Program and Manuals, etc. complete (To be submitted in 6 Nos. sets). Duration : 15 months construction + 3 months Trial run. Break-up of works of item No. 1.01 as follows :-
Civil and Structural Works: Construction of 125 KLD SeTP Includes all civil works such as Site Development & Infrastructure Works including site Cleaning / Grading / Levelling and Reclamation, compound Wall with Gates, Roads & green cover along boundary wall, bypass + treated effluent pipe, Internal Roads & Pathways, Internal Sewer Network and Internal Storm Water Drains, Landscaping and Gardening, Piping & Valves, all Liquid Retaining Structures (Such as receiving chamber coarse and fine screen channels, grit chambers) and other liquid retaining as required in treatment technology proposed by bidder and as specified in bid document). It also includes others various Buildings / Sheds such as administration cum MCC and Control Building, building for E&M equipment as per norms / practice and sample testing laboratory complete with equipments etc. disposal of bypass sewage to Begul river, reuse / disposal of treated effluent to Begul river, piping between different units of SeTP complete in all respect.
ELECTRO-MECHANICAL & INSTRUMENTAL WORKS :- Installation, testing and commissioning of Electro - mechanical and instrumentation equipment and accessories as specified in bid document
Price Schedule : Part B - Annual O & M Prices of 125 KLD SeTP except Electricity and Fuel charges. The cost included herein are the yearly cost for plant Operation & maintenance including Fixed Cost (Cost of Manpower to be deployed, General Maintenance of Civil Structures, preventive and Breakdown Maintenance of Mechanical equipment, Electrical items, Field & Laboratory Instruments, Supply of Laboratory Chemicals / Glassware / Consumable / Spares etc.) and Variable Cost (Including cost of Chemicals & Disposal of Plant Residuals viz. Screenings, Grits, Dewatered Sludge, etc)
For 1st year of operation (Defect Liability Period )
For 2nd year of operation
For 3rd year of operation
For 4th year of operation
For 5th year of operation
For 6th year of operation
For 7th year of operation
For 8th year of operation
For 9th year of operation
For 10th year of operation
For 11th year of operation
For 12th year of operation
For 13th year of operation
For 14th year of operation
For 15th year of operation
Price Schedule : Part C - Annual Electricity charges for 125 KLD SeTP (considering the plant will run 100% on electricity)
For 1st year of operation (Defect Liability Period )
For 2nd year of operation
For 3rd year of operation
For 4th year of operation
For 5th year of operation
For 6th year of operation
For 7th year of operation
For 8th year of operation
For 9th year of operation
For 10th year of operation
For 11th year of operation
For 12th year of operation
For 13th year of operation
For 14th year of operation
For 15th year of operation
DIVIJA CONSTRUCTION
R K ENGINEERS SALES LTD
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .