Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 LAccepted-AOC R O VILL RATHI P O BACHHUNCH TEHSIL ROHRU DISTT SHIMLA HP | SHIMLA | HIMACHAL PRADESH | 171001 | L1 | Accepted-AOC Work Completed | |
| 2 | L2₹7.2 L+₹91,932.98 (14.7%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹7.5 L
EMD Value
₹15,000
Closing Date
12 Apr 2022, 10:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer HPPWD Division Paonta Sahib District Sirmour (HP)
A/R and M/O to Badrinagar Jamniwala Parduni road Km. 0/0 to 14/500. (SH- Repair of pot holes in Km. 1/0 to 3/0 and 6/0 to 7/0)
2022_PWD_59117_2
Tender/13981-14031 dated 29.03.2022
Open Tender
Civil Works - Roads
Item Rate
60 days
Paonta Sahib
Please refer tender document
13 documents required · 13 mandatory
₹350
₹15,000
17 Jun 2023
6 Apr 2022
12 Apr 2022
6 Apr 2022
12 Apr 2022
6 Apr 2022
75 days
Amount
Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications ,including all leads, lifts and carriage of materials, as per the entire satisfaction of Engineer-in-charge.
Contruction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506,including all leads, lifts and carriage of materials, as per the entire satisfaction of Engineer-in-charge.
2 cm.(two centimetres)thick premix carpet surfacing with 1.8 cum(one point eight cubic metre) and 0.90 cum(Zero poiint nine zero cubic metre) of stone chippings of 13.2 mm.(thirteen point two milimetre) size and 11.2 mm.(eleven point two milimetre) size respectively per 100 sqm(hundred squaqre metre) and 52 kg and 56 kg(fifty two kilogram and fifty six kilograms) of hot bitumen per cum of stone chippings of 13.2 mm.(thirteen point two milimetre) size and 11.2 mm.(eleven point two milimetre) size respectively, including a tack coat with hot straight run bitumen, including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately),including all leads, lilfts and carriage of materials, as per the entire satisfaction of Engineer-in-charge.
Providing and laying seal coat of premixed fine aggregate ( passing 2.36 mm.(two point three six milimetre) and retained on 180(one hundred eighty) micron sieve) with bitumen using 128 kg.(one hundred twenty eight kilograms) of bitumen of grade VG - 10 bitumen per cum of fine aggregate and 0.60 cum.(zero point six zero cubic metre)of fine aggregate per 100 sqm.(hundred square metre). of road surface, including rolling and finishing with road roller all complete,including all leads, lifts and carriage of materials, as per the entire satisfaction of Engineer-in-charge.
Nazar Ali
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .