Tender Value
₹75.3 Cr
EMD Value
₹12 L
Closing Date
8 Jul 2026, 4:00 pmClosed
Additional Chief Engineer(Procurement & Contracts)
Supply, installation, testing & commissioning of conversion of (1) 66kV Hirapur - Kanbha line (2) 66kV Juval Rupavati - Kerala line-1 (3) 66KV Juval Rupavati – Kerala line-2 (4) 66kV Salejada - Ingoli line (5) 66kV Navagam - Jetalpur line (6) 66kV Karamsad- V V Nagar line-1 (7) 66kV Karamsad - V V Nagar line-2 (8) 66kV Singlav - Borsad line (9) 66kV Karamsad - Singlav line (10) 66kV Kheda - Samadara line (11) 66kV Sabarmati - Godarej line (12) 66kV Godrej - Tragad line (13) 66kV Khanpur - Bahiyal line with ACSR DOG conductor into equivalent HTLS Conductor (Equivalent weight of ACSR DOG conductor with Higher Ampacity) of Nadiad Circle).
312301
ACE(P&C)/Contracts/E-455/Uprating/66kV/S&E
Open
Electrical Works
Works
Vadodara
30 documents required · 22 mandatory · 8 optional
₹11,800
Gujarat Energy Transmission Corporation Limited
₹12 L
17 Jun 2026
17 Jun 2026
17 Jun 2026
8 Jul 2026
17 Jun 2026
General 23.1 (a) The estimated cost for of 23.1 (a) The estimated cost of Tender is
Conditions of Tender is more than Rs. 100 lacs, more than Rs. 100 lacs, the EMD is
Contract/ the EMD is payable as under: payable as under:
and its sub- 50 % of EMD by DD in favor 50 % of EMD by DD in favor of
clauses of Gujarat Energy Gujarat Energy Transmission
Transmission Corporation Ltd. Corporation Ltd. on any
on any Scheduled Bank in Scheduled Bank in Vadodara
Vadodara and Balance 50 % and Balance 50 % by Bank
by Bank Guarantee from any Guarantee from any Nationalized
Nationalized Bank in the Bank in the format provided
format provided herein. herein.
(b) The estimated cost of tender is (b) The estimated cost of tender is less
less than Rs.100 Lacs, the EMD is than Rs.100 Lacs, the EMD is payable
payable as under: - as under: -
100 % of EMD by DD in favor 100 % of EMD by DD in favor of
of Gujarat Energy Gujarat Energy Transmission
Transmission Corporation Ltd. Corporation Ltd. on any
on any Scheduled Bank in Scheduled Bank in Vadodara.
(c) Payment by Cheque / Coop Bank (c) Payment by Cheque / Coop Bank
Guarantee/ Company Guarantee is Guarantee/ Company Guarantee is not
not permissible. permissible.
(d) Validity Period: - The offer (d) Validity Period: - The offer should
should be valid for a minimum period be valid for a minimum period of
of 180 days from the date of opening days from the date of opening of
of Technical bid. Technical bid.
Seal & Signature of Bidder
(e) Payment of EMD will be accepted
by RTGS / NEFT / online or Demand
draft or Banker’s cheque or Pay
order or Bank Guarantee
23.2 The bid security is required to
protect the owner against the risk of 23.2 The bid security is required to
Bidder’s conduct, which would protect the owner against the risk of
warrant the guarantee forfeiture, Bidder’s conduct, which would warrant
pursuant to relevant paras elsewhere the guarantee forfeiture, pursuant to
relevant paras elsewhere
The bid guarantee shall be made
payable to the Owner without any The bid guarantee shall be made
condition whatsoever. payable to the Owner without any
condition whatsoever.
23.3.1 Any bid not secured in
accordance with Para 23.1 above will 23.3.1 Any bid not secured in
be rejected by the Owner as non- accordance with Para 23.1 above will be
responsive. No exemptions are made rejected by the Owner as non-
in the furnishing of the security. responsive. No exemptions are made in
the furnishing of the security.
23.3.2 Unsuccessful Bidder’s bid
security/EMD will be 23.3.2 Unsuccessful Bidder’s bid
returned/refunded on security/EMD will be returned/refunded
finalization of tender or three
forthwith on finalization of tender i.e.,
months-from the date of
submission of tender once the award of contract, after
whichever is later. opening of price bids. However, the Bid
Security/ EMD of the bidder ranked next
(L2) to the bidder determined as the
successful bidder (L1) shall be retained
by GETCO, along with the Bid Security/
EMD of the successful bidder. Bid
Security/ EMD of L2 bidder shall be
returned immediately after the Letter of
Acceptance/ Award (LOA) is issued by
GETCO to the successful bidder and
acknowledged/ accepted by the
successful bidder or the Contract is
signed with the successful bidder,
whichever event occurs earlier.
However, if there is a delay of 21 days
or more in aforesaid events reckoned
from the date of approval of award of
contract by the competent authority, as
aforesaid, the Bid Security/ EMD of the
L2 bidder shall be released immediately
after the said period of 21 days.
If the validity of the bid expires and any
bidder chooses not to extend the bid
validity, the Bid Security/ EMD of such
bidder shall be returned forthwith.
23.3.3 The successful bidders, Bid
Security will be discharged 23.3.3 The successful bidders, Bid
Seal & Signature of Bidder
upon, furnishing the contract Security will be discharged upon,
performance guarantee furnishing the contract security deposit /
performance guarantee.
23.4 The bid guarantee may be
forfeited. 23.4 The bid guarantee may be forfeited.
a) If a Bidder withdraws its bid a) If a Bidder withdraws its bid
during the period of bid during the period of bid validity
validity specified by the bidder specified by the bidder on the bid
on the bid Form: Form:
b) If a bidder refuses to accept b) If a bidder refuses to accept the
the contract or fails to contract or fails to commence the
commence the works works (including supplies within
(including supplies within thirty days of letter of award of
thirty days of letter of award of contract)
2. Part –I 86.0 Terms of Payment 86.0 Terms of Payment
General The payment for materials to be The payment for materials to be
Conditions of supplied and erected shall be made supplied and erected shall be made as
Contract/ as under only after execution of the under only after execution of the
Clause 86.0 contract documents/furnishing of contract documents/furnishing of
and its sub- Security Deposit and on execution of Security Deposit and on execution of
clauses transmission line work. transmission line work.
86.1 For supply
86.1 For Supply
86.1.1 Interest Bearing Advance
(i) Interest Bearing Advance
(Optional*): Ten percent (10%) of the
total Ex-works price component of
Tower / Tower Parts (including Bolts
& Nuts) and all other materials shall
be paid as an interest bearing initial
advance, at the rate of interest as per (ii)
below, after signing the Contract
Agreement and on submission of the
(a) Proforma invoice(s),
(b) Advance Bank Guarantee for [{110%
(one hundred ten percent) of the amount
of Advance}], from a Public Sector
Indian bank/Scheduled, Commercial
Bank in the form attached herewith as
Annexure-i (The guarantee shall be
initially valid up to 90 days after the Time
of Completion and shall be reduced at
the end of every Quarter prorata to the
advance adjusted),
(c) Performance Securities in line with
GCC Clause 40.0 including its sub-
Provided further that the Proforma
Seal & Signature of Bidder
Invoice(s) for advance payment along
with all supporting documents is
submitted by the Contractor to the
Employer within 3 months from the date
of Letter/ Notification of Award. In case
the Contractor does not submit the
requisite documents including applicable
Bank Guarantee(s) /Security(ies) within
the aforesaid period, the advance shall
not be payable. The Contractor shall,
within 7 days from the date of receipt of
Advance, furnish an Advance Receipt
Voucher to the Employer, as prescribed
under the GST Law.
Note: * This payment is an optional
payment. The Contractor has the option
of taking the interest bearing initial
advance or otherwise. The option for
advance payment is to be indicated by
the bidder in its bid as per the format
attached herewith as Annexure–iii and
shall be deemed to be part of the
bidding scheduled referred as
SCHEDULED-21 to be submitted by the
bidder with Technical bid.
(ii) Interest rate applicable on advance
payment to the Contractor shall be at the
rate equal to one-year MCLR rate [One-
year Tenor rate p.a.] published by State
Bank of India prevailing as on the date
of drawl of advance. The said interest
rate shall remain fixed and shall be
applicable till the advance amount is
fully repaid. The interest will be charged
considering proportionate adjustment of
advance against progressive payment
as per 86.1.2 below. The interest shall
be calculated on the daily progressive
balances outstanding as on the date of
recovery/adjustment. It is the Employer’s
understanding that as per extant
provisions, GST is not payable on
interest paid on the amount of Advance.
The Contractor is, however, advised to
check the position from their own
sources. If payable even at later stage,
the same shall be to the Contractor’s
account and Employer shall not
reimburse any GST on this account.
Recovery of this advance shall be
adjusted in such a way that that all the
sums of advance with interest thereon
shall be fully recovered 3 months prior to
Seal & Signature of Bidder
the scheduled Time of Completion,
failing which the whole amount of
advance along with interest thereon
shall be recovered immediately from the
payments due to the Contractor.
The contractor may however, return /
pay to GETCO the unadjusted advance
amount at any stage during the
execution of the work along with the
accrued interest thereon till the time of
return / payment. Alternatively, the
contractor may also request GETCO for
early adjustment of the advance along
with accrued interest.
Further, the Contractor shall submit the
certificate of Tax Deduction at Source
(TDS) on interest within 3 months from
the end of the quarter in which
adjustment of advance has been made
for claiming refund from Employer. No
claim for refund will be entertained after
end of the aforesaid period of 3 months.
Further, while submitting the TDS
Certificate the details of Contract No,
Project, Region, Quarter etc to which the
TDS certificate pertains, shall also be
submitted tallying the amount with the
TDS Certificate.
In case, the Contractor opts not to take
interest bearing advance as above, it
would be mandatory for him to submit
the documents listed at Sl. No. (i) (c)
above within twenty-eight (28) days of
issuance of Letter/ Notification of Award.
86.1.2 Progressive Payments
(i) 80% of supply value for each
consignment of material on (i) (a) 70 % of supply value for fabricated
submission of invoice along with tower parts & stubs and 80% of supply
100% GST, duties, F & I shall be value for all other line material, hardware
paid within 30 days from the actual and accessories etc. if contractor opts to
material receipt date mentioned in take interest bearing initial advance or
SR Note after verifying the following
documents by field office and duly (b) 80% of supply value instead of 70%
recorded. of supply value for fabricated tower parts
& stubs and 90% of supply value
A. Tax invoice. instead of 80% of supply value for all
B. Delivery challan. other line material, hardware and
C. Endorsed RR / LR copy. accessories etc., if contractor opts not
D. Dispatch clearance certificate / to take interest bearing initial advance or
letter wherever applicable. has opted to take interest bearing initial
Seal & Signature of Bidder
E. E Way Bill, if applicable advance but the advance payment has
become inadmissible for each
consignment of material on submission
of invoice along with 100% GST, duties,
F & I shall be paid within 30 days from
the actual material receipt date
mentioned in SR Note after verifying the
following documents by field office and
A. Tax invoice.
B. Delivery challan.
C. Endorsed RR / LR copy.
D. Dispatch clearance certificate / letter
wherever applicable.
E. E Way Bill, if applicable
(ii) 10% payment out of balance 20% (ii) 10% of the of supply value for
of supply value shall be paid on fabricated tower parts & stubs shall be
completion of erection & testing of paid progressively on completion of
the transmission line and completion erection of complete tower (including
certificate from Engineer-in-charge tack welding and earthing) and
and Chief Engineer (Procurement & furnishing of completion certificate from
Contracts)) or equivalent. Engineer-in-charge and Chief Engineer
(iii) Balance 10% of supply value (iii) Balance 10% of supply value shall
shall be paid on successful be paid on quarterly basis on erection
commissioning of transmission line (including stringing) of transmission line
against completion certificate and in stretches cumulatively not less than
only after settlement of material 10% of original length of line in all
account statement of items supplied, respects and rectification of
used, erected and successful defects/deficiencies of corresponding
commissioning is settled for complete stretch on progressive basis and on
lot and balance 10% will be release completion certificate from Engineer-in-
only after passing of final bill. No charge and Chief Engineer (Projects).
extra payment will be released for This payment shall be released on
the tower materials and line submission along with the invoice for
materials which are not required first such payment, of an unconditional &
for completion of line if supplied irrevocable Bank Guarantee of 10% of
excess during execution of work contract price of supply portion, initially
and recovery will be made in final valid till 3 months beyond the scheduled
bill accordingly. date of completion of testing &
commissioning of the transmission line
and its taking over by the GETCO and
shall be extended from time to time till
the actual date of successful completion
of testing & commissioning of line and its
taking over by the GETCO.
GETCO should accept the Tower and
line materials if excess as per
approved check survey only. No
other payment will be made and no
other material shall be accepted.
(iv) Welfare Cess (iv) Welfare Cess
The modality of payment/ The modality of payment/
reimbursement of welfare cess will reimbursement of welfare cess will be
Seal & Signature of Bidder
be as under. as under.
On receipt of A/T, the contractor / On receipt of A/T, the contractor /
bidder will get them registered bidder will get them registered under
under Welfare Cess Act and submit Welfare Cess Act and submit the
the documentary evidence to the documentary evidence to the concern
concern office. office.
Before release of payment of first Before release of payment of first
R.A.Bill, the contractor has to R.A.Bill, the contractor has to submit
submit the documentary evidence the documentary evidence of
of registration. Only thereafter, the registration. Only thereafter, the bill
bill will be processed for payment. will be processed for payment.
Before release of payment of Before release of payment of
subsequent R.A.Bills, the contractor subsequent R.A.Bills, the contractor
has to submit the documentary has to submit the documentary
evidence of payment of welfare evidence of payment of welfare cess
cess of previous R.A.Bill. of previous R.A.Bill.
Before release of payment of Final Before release of payment of Final
Bill, the contractor has to submit the Bill, the contractor has to submit the
documentary evidence of payment documentary evidence of payment of
of welfare cess of previous R.A.Bill welfare cess of previous R.A.Bill as
as well as the final bill. well as the final bill.
If the R.A.Bill happens to be first If the R.A.Bill happens to be first and
and final bill, then before release of final bill, then before release of
payment, contractor has to submit payment, contractor has to submit
documentary evidence of documentary evidence of registration
registration under Welfare Cess Act under Welfare Cess Act and evidence
and evidence of payment of welfare of payment of welfare cess.
cess. The welfare cess shall be
The welfare cess shall be reimbursed to the contractor on
reimbursed to the contractor on submission of copy of documentary
submission of copy of evidence of payment by observing
documentary evidence of due formalities.
payment by observing due
86.2 For Erection works.
86.2 For Erection works.
86.2.1 A. Survey
Payment for survey shall be paid on pro-
rata basis on completion of survey and
approval of the same by the Employer.
86.2.1 B. Interest Bearing Initial
Advance (Optional ^^) Ten percent
(10%) at the rate of interest as per
86.2.1 B.1 1st Installment of 05%
(Five) of the total Installation price
component (excluding the price
component for survey) shall be paid on
Establishment of Contractor’s site
offices, commencement of stub setting
work & certification by Project Manager
that satisfactory mobilization for erection
exists and on submission of the
Seal & Signature of Bidder
(a) Proforma invoice,
(b) Advance Bank Guarantee for [{110%
(one hundred ten percent) of the amount
of Advance} Plus {amount of GST
reimbursable on Advance as per the
Proforma invoice}] from a Public Sector
Indian bank/Scheduled, Commercial
Bank in the form attached herewith as
Annexure-i (The guarantee shall be
initially valid up to 90 days after the Time
of Completion and shall be reduced at
the end of every Quarter prorata to the
advance adjusted),
(c) Performance Securities in line with
GCC Clause 40.0 including its sub-
86.2.1. B.2 2nd Installment of 05%
(Five)^^ of the total Installation price
component (excluding the price
component for survey) shall be paid on
commencement of stringing activities &
certification of the same by Project
Manager and on submission of the
(a) Proforma invoice(s),
(b) Advance Bank Guarantee for [{110%
(one hundred ten percent) of the amount
of Advance} Plus {amount of GST
reimbursable on Advance as per the
Proforma invoice}] from a Public Sector
Indian bank/Scheduled, Commercial
Bank in the form attached herewith as
Annexure-i (The guarantee shall be
initially valid up to 90 days after the Time
of Completion and shall be reduced at
the end of every Quarter prorata to the
advance adjusted),
(c) Performance Securities in line with
GCC Clause 40.0 including its sub-
(d) A declaration by the Contractor
Seal & Signature of Bidder
stating that 1st Installation (5%) of
advance has been utilized against the
mobilization works for the subject
Recovery of this advance shall be
adjusted in such a way that that all the
sums of advance with interest thereon
shall be fully recovered 3 months prior to
the scheduled Time of Completion,
failing which the whole amount of
advance along with interest thereon
shall be recovered immediately from the
payments due to the Contractor.
The contractor may however, return /
pay to GETCO the unadjusted advance
amount at any stage during the
execution of the work along with the
accrued interest thereon till the time of
return / payment. Alternatively, the
contractor may also request GETCO for
early adjustment of the advance along
with accrued interest.
Note: ^^ This payment is an optional
payment. The Contractor has the option
of taking the interest bearing advance or
otherwise. The option for advance
payment is to be indicated by the bidder
in its bid as per the format attached
herewith as Annexure–iii and shall be
deemed to be part of the bidding
scheduled referred as SCHEDULE-21 to
be submitted by the bidder with
Note: After release of various advances,
the rate of recovery of the advance shall
be re-adjusted.
Provided further that the Proforma
Invoice(s) for advance payment along
with all supporting documents as per
para B.1 and B.2 above is submitted by
the Contractor to the Employer within
months from the date of fulfillment of the
requisite activities, as per the L2
network. In case the Contractor does not
submit the requisite documents including
applicable Bank Guarantee(s)/
Security(ies) within the aforesaid period,
Seal & Signature of Bidder
the advance at B.1 & B.2 above shall not
The Contractor, shall, within 7 days from
the date of receipt of Advance, furnish
an Advance Receipt Voucher to the
Employer, as prescribed under the GST
86.2.1 B3. Interest rate applicable on
advance payment to the Contractor shall
be at the rate equal to one year MCLR
rate [One-year Tenor rate p.a.]
published by State Bank of India
prevailing as on the date of drawl of
advance. The said interest rate shall
remain fixed and shall be applicable till
the advance amount is fully repaid. The
interest will be charged considering
proportionate adjustment of advance
against progressive payment for the
work done as per 86.2.2 below. The
interest shall be calculated on the daily
progressive balances outstanding as on
the date of recovery/adjustment. It is the
Employer’s understanding that as per
extant provisions, GST is not payable on
Interest paid on the amount of Advance.
The Contractor may, however, advised
to check the position from their own
sources. If payable, the same shall be to
the Contractor’s account and Employer
shall not reimburse any GST on this
Further, the Contractor shall submit the
certificate of Tax Deduction at Source
(TDS) on interest within 3 months from
the end of the quarter in which
adjustment of advance has been made
for claiming refund from Employer. No
claim for refund will be entertained after
end of the aforesaid period of 3 months.
Further, while submitting the TDS
Certificate the details of Contract No,
Project, etc to which the TDS certificate
pertains, shall also be submitted tallying
the amount with the TDS Certificate.
In case, the Contractor opts not to take
interest bearing advance as above, it
Seal & Signature of Bidder
would be mandatory for him to submit
the document listed at Sl. No. B1 (c)
and, B2(c) above within twenty-eight
(28) days of issuance of Letter /
Notification of Award.
(i) 90% payment of amount claimed 86.2.2 (i) (a) 70% payment if contractor
covering various activities such as opts to take interest bearing mobilization
excavation, foundation, tower advance or (b) 80% payment instead of
erection, earthing, tack welding 70% payment if contractor opts not to
stringing of conductor and OPGW take interest bearing mobilization
including insulator hoisting works
advance or has opted to take interest
against R.A. bills duly certified by
EIC within 30 days from the date of bearing initial mobilization advance but
R.A. bill. the advance payment has become
inadmissible, of amount claimed
covering various activities such as
excavation, foundation, tower erection,
earthing, tack welding stringing of
conductor and OPGW including insulator
hoisting works against R.A. bills duly
certified by EIC within 30 days from the
date of R.A. bill.
86.2.2 (ii) 10% of erection value shall be
paid in three equal parts, each on
physical construction and erection of
33% of line work including stringing of
the Transmission Line, complete in all
respects, including rectification of
defects/deficiencies on the line and
certificate from Engineer-in-charge and
Chief Engineer (Projects).
(ii) 10% of erection value shall be 86.2.3. Balance 10% of erection value
paid against commissioning of shall be paid against commissioning of
transmission line only after transmission line only after settlement of
settlement of material account material account statement of items
statement of items supplied, used, supplied, used, erected and successful
erected and successful commissioning of transmission line. The
commissioning of transmission line same amount will be released in final bill
the same amount will be release in only and payment will be made only
final bill only and payment will be after passing of final bill.
made only after passing of final bill.
(iii) Payment of ROW compensation (iii) Deleted.
amount will be given as below only Note: ROW is now proposed to be in the
after submission of necessary scope of GETCO. Hence, this clause is
supporting documents. deleted.
1) 40% amount after completion
of foundation work
2) 40% amount after completion
of erection work
3) 20% amount after completion
of stringing work in all
Seal & Signature of Bidder
List of supporting documents:
1) Copy of form-7/12
2) Parishisht ‘A’ and ‘B’ of GoG
3) Document of Online Jantri
Rate of respective Survey No.
If online Jantri Rates are not
available, then land cost shall
be certified by competent
Revenue Authority.
4) Copy of APMC rate based on
which compensation is paid
towards damage of tree-crop
5) ‘Panchnama’ duly certified by
concern Sarpanch / Talati /
Mamlatdar or concern
Revenue Authority
6) Documents for the
compensation cost paid to
Govt. Trasurer as per GoG
Tharav for the line passing
through Govt. Waste Land. /
Govt. Organization.
(iv) Welfare Cess
(iv) Welfare Cess
The modality of payment/
The modality of payment/ reimbursement of welfare cess will be
reimbursement of welfare cess will as under.
On receipt of A/T, the contractor /
On receipt of A/T, the contractor / bidder will get them registered under
bidder will get them registered Welfare Cess Act and submit the
under Welfare Cess Act and submit documentary evidence to the concern
the documentary evidence to the office.
concern office. Before release of payment of first
Before release of payment of first R.A.Bill, the contractor has to submit
R.A.Bill, the contractor has to the documentary evidence of
submit the documentary evidence registration. Only thereafter, the bill
of registration. Only thereafter, the will be processed for payment.
bill will be processed for payment. Before release of payment of
Before release of payment of subsequent R.A.Bills, the contractor
subsequent R.A.Bills, the contractor has to submit the documentary
has to submit the documentary evidence of payment of welfare cess
evidence of payment of welfare of previous R.A.Bill.
cess of previous R.A.Bill. Before release of payment of Final
Before release of payment of Final Bill, the contractor has to submit the
Bill, the contractor has to submit the documentary evidence of payment of
documentary evidence of payment welfare cess of previous R.A.Bill as
of welfare cess of previous R.A.Bill well as the final bill.
as well as the final bill. If the R.A.Bill happens to be first and
If the R.A.Bill happens to be first final bill, then before release of
and final bill, then before release of payment, contractor has to submit
payment, contractor has to submit documentary evidence of registration
documentary evidence of under Welfare Cess Act and evidence
registration under Welfare Cess Act of payment of welfare cess.
Seal & Signature of Bidder
and evidence of payment of welfare The welfare cess shall be reimbursed
cess. to the contractor on submission of
The welfare cess shall be copy of documentary evidence of
reimbursed to the contractor on payment by observing due formalities.
submission of copy of documentary
evidence of payment by observing
due formalities.
3. Part –I 2.0 Tender Fee 2.0 Tender Fee
Special The tender fee plus GST as The tender fee plus GST as
Conditions of applicable specified in notice applicable specified in notice
Contract/ inviting tender is payable by inviting tender is payable by
Clause 2.0 Demand Draft (DD) at Demand Draft (DD) at Vadodara
Vadodara drawn on any drawn on any Scheduled Bank in
Scheduled Bank in favour of favour of Gujarat Energy
Gujarat Energy Transmission Transmission Corporation Ltd.
Corporation Ltd. The same The same will be furnished in
will be furnished in Cover-1 of Cover-1 of Bid along with EMD
Bid along with EMD (Bid (Bid Security).
Payment of Tender fee
accepted by RTGS / NEFT /
5. Part –I 5.0 QUALIFYING REQUIREMENT 5.0 QUALIFYING REQUIREMENT
Special [A] Technical Requirement: TECHNICAL CRITERIA:
Contract/ 1.0 Individual Bidders 1.0 Individual Bidders
and its sub- a) The bidder shall be Original a) The bidder shall be Original
clauses Equipment Manufacturer (OEM). Equipment Manufacturer (OEM).
The offered high ampacity The offered high ampacity
conductor/HTLS conductor of conductor/HTLS conductor of
equivalent size and weight that of equivalent size and weight that of
ACSR Dog conductor suitable for ACSR Dog conductor suitable for
existing 66kV Towers & H-frame existing 66kV Towers & H-frame
has to be designed, has to be designed, manufactured
manufactured and tested as per and tested as per relevant
relevant IS/IEC/ANSI with latest IS/IEC/ANSI with latest
amendments. amendments.
b) The bidder shall have supplied at b) The bidder shall have supplied at
least 100km of proposed high least 100km of proposed high
ampacity conductor/ HTLS ampacity conductor/ HTLS
conductor of equivalent size and conductor of equivalent size and
weight that of ACSR Dog weight that of ACSR Dog
conductor or above size during conductor or above size during the
the last five years. last five years.
c) The bidder shall have carried out c) The bidder shall have carried out
stringing of 50 Route km of 66kV stringing of 50 Route km of 66kV
& above voltage class & above voltage class
transmission line on towers/H- transmission line on towers/H-
Frame in any single year during Frame in any single year during
Seal & Signature of Bidder
the last five years. Sublet the last five years. Sublet
experience also allowed subject experience also allowed subject to
to provided Work order/PO copy provided Work order/PO copy of
of original contract and Sub- original contract and Sub-
contractor, experience certificate contractor, experience certificate
from main contractor and from main contractor and
statement of financial transaction statement of financial transaction
for the work order/PO are to be for the work order/PO are to be
submitted to ascertain experience submitted to ascertain experience
of line erection work of 66KV of line erection work of 66KV
and/or above class. and/or above class.
d) The proposed high ampacity d) The proposed high ampacity
conductor/HTLS conductor of conductor/HTLS conductor of
equivalent size and weight that of equivalent size and weight that of
ACSR Dog conductor of similar ACSR Dog conductor of similar or
or higher ratings must be in higher ratings must be in service
service for a minimum period of for a minimum period of Two
Two years in India at the time of years in India at the time of bid
bid opening. Supporting opening. Supporting
documents/Certificates of original documents/Certificates of original
customer to be submitted customer to be submitted
e) The bidder shall have in house e) The bidder shall have in house
design and testing facility design and testing facility.
f) The high ampacity f) The high ampacity conductor/HTLS
conductor/HTLS conductor of conductor of equivalent size and
equivalent size and weight that of weight that of ACSR Dog
ACSR Dog conductor or above conductor or above size proposed
size proposed to be supplied to be supplied shall have valid
shall have valid type test type test certificates from any
certificates from any NABL NABL accredited laboratory
accredited laboratory (National (National accreditation body of the
accreditation body of the country country where laboratory is
where laboratory is located) not located) not older than 10 years &
older than 10 years & must be must be valid till the expiry of
valid till the expiry of validity of validity of offer considering on last
offer considering on last date of date of submission of bid.
submission of bid.
However, Successful bidder has to However, Successful bidder has
carry out all the type test as per to carry out all the type test as per
relevant standard for the offered relevant standard for the offered
HTLS conductor without affecting HTLS conductor without affecting
delivery schedule. delivery schedule.
g) For experience of stringing, g) For experience of stringing,
certificate issued by the state certificate issued by the state
transmission utilities/central transmission utilities/central
transmission utilities/joint Venture transmission utilities/joint Venture
Company of Central utility / Company of Central utility /
Seal & Signature of Bidder
Transmission Licensee from Transmission Licensee from
Private Sector of Indian Origin Private Sector of Indian Origin
only shall be considered. only shall be considered.
h) The bidder shall have valid h) The bidder shall have valid
Electrical Contract License and Electrical Contract License and
should have GST registration, PF should have GST registration, PF
Registration Certificate. Registration Certificate.
i)In case of bidder meet the above i) In case of bidder meet the above
requirement at 1.0 (d) but not requirement at 1.0 (d) but not
supplied from Indian supplied from Indian
Manufacturing Unit, then the Manufacturing Unit, then the
offered HTLS conductor of offered HTLS conductor of
equivalent size and weight that of equivalent size and weight that of
ACSR DOG conductor suitable ACSR DOG conductor suitable for
for existing 66kV Towers & H existing 66kV Towers & H Frame
Frame shall be supplied from shall be supplied from Indian
Indian Manufacturing Unit only. Manufacturing Unit only.
j)The bidder shall comply the public j) The bidder shall comply the public
procurement guidelines of procurement guidelines of
Government of India dated Government of India dated
2.0 In case the bidder does not meet 2.0 In case the bidder does not meet
technical experience specified at technical experience specified at
1.0 above at its own, the bidder 1.0 above at its own, the bidder
should associate with firm(s) to should associate with firm(s) to
form a JV/Consortium and the form a JV/Consortium and the
JV/Consortium shall collectively JV/Consortium shall collectively
meet the requirement as per 1.0 meet the requirement as per
3.0 However, in respect of supply 3.0 However, in respect of supply
qualifications for supply qualifications for supply
requirement as per 1(b) & 1(d) & requirement as per 1(b) & 1(d) &
1(f), the Indian Licensee / 1(f), the Indian Licensee /
Licensor arrangement is Licensor arrangement is
permitted provided Licensor permitted provided Licensor
meeting the requirement of 1(b) meeting the requirement of 1(b)
,1(d) & 1(f) stated herein above ,1(d) & 1(f) stated herein above
and shall also meet the following and shall also meet the following
conditions; conditions;
I. Manufacturer / Licensee shall I. Manufacturer / Licensee shall
have adequate design have adequate design
infrastructure and manufacturing infrastructure and manufacturing
facility and capacity and facility and capacity and
procedures including quality procedures including quality
control. control.
II. A qualified Licensee of a qualified II.A qualified Licensee of a qualified
Seal & Signature of Bidder
manufacturer / Licensor shall manufacturer / Licensor shall
comply with all the following comply with all the following
requirements and furnish a Joint requirements and furnish a
Undertaking by the Licensor Joint Undertaking by the
along with the bidder in its bid as Licensor along with the bidder
per the Performa enclosed at in its bid as per the Performa
ANNEXURE-I. enclosed at ANNEXURE-I.
a) Any design undertaken by the a) Any design undertaken by the
Licensee shall be approved by the Licensee shall be approved by the
Licensor. Licensor.
b) Manufacturing by the Licensee b) Manufacturing by the Licensee shall
shall be done with the approval of be done with the approval of the
the Licensor and Employer under Licensor and Employer under a
a quality assurance programme quality assurance programme
approved and monitored by the approved and monitored by the
Licensor. Licensor.
c) Licensee must furnish back-up c) Licensee must furnish back-up
guarantee from the Licensor for guarantee from the Licensor for
individual and overall individual and overall performance
performance of all materials of all materials supplied under the
supplied under the contract. contract.
d) Licensor must guarantee d) Licensor must guarantee sequential
sequential and timely supply of and timely supply of materials and
materials and submission of submission of technical information
technical information and data as and data as desired by the
desired by the Employer so as to Employer so as to meet the overall
meet the overall construction construction schedule and
e) The agreement between Licensee
e) The agreement between and Licensor (copy to be submitted
Licensee and Licensor (copy to along with the bid) shall be valid for
be submitted along with the bid) a period of at least five (5) years
shall be valid for a period of at after the guarantee period of
least five (5) years after the equipment and materials under
guarantee period of equipment supply is over.
and materials under supply is
4.0 Bidders under Manufacturer
4.0 Bidders under Manufacturer Authorization: -
Authorization: -
Bidders who are not OEMs are also
Bidders who are not OEMs are
eligible to quote under
also eligible to quote under
manufacturer’s authorization from
manufacturer’s authorization from
Indian conductor manufacturer who
Indian conductor manufacturer
meets the qualifying requirement as
who meets the qualifying
per 1.0 (a, b, d, e, f, i & j) and the
requirement as per 1.0 (a, b, d, e,
bidder shall satisfy all other
f, i & j) and the bidder shall
requirement as per clause 1.0.
satisfy other requirement of
It is also mandatory for such bidders It is also mandatory for such bidders
to provide the manufacturer’s to provide the manufacturer’s
Seal & Signature of Bidder
authorization as per attached authorization as per attached
Annexure – I.A Annexure – I.A
Bidders quoting under manufacture’s Bidders quoting under manufacture’s
authorization must have valid authorization must have valid
Electrical Contractor License, Electrical Contractor License,
registered under GST Act and should registered under GST Act and should
have PF Registration Certificate. have PF Registration Certificate.
5.0 New bidders with proposed 5.0 New bidders with proposed
manufacturing facilities in manufacturing facilities in
New bidders with proposed New bidders with proposed
manufacturing facilities in manufacturing facilities in India
India shall be eligible to bid shall be eligible to bid provided
provided the Technical criteria the Technical criteria as per [A]
as per [A] 1.0 and financial 1.0 and financial criteria as per
criteria as per [B] are to be [B] are to be fully met jointly with
fully met jointly with their their principal as under: -
principal as under: -
1. It should be established through
(i) It should be established authenticated documents like
through authenticated land, Board of directors of the
documents like land, company, company registration,
Board of directors of the collaboration documents etc, that
company, company Indian unit is at the matured
registration, collaboration stage of construction with
documents etc., that required machinery. This will be
Indian unit is at the verified by GETCO as a part of
matured stage of technical bid evaluation prior to
construction with price bid opening. The decision
required machinery. This of GETCO to qualify or not to
will be verified by qualify will be final and binding.
GETCO as a part of
technical bid evaluation 2. 100% HTLS conductor offered
prior to price bid opening. by bidder shall be supplied from
The decision of GETCO Indian Manufacturing Unit only
to qualify or not to qualify
will be final and binding. 3. The new bidder shall carry out
type test report as per technical
(ii) 100% HTLS conductor specification before
offered by bidder shall be commencement of supply and
supplied from Indian without affecting delivery
Manufacturing Unit only schedule.
(iii) The new bidder shall
carry out type test report
as per technical
specification before
commencement of supply
and without affecting
Seal & Signature of Bidder
delivery schedule.
[B] Financial Requirement [B] Financial Requirement
1. Minimum Average Annual
1. Minimum Average Annual Turnover (MAAT) for best three
Turnover (MAAT) for best individual years out of last five
three individual years out of financial years shall not be less
last five financial years shall than the 50% of estimated
not be less than the 50% of amount of this tender.
estimated amount of this
tender. Minimum Average Annual
Turnover (MAAT) of the
Minimum Average Annual consortium/ Joint Venture (JV)
Turnover (MAAT) of the company added together for
consortium/ Joint Venture best three individual years out of
(JV) company added together last five financial years shall not
for best three individual years be less than the 50% of the
out of last five financial years estimated cost. However
shall not be less than the 50% Minimum Average Annual
of the estimated cost. Turnover (MAAT) for best three
However Minimum Average individual years out of last five
Annual Turnover (MAAT) for financial years of the lead
best three individual years out partner shall be at least 25% of
of last five financial years of the estimated cost & for each
the lead partner shall be at other partners shall be at least
least 25% of the estimated 17% of the estimated cost.
cost & for each other partners
shall be at least 17% of the 2. Last Financial Year Liquid Assets
estimated cost. should not be less than 20% of
estimated amount of this tender.
2. Last Financial Year Liquid Assets
should not be less than 20% of Last Financial year liquid asset of the
estimated amount of this tender. consortium/ Joint Venture (JV)
company added together should not
Last Financial year liquid asset of be less than20% of estimated
the consortium/ Joint Venture (JV) amount of offered quantities as on
company added together should invitation of tender. However, Last
not be less than20% of estimated Financial year Liquid assets ofthe
amount of offered quantities as on lead partner shall be 10% of
invitation of tender. However, Last estimated Cost as on invitation of
Financial year Liquid assets ofthe tender and for each other partners
lead partner shall be 10% of shall be at least 7%of estimated cost
estimated Cost as on invitation of as on invitation of tender
tender and for each other partners
shall be at least 7%of estimated Note: For the purpose of arriving at
cost as on invitation of tender LA Current Assets Less Inventories
shall be considered.
Note: For the purpose of arriving
at LA Current Assets Less
Inventories shall be considered. 3. Bidder’s/ all the partner of
consortium/joint venture Net
Worth for last financial years
Seal & Signature of Bidder
3. Bidder’s/ all the partner of should be positive..
consortium/joint venture Net Note: -
Worth for last financial years Net worth means paid up share
should be positive.. capital, Share Application Money
Note: - pending allotment* and reserves#
Net worth means paid up share less accumulated losses and
capital, Share Application Money deferred expenditure to the extent
pending allotment* and reserves# not written off.
less accumulated losses and # Reserves to be considered for the
deferred expenditure to the extent purpose of net worth shall be all
not written off. reserves created out of the profits
# Reserves to be considered for and securities premium account but
the purpose of net worth shall be shall not include reserves created out
all reserves created out of the of revaluation of assets, write back of
profits and securities premium depreciation and amalgamation.
account but shall not include * Share Application Money pending
reserves created out of allotment will be considered only in
revaluation of assets, write back respect of share to be allotted
of depreciation and
amalgamation. 4. The bidder / all the partner of
* Share Application Money pending consortium/joint venture should not
allotment will be considered only have been referred to NCLT under
in respect of share to be allotted Insolvency &Bankruptcy Code (IRP
has been appointed or Liquidation
4. The bidder / all the partner of proceedings have been initiated
consortium/joint venture should under IBC).. shall be the same.
not have been referred to NCLT
under Insolvency &Bankruptcy Note: -
Code (IRP has been appointed or Bidder to evidence the meeting of
Liquidation proceedings have financial criteria shall submit:
(i) CA Certificate with valid UDIN
been initiated under IBC).. shall
Number failing which certificate
be the same. shall not be considered for the
purpose of evaluationand
Note: - (ii) Audited Balance Sheet and
Bidder to evidence the meeting of Profit & Loss account along with the
financial criteria shall submit: schedules referred therein and the
(i) CA Certificate with valid UDIN Auditor’s Reportfor the preceding
Number failing which certificate five financial years, in line with one
shall not be considered for the of the following
purpose of evaluationand (a) In case last financial year’s
(ii) Audited Balance Sheet and closing date was within 6 months
Profit & Loss account along with prior to bid due date and audited
the schedules referred therein and Balance Sheet andProfit & Loss
the Auditor’s Reportfor the account of last financial year are not
preceding five financial years, in available, bidder has the option to
line with one of the following submit the financial details of
(a) In case last financial year’s fiveprevious years immediately prior
closing date was within 6 months to the last financial year. For
prior to bid due date and audited example, in case bid due date is up
Balance Sheet andProfit & Loss to 30th Septemberand financial
account of last financial year are details of immediate preceding
not available, bidder has the option financial years (year ending 31st
to submit the financial details of March of same year) are not
fiveprevious years immediately available, thefinancial details of the
prior to the last financial year. For five previous years immediately
Seal & Signature of Bidder
example, in case bid due date is prior to the last financial year may
up to 30th Septemberand financial be submitted.(b) Otherwise it is
details of immediate preceding compulsory to submit the financial
financial years (year ending 31st details of immediate preceding five
March of same year) are not financial years..
available, thefinancial details of the
five previous years immediately
prior to the last financial year may Details as per qualifying requirement to
be submitted. be submitted along-with offer, in a
(b) Otherwise it is compulsory to separate cover.
submit the financial details of
immediate preceding five financial CA certificate to be attached for
years.. MAAT, LA and Net-worth. (This is
Details as per qualifying requirement Supply/Order executed details for
to be submitted along-with offer, in a offered items with name of purchaser,
separate cover. date and location to be mentioned.
Performance certificate for satisfactory
CA certificate to be attached for operation/working for period as per
MAT. (This is must) qualifying requirement attached with
Supply/Order executed details for specification. (This is must for getting
offered items with name of the offer qualified).
purchaser, date and location to be Under taking in respect of reference to
mentioned. NCLT under Insolvency & Bankruptcy
Performance certificate for Code. The undertaking is to be furnish
satisfactory operation/working for by the bidder in its bid as per the
period as per qualifying format attached herewith as
requirement attached with Annexure–iv and shall be deemed to
specification. (This is must for be part of the bidding scheduled
getting the offer qualified) referred as Annexure–4 to be
uploaded by the bidder with QR bid.
4. Part –I 5.0 Additional Documents: 5.0 Additional Documents:
Special Apart from various documents to be Apart from various documents to be
Conditions of furnished along with the Bid as furnished along with the Bid as required
Contract/ required in the GCC and ECC, the in the GCC and ECC, the following
Clause 5.0 following documents/details are to be documents/details are to be furnished by
and its sub- furnished by the Bidder: the Bidder:
clauses 1. GST Registration No. and 1. GST Registration No. and date
date 2. Registration. No. under Shops &
2. Registration. No. under Establishment Act/ issuing
Shops & Establishment Act/ authority
issuing authority 3. Details of Partners/Directors of
3. Details of Partners/Directors the Firm/Company.
of the Firm/Company.
4. Experience Record and 4. Experience Record and details of
details of orders pending / orders pending / executed for
executed for various utilities various utilities
5. Last five years Audited 5. Last five years Audited Accounts
Accounts 6. Detail of Manufacturing/
6. Detail of Fabrication facilities along with
Manufacturing/Fabrication list of Testing Equipment
facilities along with list of calibrated up to date. The detail
Testing Equipment for the same may be submitted.
calibrated up to date. The 7. Factory Registration / License
detail for the same may be details
8. P.F registration
Seal & Signature of Bidder
7. Factory Registration /
License details
8. Solvency certificate from
Bank (20 % of Bid value).
9. P.F registration
5. Part –I 10.0 PENALTY FOR DELAY: 10.0 LIQUIDATED DAMAGES (LD)
(SCC)/ FOR DELAY:
Conditions of 10.1 The tenderer should note that 10.1 The tenderer should note that the
Contract/ the completion time allowed for completion time allowed for carrying out
Clause 10.0 carrying out the work should be the work should be strictly observed.
and its sub- strictly observed. Any delay that may
Any delay that may take place in
clauses take place in supply and erection
beyond Contractual cut-off date achieving Completion of the works
stated as per stipulated delivery beyond Contractual Time of Completion
period shall be subject to the penalty in the Contract shall be subject to
at the rate of ½ % of the contract Liquidated Damages (LD), and not by
value per week plus GST as way of penalty, at the rate of ½ % of the
applicable on delayed work (supply Contract Price plus GST as applicable,
and erection work) with a ceiling of
per week or part thereof of the delay
10% of the total contract value plus
GST as applicable. subject to a ceiling of 10% (ten percent)
of the Contract Price plus GST as
10.2 In event of failure of the 10.2 In cases where the Completion of
Contractor to pay the amount of the works/ along with supplies extend
Penalty as demanded, the Owner beyond the contractual completion
shall be entitled to deduct the
period, without prejudice to any other
amount of Penalty for delay from
the amounts payable to the right that it may have under the Contract
Contractors under any bills raised or in law, the Owner shall be entitled
under this contract or any other to deduct the amount of LD from the
amount payable under any other amounts payable to the Contractors
contract with the GUVNL and its under any bills raised under this
Subsidiary companies i.e. GETCO,
Contract or any other amount payable
GUVNL, GSECL, MGVCL, DGVCL,
PGVCL, UGCVL. It is permissible for under any other contract with the
the Owner to adjust the amount of GUVNL and its Subsidiary companies
Penalty of delay against any Bank i.e. GETCO, GUVNL, GSECL, MGVCL,
Guarantee furnished by the DGVCL, PGVCL, UGCVL. It is
Contractor under this contract or any permissible for the Owner to adjust the
other contract with GUVNL and/or its amount of LD against any Bank
subsidiary companies.
Guarantee furnished by the Contractor
under this contract or any other contract
with GUVNL and/or its subsidiary
10.3 Notwithstanding the provision of
Clause 10.2, if so requested by the
Contractor, amount from the RA bills,
pending settlement of Liquidated
Damages (LD), shall not be withheld/
retained by the Owner, if adequate
retention payment [over and above
security deposit/ Contract Performance
Guarantee (CPG)] remains to be
Seal & Signature of Bidder
released as per Contract. In case, it is
not so, it shall be examined by the
Owner whether BGs/other securities
(excluding CPG/Security Deposit)
furnished by the Contractor are available
with GETCO, which have partly or fully
served their purpose, and can therefore
be utilized by GETCO to recover LD, if
finally levied. If available, it will be further
checked whether the contractor is willing
to furnish a suitable undertaking
authorizing GETCO to retain those
BGs/security (for such value which along
with retention payments remaining with
GETCO is considered to be sufficient to
take care of maximum leviable LD) to be
kept valid till 6 months beyond the
anticipated completion of the works/
supplies under the Contract. If the
Contractor requests and gives the
undertaking as above and validity of BG
is suitably extended wherever required,
amount from RA bills, pending
settlement of LD, shall not be withheld/
retained on account of LD.
10.3 Tenderer shall have to supply
all materials to match with the 10.4 Tenderer shall have to supply all
erection activities. materials to match with the erection
Seal & Signature of Bidder
BANK GUARANTEE FORM FOR ADVANCE PAYMENT
(For the purpose of verification/confirmation of this Bank Guarantee by the GETCO, the Bank
shall indicate 2 official email ids of the authorized signatories from Issuing Branch and also of
the designated higher office (Corporate Office, Zonal Office etc) in the covering letter of the
Bank forwarding the Bank Guarantee.)
Bank Guarantee No. …………………… Date...................
…………..[Name of Contract]…………………….
To: [Name and address of the Employer/ Owner]
Dear Ladies and/or Gentlemen,
We refer to the Contract ("the Contract") vide Letter of Award issued on ............ (insert date of the
letter of award)….by you (the Employer/ Owner) to M/s ................. (Name of Contractor) ..................,
signed on ..............(insert date of the Contract)…..... between you and M/s ................. (Name of
Contractor) ..................,
having its Principal place of business at ………....(Address of Contractor) ............................... and
Registered Office at ………....(Registered address of Contractor)
…….................….. (Indicate brief scope of work) ............................... for the complete execution of the
…… (insert name of Package along with name of the Project)……..
Whereas, in accordance with the terms of the said Contract, the Employer has agreed to pay or cause
to be paid to the Contractor an interest bearing Advance Payment against furnishing of an irrevocable
bank guarantee for an amount of ………………………..(Amount in figures and words) ……………which
is equal to [{110% (one hundred ten percent) of the amount of Advance} Plus {amount of GST
reimbursable on Advance as per the Proforma invoice, if applicable}].
By this letter we, the undersigned, ………(insert name & address of the issuing bank) ………, a Bank
(which expression shall include its successors, administrators, executors and assigns) organized
under the laws of .................................... and having its Registered/Head Office at …..…….(insert
address of registered office of the bank)……..... do hereby irrevocably guarantee repayment of
………….(Amount of the bank guarantee in figures and words)…………… upon the first demand of the
Employer without cavil or argument in the event that the Contractor fails to commence or fulfill its
obligations under the terms of the said Contract for reasons whatsoever.
Provided always that the Bank's obligation shall be limited to the amount of this Bank guarantee or an
amount equal to the outstanding balance of the Advance Payment and the accrued interest on the
Advance Payment, taking into account such amounts, which have been repaid by the Contractor from
time to time in accordance with the terms of payment of the said Contract, as certified by you.
This Guarantee shall remain in full force from the date upon which the said Advance Payment is
received by the Contractor up to ninety (90) days beyond the date on which the entire Advance
Payment along with the accrued interest if any due thereon has been fully adjusted in terms of the
Contract i.e., up to ninety (90) days beyond the date of Completion of the Facilities under the Contract.
This Guarantee may be extended from time to time, as may be desired by M/s. ………………………..
on whose behalf this Guarantee has been issued.
Any claims to be made under this Guarantee must be received by the Bank during its period of validity,
Seal & Signature of Bidder
i.e. upto ninety (90) days beyond the date of Completion of the Facilities by the Employer i.e. upto and
inclusive of ……………. (dd/mm/yy).
Notwithstanding anything contained herein:
1. Our liability under this Bank Guarantee shall not exceed _________ (value in
2. This Bank Guarantee shall be valid upto ________(validity date)__________.
3. We are liable to pay the guaranteed amount or any part thereof under this Bank Guarantee
only & only if we receive a written claim or demand on or before ________ (validity date)
For and on behalf of the Bank
[Signature of the authorised signatory(ies)]
Designation_______________________
Contact Number(s): Tel.______________Mobile______________
Common Seal of the Bank______________________
Contact Number(s): Tel.______________Mobile______________
1. For the purpose of executing the Bank Guarantee, the non-judicial stamp papers of appropriate
value shall be purchased in the name of Bank who issues the ‘Bank Guarantee’.
2. The Bank Guarantee shall be signed on all the pages by the Bank Authorities indicating their
POA nos. and should invariably be witnessed.
3. The Bank Guarantee should be in accordance with the proforma as provided. However, in
case the issuing bank insists for additional paragraph regarding applicability of ICC
publication No: 758, the following may be added at the end of the proforma of the Bank
Guarantee [i.e., end paragraph of the Bank Guarantee preceding the signature(s) of the
issuing authority(ies) of the Bank Guarantee]:
“This Guarantee is subject to Uniform Rules for Demand Guarantee, ICC publication No.
758 except that article 15(a) is hereby excluded.”
Seal & Signature of Bidder
Specification No: ACE(P&C)/Contracts/ E-455/Uprating/66kV/S&E
Sub: Supply, installation, testing & commissioning of conversion of (1) 66kV Hirapur - Kanbha
line (2) 66kV Juval Rupavati - Kerala line-1 (3) 66KV Juval Rupavati – Kerala line-2 (4) 66kV
Salejada - Ingoli line (5) 66kV Navagam - Jetalpur line (6) 66kV Karamsad- V V Nagar line-1 (7)
66kV Karamsad - V V Nagar line-2 (8) 66kV Singlav - Borsad line (9) 66kV Karamsad - Singlav
line (10) 66kV Kheda - Samadara line (11) 66kV Sabarmati - Godarej line (12) 66kV Godrej -
Tragad line (13) 66kV Khanpur - Bahiyal line with ACSR DOG conductor into equivalent HTLS
Conductor (Equivalent weight of ACSR DOG conductor with Higher Ampacity) of Nadiad Circle.
Option for Initial Advance (either Interest Bearing Initial Advance of No Initial Advance or No Initial
Chief Engineer (Procurement & Contracts)
Gujarat Energy Transmission Co. Ltd.,
Corporate office,
I. We have read the provision in the Bidding Documents regarding furnishing the option for
advance payment. Accordingly, as per clause GCC 86.1.1 (For Supply) and GCC 86.2.1 (b)
(For Erection) provided in Amendment-I of the Bidding Documents, we hereby confirm to opt
Interest Bearing Initial Advance:
Supply Portion: (Ref GCC 86.1.1) *
Erection Portion: (Ref GCC 86.2.1 (b)) *
* ‘Yes’ or ‘No’ to be filled up by the Bidder. ‘Yes” shall mean that Bidder has opted for the
Interest Bearing Advance and ‘No’ shall mean that Bidder has not opted for the Interest Bearing
Advance. If nothing is mentioned, it shall mean that Bidder has not opted for the Interest
Bearing Advance.
(Name of Authorized Signatory of Bidder)
Seal & Signature of Bidder
Specification No: ACE(P&C)/Contracts/E-455/Uprating/66kV/S&E
Sub: Supply, installation, testing & commissioning of conversion of (1) 66kV Hirapur - Kanbha
line (2) 66kV Juval Rupavati - Kerala line-1 (3) 66KV Juval Rupavati – Kerala line-2 (4) 66kV
Salejada - Ingoli line (5) 66kV Navagam - Jetalpur line (6) 66kV Karamsad- V V Nagar line-1 (7)
66kV Karamsad - V V Nagar line-2 (8) 66kV Singlav - Borsad line (9) 66kV Karamsad - Singlav
line (10) 66kV Kheda - Samadara line (11) 66kV Sabarmati - Godarej line (12) 66kV Godrej -
Tragad line (13) 66kV Khanpur - Bahiyal line with ACSR DOG conductor into equivalent HTLS
Conductor (Equivalent weight of ACSR DOG conductor with Higher Ampacity) of Nadiad Circle.
In connection with above subject, I / we confirm that our firm is not declared in NCLT under
Insolvency & Bankruptcy Code. Further, I / we also agree that, if any found NCLT under
Insolvency & Bankruptcy Code, the offer shall be out rightly rejected without assigning any
reason thereof.
Signature of Authorized
Representative of Company/Agency
Name of bidder Company
Seal & Signature of Bidder
(On the letter pad of the company)
Declaration of Conflict of Interest
Additional Chief Engineer(Procurement & Contracts),
Gujarat Energy Transmission Corporation Limited,
8th Floor,Sardar patel Vidyut Bhavan,
Vadodara-390007
Ref: Tender Notice No…………………………………
With refrence to above your tender Notice No……………………………………………..
For the work of………………………………………………………………
We do not have any conflict of interest with any other bidder who has submitted the bid in
Yours Faithfully,
Seal & Signature of Bidder
(On the letter pad of the company)
Declaration of Relationship with employee
Additional Chief Engineer(Procurement & Contracts),
Gujarat Energy Transmission Corporation Limited,
8th Floor,Sardar patel Vidyut Bhavan,
Vadodara-390007
Ref: Tender Notice No…………………………………
With reference to above your tender Notice No……………………………………………..
For the work of………………………………………………………………
“If in any Bidder Company/firm, the interest(i.e. shareholding in company and share in
partnership firm) of any employee of the tendering company or his/her relative as defined in
section 2(77) of the company’s Act 2013 is 10% or more, the tendering Company will not
deal with such Company/Firm at all.”
As per clause, we do not have any type of relationship with any current employees of
tendering Company.
Yours Faithfully,
(Note: If you have any relationship with employee, give declaration as per tender clause.)
Seal & Signature of Bidder
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
4. EMD BG Format.pdf
2. Amendment -I Part-I Tender Specifications E-455.pdf
3. L2 Schedule Dog to HTLS Nadiad Circle.pdf
4. EMD BG Format.pdf
5. SD cum PBG Format.pdf
6. 66KV HIRAPUR - KANBHA LINE.pdf
7. 66KV SC JUVAL RUPAVATI - KERALA LINE - 01.pdf
8. 66KV SC JUVAL RUPAVATI - KERALA LINE - 02.pdf
9. 66 kV Salejada Ingoli Line.pdf
10. 66KV HF JETALPUR - NAVAGAM LINE.pdf
11. 66kv H-Frame Karamsad-Vidyanagar Line -1.pdf
12. 66kv H-Frame Karamsad-Vidyanagar Line - 2.pdf
13. 66kV Singlav-Borsad Line.pdf
14. 66kV Karamsad-Singlav Line.pdf
15. 66KV HF KHEDA - SAMADRA LINE.pdf
16. 66kv Sabarmati - Godrej Line.pdf
17. 66kv Godrej - Tragad -01 Line.pdf
18. 66kv Khanpur - Bahiyal - 01 Line.pdf
File and drawing list E-455.pdf
Public Procurement Circular of GOI.pdf
R1_66KV_HTLS_specs.pdf
Addendum for core.pdf
Form for Networth Annual turnover LA.pdf
Annexure I and IA.pdf
Online Schedule-QR-E-455.pdf
ONLINE SCHEDULE_TECH - E-455.pdf
PB Part-III Nadiad Circle E-455.pdf
1. Part-I Tender Spe. - Uprating of 66kV lines E-455.pdf
Tender Notice HTLS Nadiad Circle E-455.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .