| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.9 LAccepted-AOC PO PS BANDERDEVA DIST PAPUM PARE ARUNACHAL PRADESH PIN 791123 | PAPUM PARE | ARUNACHAL PRADESH | 791123 | ₹29.9 L Quoted ₹31.0 L | L1 | Accepted-AOC L1 BIDDER |
| 2 | L2₹31.9 L+₹86,973.40 (2.81%)Rejected-Finance AT ROAD NEAR MES TINALI PO CHABUA DIST DIBRUGARH ASSAM | ₹31.9 L+₹86,973.40 (2.81%) | L2 | Rejected-Finance HIGHER THAN L1 BIDDER |
| 3 | L3₹32.0 L+₹1.0 L (3.26%)Rejected-Finance | ₹32.0 L+₹1.0 L (3.26%) | L3 | Rejected-Finance HIGHER THAN L1 BIDDER |
| 4 | L4₹33.1 L+₹2.1 L (6.74%)Rejected-Finance BORBARUAH BAZAR A T ROAD DIBRUGARH ASSAM | ₹33.1 L+₹2.1 L (6.74%) | L4 | Rejected-Finance HIGHER THAN L1 BIDDER |
| 5 | L5₹33.6 L+₹2.6 L (8.36%)Rejected-Finance | ₹33.6 L+₹2.6 L (8.36%) | L5 | Rejected-Finance HIGHER THAN L1 BIDDER |
| Sl No | Description | Qty | Unit | M/S Abhi Traders L4 | M/S RK Trading L2 | M/S P S ENTERPRISES L6 | Arun Moni Phukan L3 | ABOTANI ENTERPRISE L1 | SAHASRA CONSTRUCTION L7 | Saranga Saikia L8 | MANASEE L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | M & L for Opening the cover and cleaning of septic tanks, sumps, manholes etc of any capacity (of depth n.exc 1.5m), by dewatering foul water and taking out night soil, excreta, sludge, etc by HCV Mounted Suction Discharge Machine having Blow Back Facitlity with Sludge Tank (Minimum 2000 Litre capacity) as required to keep complete Sewage System functional and to avoid any over flowing including removal and disposal of pumped out Sewage water, sludges etc in any form or any other materials etc to outside of MD land to a distanceexc 500m to n.exc 1.0 Km, burried underground (minimum 45 cm covered with soil over two layer of bamboo matting without manitaining any gap) including sprinkling bleaching powder @ not less than 0.50 Kg/Sqm on deposit sludge at earth pit and as ordered by the Engr-in-Charge to keep the whole station area pollution free including necessary excavation and earthwork in soft/loose soil for pits, returning, filling in and dressing of surplus soil around to slope as required including refixing the cover in position and cleaning the eitre area and making good damaged portion (if any) complete all as specified and directed.
(Note : (i) Depth of sludge shall only be measured for volume.
(ii) The item is measurable/operative only ONCE during the entire contract period. Any additional cleaning if required, contractor shall be carried out the same without any extra cost to the Govt, (iii) Each trip of tanker to be taken outside of MD land in presence of concerned JE/Engr-in-Charge. (iv) The cost of bleaching powder, bamboo matting, all necessary earth work, T & P etc as required for cleaning and removal of sludge shall demmed to be included in the unit quoted rate ) | 225 | Cum | 787 ₹1,77,075 | 757 ₹1,70,325 | 765 ₹1,72,125 | 787 ₹1,77,075 | 750 ₹1,68,750 Lowest | 830 ₹1,86,750 | 770 ₹1,73,250 | 805 ₹1,81,125 |
| 2.00 | All as per Serial Item No. 64 Above but depth of septic tank exc 1.5m and n.exc 3.0m complete ditto | 60 | Cum | 630 ₹37,800 | 606 ₹36,360 | 630 ₹37,800 | 630 ₹37,800 | 600 ₹36,000 Lowest | 665 ₹39,900 | 635 ₹38,100 | 647 ₹38,820 |
| 3.00 | M & L for Cleaning of sewage lines 100/110 mm bore by rodding from Man holes to enable the sewage to flow freely to the next manholes, inluding disposing off sludge and other materials obtained from the sewage line to a distance outside MD land, burried under ground (minimum 30 cm below ground level) including necessary excavation of pits in soft/loose soil and returning, filling in including sprinkling of bleaching powder at the rate of 0.50 kg/Sqm and dressing of surplus soil around slope complete all as directed by the Engr-in-Charge. (Note: The item is measurable upto thrice during the entire contract period. Any additional cleaning if required, contractor shall be liable to clean the same without any extra cost to the Govt.) | 600 | RM | 105 ₹63,000 | 101 ₹60,600 | 110 ₹66,000 | 105 ₹63,000 | 100 ₹60,000 | 109 ₹65,400 | 95 ₹57,000 Lowest | 105 ₹63,000 |
| 4.00 | M & L for Cleaning of sewage lines 150/160 mm bore by rodding from Man holes to enable the sewage to flow freely to the next manholes, inluding disposing off sludge and other materials obtained from the sewage line to a distance outside MD land, burried under ground (minimum 30 cm below ground level) including necessary excavation of pits in soft/loose soil and returning, filling in including sprinkling of bleaching powder at the rate of 0.50 kg/Sqm and dressing of surplus soil around slope complete all as directed by the Engr-in-Charge. (Note: The item is measurable upto thrice during the entire contract period. Any additional cleaning if required, contractor shall be liable to clean the same without any extra cost to the Govt.) | 250 | RM | 157 ₹39,250 | 151 ₹37,750 | 145 ₹36,250 Lowest | 157 ₹39,250 | 150 ₹37,500 | 164 ₹41,000 | 150 ₹37,500 | 165 ₹41,250 |
| 5.00 | M & L for Cleaning the blockage in the WC/floor trap/nahani trap etc completely to enable the sewage to flow freely to the next gully trap/manholes, removing the sludge and other materials from the Manholes by suitable means and removing all the materials obtained from the manholes out side MD land and cleaning the complete area including making good any damages gully trap complete all as directed by the Engr-in-Charge. (Note: The item is measurable upto thrice during the entire contract period. Any additional cleaning if required, contractor shall be liable to clean the same without any extra cost to the Govt.) | 300 | Each Job | 157 ₹47,100 | 151 ₹45,300 | 175 ₹52,500 | 157 ₹47,100 | 150 ₹45,000 Lowest | 164 ₹49,200 | 168 ₹50,400 | 158 ₹47,400 |
| 6.00 | M & L for Opening the cover and Cleaning of Manholes of any depth n.exc 0.5m and of any size by pumping out the sewage water completely inluding disposing off sludge and other materials obtained from the manholes to a distance outside MD land, burried under ground (minimum 45 cm below ground level) including necessary excavation of pits in soft/loose soil and returning, filling in including sprinkling of bleaching powder at the rate of 0.50 kg/Sqm and dressing of surplus soil around slope complete all as directed by the Engr-in-Charge. (Note: The item is measurable upto thrice during the entire contract period. Any additional cleaning if required, contractor shall be liable to clean the same without any extra cost to the Govt.) | 160 | Each Job | 787 ₹1,25,920 | 757 ₹1,21,120 | 775 ₹1,24,000 | 787 ₹1,25,920 | 750 ₹1,20,000 Lowest | 826 ₹1,32,160 | 780 ₹1,24,800 | 809 ₹1,29,440 |
| 7.00 | Excavation in trenches, not exceeding 1.5 M wide and not exceeding 1.5 M depth for foundation, trenches for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10sq m on plan and n exc 1.5m in depth and getting out in soft/loose soil complete all as specified and directed. | 68.5 | Cum | 525 ₹35,962.5 | 505 ₹34,592.5 | 525 ₹35,962.5 | 525 ₹35,962.5 | 500 ₹34,250 Lowest | 551 ₹37,743.5 | 530 ₹36,305 | 540 ₹36,990 |
| 8.00 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm as in soft/loose soil complete all as specified and directed. | 61.65 | Cum | 472 ₹29,098.8 | 454 ₹27,989.1 | 475 ₹29,283.75 | 472 ₹29,098.8 | 450 ₹27,742.5 Lowest | 495 ₹30,516.75 | 480 ₹29,592 | 480 ₹29,592 |
| 9.00 | Removing excavated material not exc. 50 m and depositing where directed at a level not exc 1.5 m above the starting point complete all as specified and directed. | 6.85 | Cum | 420 ₹2,877 | 404 ₹2,767.4 | 435 ₹2,979.75 | 420 ₹2,877 | 400 ₹2,740 Lowest | 440 ₹3,014 | 440 ₹3,014 | 433 ₹2,966.05 |
| 10.00 | Taking down eaves gutters and rainwater/soil/waste pipes (any size or pattern), including all fittings, heads, shoes, bends, swan-necks, etc., including removal to Store (measured overall as fixed along the centre line over fittings and accessories) complete all as specified and directed | 100 | RM | 63 ₹6,300 | 60 ₹6,000 Lowest | 85 ₹8,500 | 63 ₹6,300 | 60 ₹6,000 Lowest | 65 ₹6,500 | 90 ₹9,000 | 61 ₹6,100 |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
16 May 2026, 6:00 pmClosed
GE 872 EWS
GE 872 EWS
REPAIRS CLEANING OF SEWAGE LINE, MANHOLE, SEPTIC TANK/SOAKAGE WELL, REPAIRS OF PATH, HARDSTANDING, CULVERT, FENCING AND PERIODICAL SERVICE OF CERTAIN BUILDING AT BORARUPAK MIL STN UNDER GE 872 EWS
2026_MES_762018_1
8846/E8
Open Tender
Civil Works
Item Rate
270 days
BORARUPAK
All as per NIT
7 documents required · 7 mandatory
₹500
GE 872 EWS
₹60,000
2 Jul 2026
24 Apr 2026
18 May 2026
24 Apr 2026
16 May 2026
9 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M & L for Opening the cover and cleaning of septic tanks, sumps, manholes etc of any capacity (of depth n.exc 1.5m), by dewatering foul water and taking out night soil, excreta, sludge, etc by HCV Mounted Suction Discharge Machine having Blow Back Facitlity with Sludge Tank (Minimum 2000 Litre capacity) as required to keep complete Sewage System functional and to avoid any over flowing including removal and disposal of pumped out Sewage water, sludges etc in any form or any other materials etc to outside of MD land to a distanceexc 500m to n.exc 1.0 Km, burried underground (minimum 45 cm covered with soil over two layer of bamboo matting without manitaining any gap) including sprinkling bleaching powder @ not less than 0.50 Kg/Sqm on deposit sludge at earth pit and as ordered by the Engr-in-Charge to keep the whole station area pollution free including necessary excavation and earthwork in soft/loose soil for pits, returning, filling in and dressing of surplus soil around to slope as required including refixing the cover in position and cleaning the eitre area and making good damaged portion (if any) complete all as specified and directed.
(Note : (i) Depth of sludge shall only be measured for volume.
(ii) The item is measurable/operative only ONCE during the entire contract period. Any additional cleaning if required, contractor shall be carried out the same without any extra cost to the Govt, (iii) Each trip of tanker to be taken outside of MD land in presence of concerned JE/Engr-in-Charge. (iv) The cost of bleaching powder, bamboo matting, all necessary earth work, T & P etc as required for cleaning and removal of sludge shall demmed to be included in the unit quoted rate ) | 225 | Cum | - | - |
| 2 | All as per Serial Item No. 64 Above but depth of septic tank exc 1.5m and n.exc 3.0m complete ditto | 60 | Cum | - | - |
| 3 | M & L for Cleaning of sewage lines 100/110 mm bore by rodding from Man holes to enable the sewage to flow freely to the next manholes, inluding disposing off sludge and other materials obtained from the sewage line to a distance outside MD land, burried under ground (minimum 30 cm below ground level) including necessary excavation of pits in soft/loose soil and returning, filling in including sprinkling of bleaching powder at the rate of 0.50 kg/Sqm and dressing of surplus soil around slope complete all as directed by the Engr-in-Charge. (Note: The item is measurable upto thrice during the entire contract period. Any additional cleaning if required, contractor shall be liable to clean the same without any extra cost to the Govt.) | 600 | RM | - | - |
| 4 | M & L for Cleaning of sewage lines 150/160 mm bore by rodding from Man holes to enable the sewage to flow freely to the next manholes, inluding disposing off sludge and other materials obtained from the sewage line to a distance outside MD land, burried under ground (minimum 30 cm below ground level) including necessary excavation of pits in soft/loose soil and returning, filling in including sprinkling of bleaching powder at the rate of 0.50 kg/Sqm and dressing of surplus soil around slope complete all as directed by the Engr-in-Charge. (Note: The item is measurable upto thrice during the entire contract period. Any additional cleaning if required, contractor shall be liable to clean the same without any extra cost to the Govt.) | 250 | RM | - | - |
| 5 | M & L for Cleaning the blockage in the WC/floor trap/nahani trap etc completely to enable the sewage to flow freely to the next gully trap/manholes, removing the sludge and other materials from the Manholes by suitable means and removing all the materials obtained from the manholes out side MD land and cleaning the complete area including making good any damages gully trap complete all as directed by the Engr-in-Charge. (Note: The item is measurable upto thrice during the entire contract period. Any additional cleaning if required, contractor shall be liable to clean the same without any extra cost to the Govt.) | 300 | Each Job | - | - |
| 6 | M & L for Opening the cover and Cleaning of Manholes of any depth n.exc 0.5m and of any size by pumping out the sewage water completely inluding disposing off sludge and other materials obtained from the manholes to a distance outside MD land, burried under ground (minimum 45 cm below ground level) including necessary excavation of pits in soft/loose soil and returning, filling in including sprinkling of bleaching powder at the rate of 0.50 kg/Sqm and dressing of surplus soil around slope complete all as directed by the Engr-in-Charge. (Note: The item is measurable upto thrice during the entire contract period. Any additional cleaning if required, contractor shall be liable to clean the same without any extra cost to the Govt.) | 160 | Each Job | - | - |
| 7 | Excavation in trenches, not exceeding 1.5 M wide and not exceeding 1.5 M depth for foundation, trenches for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10sq m on plan and n exc 1.5m in depth and getting out in soft/loose soil complete all as specified and directed. | 68.5 | Cum | - | - |
| 8 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm as in soft/loose soil complete all as specified and directed. | 61.65 | Cum | - | - |
| 9 | Removing excavated material not exc. 50 m and depositing where directed at a level not exc 1.5 m above the starting point complete all as specified and directed. | 6.85 | Cum | - | - |
| 10 | Taking down eaves gutters and rainwater/soil/waste pipes (any size or pattern), including all fittings, heads, shoes, bends, swan-necks, etc., including removal to Store (measured overall as fixed along the centre line over fittings and accessories) complete all as specified and directed | 100 | RM | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
Tender8846.pdf
Tender Documents • 1.34 MB
BOQ_853562.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .