Executive Engineer RnB Beerwah
Executive Engineer RnB Beerwah
Construction of ACR at HS Bundgam
2026_PWDJK_313004_3
NIT No.20 of 2026-27
Open Tender
Civil Works
120 days
Beerwah
As per NIT
2 documents required · 2 mandatory
₹600
Executive Engineer RNB Division Beerwah
₹20,800
19 Jun 2026
19 Jun 2026
2 Jul 2026
19 Jun 2026
1 Jul 2026
19 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 15.72 | CUM | 256.85 | ₹4,037.68 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 11 | CUM | 218.4 | ₹2,402.4 |
| 3 | Providing and laying stone soling / boulders hand packed including compacting, watering including all carriages of material complete. | 13.87 | CUM | 1,000 | ₹13,870 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 3.25 | CUM | 5,202.9 | ₹16,909.43 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 4.03 | CUM | 7,788.4 | ₹31,387.25 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 12.14 | CUM | 6,591.25 | ₹80,017.78 |
| 7 | Centring and shuttering including strutting proping and removal of form work for foundations, footings, bases of columns etc for mass concrete. | 55.43 | SQM | 286.35 | ₹15,872.38 |
| 8 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:4 ( 1 cement : 4 coarse sand). Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 8.75 | CUM | 9,333.05 | ₹81,664.19 |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain indow sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with :1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 5.25 | CUM | 9,821.85 | ₹51,564.71 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1,252.87 | KGS | 123.2 | ₹1,54,353.58 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
BOQ_1013046.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid