Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.0 LAccepted-Finance VILL MOHISGOTE DHALIPARA P O KRISHNAPUR KOLKATA 700102 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700102 | L1 | Accepted-Finance L1 | |
| 2 | L2₹9.1 L+₹6,689.60 (0.74%)Rejected-Finance MAHESGOTE KRISHNAPUR ROAD NEW TOWN 24 PGS N KOLKATA 700102 | KOLKATA | NORTH 24 PARGANAS | WEST BENGAL | 700102 | L2 | Rejected-Finance L2 | |
| 3 | L3₹11.4 L+₹2.4 L (26.9%)Rejected-Finance 77 1 DAKSHINBARA ROAD BAGUIATI KOLKATA 700028 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700028 | L3 | Rejected-Finance L3 | |
| 4 | L4₹11.6 L+₹2.6 L (28.9%)Rejected-Finance 4A HARMOHAN GHOSH LANE KOLKATA 700085 | KOLKATA | KOLKATA | WEST BENGAL | 700085 | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | POWER POINT L4 | BASCON L1 | SARKAR POWER ENGINEERING PVT. LTD. L3 | B.R.CONSTRUCTION L2 |
|---|---|---|---|---|---|---|---|
| 1.00LAYING OF 33KV 3C400SQMM XLPE CABLE | |||||||
| 1.01 | Survey of HT cable route as per instruction of Site Engineer and submission of route survey drawing inscribing different land marks | 819 | Mtr. | 4 ₹3,276 | 2.7 ₹2,211.3 Lowest | 3 ₹2,457 | 3 ₹2,457 |
| 1.02 | Excavation of soil along the existing cable route for formation of cable trenchs along with up-rooting of protective covers in the existing trench and re-instatement of same cable trench with the excavated soil after erection of protective covers. (L x 0.75 x 1.2) (L=434m) | 390.6 | Cum | 28 ₹10,936.8 | 27 ₹10,546.2 Lowest | 27 ₹10,546.2 Lowest | 27 ₹10,546.2 Lowest |
| 1.03 | Excavation of Cement Concrete/Paver block/brick massonary along the existing cable route for formation of cable trenchs along with up-rooting of protective covers in the existing trench and re-instatement of same cable trench with the excavated soil after erection of protective covers. (L x 0.75 x 1.2) (L=63m) | 56.7 | Cum | 140 ₹7,938 | 137 ₹7,767.9 | 135 ₹7,654.5 Lowest | 138 ₹7,824.6 |
| 1.04 | Excavation of soil for making of trial hole as per instruction of the site engineer including backfilling the excavated soil ( 6(L) 3 x 0.75(W) x 1.2M depth) | 16.2 | Cum | 35 ₹567 | 33 ₹534.6 Lowest | 34 ₹550.8 | 34 ₹550.8 |
| 1.05 | Double cable Laying & dressing of 33KV 3Cx400sq.mm. XLPE Cable in the excavated cable trenchs as per drawing no. PLN(D)/SS/126 Dated 23.06.2018 and instruction of the site engineer where brick protection required in single line formation. | 497 | Mtr. | 76 ₹37,772 | 52 ₹25,844 | 75 ₹37,275 | 50 ₹24,850 Lowest |
| 1.06 | Double cable Laying & dressing of 33KV 3Cx400sq.mm. XLPE Cable inside consumer premises R/L-350 as per drawing no. PLN(D)/SS/126 Dated 23.06.2018 and instruction of the site engineer where brick protection is not required in single line formation | 103 | Mtr. | 118 ₹12,154 | 80 ₹8,240 | 115 ₹11,845 | 75 ₹7,725 Lowest |
| 1.07 | Laying & dressing of 33KV 3Cx400sq.mm. XLPE Cable through HDPE pipe R/L-460 as per drawing no. PLN(D)/SS/126 Dated 23.06.2018 and instruction of the site engineer where brick protection is not required in single line formation. | 460 | Mtr. | 76 ₹34,960 | 42 ₹19,320 Lowest | 75 ₹34,500 | 50 ₹23,000 |
| 1.08 | Micro tunnelling work with laying of HDPE pipe across the road including supply of HDPE Pipe of PE-80, PN-4, 200 mm Dia. As per IS : 4984-2016 excluding rate of cable laying & dressing . | 460 | Mtr. | 1,541 ₹7,08,860 | 1,145 ₹5,26,700 Lowest | 1,540 ₹7,08,400 | 1,150 ₹5,29,000 |
| 1.09 | Supply & Making of Outoor type End termination Joint suitable for 33KV. 3x400sqmm. XLPE cable | 1 | No. | 8,745 ₹8,745 | 7,300 ₹7,300 | 8,700 ₹8,700 | 7,200 ₹7,200 Lowest |
Tender Value
₹11.5 L
EMD Value
₹22,986
Closing Date
24 Aug 2026, 2:00 pmClosed
DM, Newtown Division
Newtown Division Office,2nd Floor, Finance Building, Plot no- CBD-1 ,AA-II, Newtown,Kol-700161
Laying of 02 Nos. 3X400 Sq. mm. cable for making LILO arrangement from 33KV Tata Medical Feeder upto 33 KV, 4 -Panel Shunt Trip RMU with VCB including supply of Jointing kits for supply of bulk power at 33 KV to The Institute Of Computer Engineer(Ind
2026_WBSED_1035600_1
DM/NTD/E-TENDER/ 2026-27/283/1113 Dated 31/07/2026
Open Tender
CIVIL AND ELECTRICAL WORKS
Item Rate
120 days
Newtown Division Office, 2nd Floor, Finance Buildin
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹22,986
Newtown Division Office,2nd Floor, Finance Buildin
11 Sept 2026
10 Aug 2026
27 Aug 2026
10 Aug 2026
24 Aug 2026
10 Aug 2026
14 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1LAYING OF 33KV 3C400SQMM XLPE CABLE | |||||
| 1.01 | Survey of HT cable route as per instruction of Site Engineer and submission of route survey drawing inscribing different land marks | 819 | Mtr. | 3 | ₹2,457 |
| 1.02 | Excavation of soil along the existing cable route for formation of cable trenchs along with up-rooting of protective covers in the existing trench and re-instatement of same cable trench with the excavated soil after erection of protective covers. (L x 0.75 x 1.2) (L=434m) | - | Cum | 27 | - |
| 1.03 | Excavation of Cement Concrete/Paver block/brick massonary along the existing cable route for formation of cable trenchs along with up-rooting of protective covers in the existing trench and re-instatement of same cable trench with the excavated soil after erection of protective covers. (L x 0.75 x 1.2) (L=63m) | - | Cum | 138 | - |
| 1.04 | Excavation of soil for making of trial hole as per instruction of the site engineer including backfilling the excavated soil ( 6(L) 3 x 0.75(W) x 1.2M depth) | - | Cum | 34 | - |
| 1.05 | Double cable Laying & dressing of 33KV 3Cx400sq.mm. XLPE Cable in the excavated cable trenchs as per drawing no. PLN(D)/SS/126 Dated 23.06.2018 and instruction of the site engineer where brick protection required in single line formation. | 497 | Mtr. | 75 | ₹37,275 |
| 1.06 | Double cable Laying & dressing of 33KV 3Cx400sq.mm. XLPE Cable inside consumer premises R/L-350 as per drawing no. PLN(D)/SS/126 Dated 23.06.2018 and instruction of the site engineer where brick protection is not required in single line formation | 103 | Mtr. | 117 | ₹12,051 |
| 1.07 | Laying & dressing of 33KV 3Cx400sq.mm. XLPE Cable through HDPE pipe R/L-460 as per drawing no. PLN(D)/SS/126 Dated 23.06.2018 and instruction of the site engineer where brick protection is not required in single line formation. | 460 | Mtr. | 75 | ₹34,500 |
| 1.08 | Micro tunnelling work with laying of HDPE pipe across the road including supply of HDPE Pipe of PE-80, PN-4, 200 mm Dia. As per IS : 4984-2016 excluding rate of cable laying & dressing . | 460 | Mtr. | 1,540.27 | ₹7,08,524.2 |
| 1.09 | Supply & Making of Outoor type End termination Joint suitable for 33KV. 3x400sqmm. XLPE cable | 1 | No. | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.69 MB
BOQ_2543870.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .