| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹4.3 L+₹35,415 (8.95%)Rejected-AOC | L2 | Rejected-AOC Second lowest |
Tender Value
Refer Docs
EMD Value
₹9,413
Closing Date
21 Nov 2024, 3:00 pmClosed
Assistant Executive Engineer
Office of the Assistant Executive, Electrical wing irrigation Sub division Aluva
G E N E R A L - A M C 2 0 2 4 - 2 5 - F u l l y Comprehensive Annual Maintenance Contract of Kanjoor LIS under Electrical irrigation section Kalady-General Electrical Work
2024_Irrig_694670_24
PWD/BLDG/KLDY/6889/2024-2025
Open Tender
Electrical Works
Item Wise
365 days
Kalady
Please refer Tender documents.
11 documents required · 11 mandatory
₹830
₹9,413
3 Feb 2025
12 Nov 2024
23 Nov 2024
12 Nov 2024
21 Nov 2024
12 Nov 2024
Amount
Motor Overhauling Works
OD239058/2023-2024:Dismantling the 60 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
OD239059/2023-2024:Dismantling the 160 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
OD255775/2023-2024:Dismantling the 190 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
OD255776/2023-2024:Dismantling the 120 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, refitting the motor in position coupling with pump correcting alignment and giving connection, test running with full load including scrapping, cleaning and painting the motor pumpset, base plate etc.with enamel paint.
Motor Lowering Works
OD238378/2023-2024: Lowering down and erecting 10 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD255820/2023-2024: Lowering down and erecting 5 HP motor and erecting the motor on the base plate coupling with pump in position giving connections checking correct alignment and trial run on full load
OD238380/2023-2024: Lowering down and erecting 60 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD238382/2023-2024: Lowering down and erecting 190 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD255824/2023-2024: Lowering down and erecting above 160 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD255832/2023-2024: Lowering down and erecting above 120 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
Consumables and Supplies
OD76396/2024-2025:Supply and filling oil for pumps
OD238388/2023-2024:Supply and renewal of Multifunction meter to read: multifunction meter to read VA,PF,KW,KWh, accuracy class-1 LCD in panel board after dismantling the damaged one, L&T or Equivalent make.
OD238389/2023-2024: Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one
OD238390/2023-2024:Supply and Installing 20 W LED Tube light.
OD238391/2023-2024:Supply and clamping the 25 x 3mm GI strips on surface of wall/ parapet/ existing cable tray using clamps fabricated from 20 x 3 mm GI flat duly painted or heavy duty GI spacer saddles, spacing of clamps not exceeding 1m, making good the damages, colour washing etc. as required (for horizontal run).
OD238392/2023-2024:Supply and renewal of Three Phase digital Ammeter accuracy class 1 in panel board after dismantling the damaged one, L&T or equivalent make.
OD238393/2023-2024:Supply and renewal of Three Phase Digital Voltmeter accuracy class 1 in panel board after dismantling the damaged one, L&T or Equivalent make.
2.10.4:Supplying and fixing 5 amps to 32 amps rating, 240/415 volts, "C" curve, miniature circuit breaker suitable for inductive load of following poles in the existing MCB DB complete with connections, testing and commissioning etc. as required.Triple pole
OD238394/2023-2024:Supply and Installation of DOL starter for 5 HP 3 phase 400V 50Hz squirrel cage induction motor including giving connections( L&T /Equivalent made)
OD241966/2023-2024:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6319 SKF / FAG or equivalent, suitable for 120-190 HP motor / pump set, as per the direction of Departmental staff at site.
OD241967/2023-2024:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6313 , SKF / FAG or equivalent, suitable for 60 HP motor / pump set as per the direction of Departmental staff at site.
OD242603/2023-2024:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6315 , SKF / FAG or equivalent, suitable for 120-190 HP motor / pump set , as per the direction of Departmental staff at site.
OD241915/2023-2024:Supply and fixing 300A 3 pole Power contactor for 190HP motor starter AC3 rating at415v with Ac coil, Auxiliary contacts 2NO/NC (L&T or equivalent make)
OD238398/2023-2024:Dismantling the damaged power contactor and Supply, fixing and testing of following capacity 3 pole power contactor, AC 3 rating at 415 V, with AC Coil, Auxiliary contacts, 2 NO/2NC, L&T MNX 95 or equivalent suitable for 60 HP motor's fully automatic star delta starter
OD76405/2024-2025:Supply and fixing 12inch pin bush couplingset for 160 HP motor pump set with suitable nuts and bolts
Motor AMC
OD238399/2023-2024:Fully Comprehensive Annual Maintenance of 5 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts, replacing spares with original make as per sample, dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, overhauling of the motor, maintenance of motor thorughout the AMC period whenver necessary (excluding rewinding) repairs of vaccum pipe line, starter, valves electrical accessories etc as required complete in good working condition including painting the motor pumpset, base plate all time during the period of contract and the faults should be rectified with in the time allowed
OD241666/2023-2024:Fully Comprehensive Annual Maintenance of 10 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts, replacing spares with original make as per sample, dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, overhauling of the motor, maintenance of motor through out the AMC period whenever necessary (excluding rewinding) repairs of vacuum pipe line, starter, valves electrical accessories etc as required complete in good working condition including painting the motor pump set, base plate all time during the period of contract and the faults should be rectified with in the time allowed
OD238402/2023-2024: Fully Comprehensive Annual Maintenance of 60 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD238404/2023-2024: Fully Comprehensive Annual Maintenance of 190 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD238408/2023-2024: Fully Comprehensive Annual Maintenance of 160 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, reconditioning the slipring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .( Total 2 motors 12 months each)
OD255856/2023-2024:Fully Comprehensive Annual Maintenance of 120 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt release coil, overload coil, reconditioning and refill oil, reconditioning the slip ring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pump set by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base plate, pump set and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
Motor Lifting Works
OD238410/2023-2024: Lifting the 10 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD255875/2023-2024:Lifting the 5 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform.
OD238412/2023-2024: Lifting the 60 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD238414/2023-2024: Lifting the 190 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD255891/2023-2024: Lifting the 160 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform.
OD271595/2023-2024: Lifting the 120 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform.
Roy M.X (BID ID -1983471)
Bidder Name
Edward P J
Roy M.X
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1102879.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .