| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹80.3 CrAdmitted-Finance ABC HOUSE PLOT NO 432 5TH FLOOR PHULNAKHARA BHUBANESWAR 754001 ODISHA | CUTTACK | ODISHA | 754001 | -6.98% | ₹80.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹101.7 Cr+₹21.4 Cr (26.7%)Admitted-Finance C 2488 SUSHANT LOK PHASE 1 GURGAON 122001 HARYANA | GURUGRAM | HARYANA | 122001 | +17.88% | ₹101.7 Cr+₹21.4 Cr (26.7%) | L2 | Admitted-Finance |
| 3 | L3₹103.3 Cr+₹23.0 Cr (28.7%)Admitted-Finance | +19.69% | ₹103.3 Cr+₹23.0 Cr (28.7%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical 1 513 VIDHYADHAR NAGAR JAIPUR 302039 RAJASTHAN | JAIPUR | RAJASTHAN | 302039 | - | - | - | Rejected-Technical no |
Tender Value
₹86.3 Cr
EMD Value
₹1.7 Cr
Closing Date
7 Apr 2026, 6:00 pmClosed
commissioner
MUNICIPAL CORPORATION KOTA
Construction and Redevelopmet Work of CHAMBAL GARDEN with Five Yeras Operation Maintenance Work.1 nit 65
2026_DLB_541043_1
NNK/CIVIL/2026/1239-1250 nit 65
Open Tender
Civil Works
Percentage
730 days
kota
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,500
commissioner
₹1.7 Cr
Yes
MUNICIPAL CORPORATION KOTA
13 May 2026
25 Feb 2026
9 Apr 2026
25 Feb 2026
7 Apr 2026
25 Feb 2026
11 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1WORK NAME | |||||
| 1.01 | Carriage of Materials by mechanical transport including loading, unloading and stacking :: Beyond 5 Km upto 10 Km. per Km. | 21,576.42 | - | 356.36 | ₹76,88,973.03 |
| 1.02 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to a lead of 50 metres from road boundary including removal and disposal of top organic soil not exceeding 150 mm in thickness as directed by Engineer. In area of light jungle | 1 | - | 61,600 | ₹61,593.84 |
| 1.03 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. Lime Concrete, cement concrete grade M-10 (1:5:10) and below | 88.2 | - | 393.5 | ₹34,706.7 |
| 1.04 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. Cement Concrete Grade M-15 and above and PCC blocks | 100.2 | - | 678 | ₹67,935.6 |
| 1.05 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. Prestressed /Reinforced cement concrete with separating, cleaning, straightening and cutting of bars | 48.63 | - | 1,692 | ₹82,281.96 |
| 1.06 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. Dismantling Stone Masonry, Rubble stone masonry in cement mortar. | 54 | - | 386 | ₹20,844 |
| 1.07 | Dismantling of barbed wire fencing/ wire mesh fencing including posts, foundation concrete, back filling of pit by manual means including disposal of dismantled material with all lifts and up to a lead of 1000 metres, stacking serviceable material and unserviceable material separately as per MoRT&H specification clause 202. | 630 | - | 98.5 | ₹62,055 |
| 1.08 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar | 102.12 | - | 462.5 | ₹47,230.5 |
| 1.09 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. For thickness of tiles above 25 mm and upto 40 mm | 300 | - | 73.9 | ₹22,170 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.99 MB
6501.pdf
Tender Documents • 7.81 MB
BOQ_964519.xls
BOQ • 2.21 MB
1001.pdf
PDF • 0.68 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .