Loading…
Loading…
Tender ID
Tender Value
₹33.6 L
EMD Value
₹34,000
Closing Date
10 Feb 2026, 6:00 pmClosed
Executive Engineer, Panchayat (R & B) Division Rajkot.
Construction of Slab drain on Balapar ToKhatali Road (NPBT) Between Km.2/700 to 2/900 Ta.Jamkandorana Dist.; Rajkot (Package No.RAJ/MMGSY/BUJ/2025-26/P.41)
269986
Nivida no. 35 2025-26
Open
Civil Works - Buildings
Works
Rajkot
7 documents required · 7 mandatory
₹1,500
Yes
Executive Engineer Panchayat R&B Division Rajkot
₹34,000
Yes
27 Jan 2026
27 Jan 2026
27 Jan 2026
10 Feb 2026
27 Jan 2026
Name of work :- Construction of Slab drain on Balapar To Khatali Road (NPBT) Between
Km.2/700 to 2/900 Ta.Jamkandorana Dist.; Rajkot (Package No.RAJ/MMGSY/BUJ/2025-26/P.41)
BILL OF QUANTITIES
Item Description of Item (With brief specification Quantity Unit Rate Amount
No. and reference to book of Specification)
1 Earthwork for embankment including 78.90 One 171.48
breaking clods, dressing with all lead and lift Cum
(Excluding watering and consolidation) (A)
Selected soil should be From borrow area
with all lead and lift and should have CBR
not less than 6.00%.
2 WBM Grading-2 17.70 One 1261.08
Providing, laying, spreading and compacting Cum
stone agg. Of 63mm to 45mm size to water
bound macadam specification including
spreading in uniform thickness, hand
packing, rolling with smooth wheel roller 80-
100 KN in stage to proper grade and camber,
applying and brooming, stone
screening/binding material to fill-up the
intersties of coarse agg., watering and
compacting to the required density grading-2
as per Technical Specification Clasue.405 By
3 Rolling and Watering of earthwork with 78.90 One 23.41
vibratory roller including filling in depression Cum
which occur during the process and as
4 Excavation of foundation in hard murrum 209.00 One 640.44
and boulders and very stiff or sticky clays Cum
and other similar strata including shorting
out and struting and dewatering as necessary
and disposing of the excavated stuff as
5 Excavation in large boulders and soft rock by 80.30 One 750.68
wedging including shoring, strutting and Cum
dewatering as necessary and disposing of the
excavated stuff as directed,
6 Excavation in hard rock by dry-wet blasting 33.50 One 1755.07
and chiseling including dewatering Cum
preparing foundation base by proper
benching and stepping and disposing of the
excavated stuff as directed (B) Blasting
7 Providing and fixing Mild steel dowel bar of 30.00 One 450.06
minimum 32mm dia. For anchoring by Rmt.
drilling holes in foundation strata including
necessary bending, hooking of dowel bars
and grouting the holes complete as per
detailed drawing and as directed.
8 Providing and casting in situ ordinary cement 42.40 One 3935.98
concrete M-150 mix and providing necessary Cum
pin headers including shuttering, scafilding,
laying vibrating, curing and finishing
complete Without V-Grooves For all Hieght.
9 Providing and filling in foundation with 39.80 One 3359.92
ordinary cement concrete M-100 mix and Cum
providing necessary vertical pin headers incl.
Formwork, vibrating, ramming and curing
Item Description of Item (With brief specification Quantity Unit Rate Amount
No. and reference to book of Specification)
10 Providing and casting in situ Controlled 242.30 One 5173.92
cement concrete M-200 for R.C.C. work in Cum
Piers, abutment, returns and riding returs as
per drawing including centering, shuttering,
scafolding where neccesary laying, vibrating
curing and finishing complete (A) For all
11 Providing and casting in situ Contolled 17.30 One 5253.75
Cement concrete M 20 mix for R.C.C. works Cum
in pier cap, abutment cap, and dirt wall
including controlled cement concrete M
bed block or pedestals for required size below
bearings as per detailed drawings, centering,
shuttering, scaffolding wherever necessary
laying, vibrating, curing and finishing
12 Providing and casting in situ Controlled 47.60 One 5242.73
cement concrete M 25 for R.C.C. Solid slab Cum
including centering, scaffolding, curing and
finishing complete.
13 Providing and casting in situ Contolled 28.20 One 5247.13
cement concrete- M-200 for average Cum
75/150mm thick wearing coat laid as directed
incuding. tamping, vibrating, finishing,
curring and filling in joints with bitumen
14 Providing and casting in situ Contolled 13.10 One 5105.29
cement concrete- M-200 mix for Approach Cum
slab including formwork, curing and
finishing complete.
15 Providing and casting in situ Controlled 3.10 One 4820.44
cement concrete- M-20 mix for kerbs/Kerb Cum
blocks including formwork,curing and
finishing complete.
16 Providing and laying weep hole in Abutment 31.00 One 90.82
and returns by using A.C pipe of 100mm. No
Incl. fixing in proper grade and jointing the
complete as per detailed specification.
17 Providing and laying filter media 600mm. 46.00 One 1298.37
thick directed at the back of abutments, Sqm
returns and wing walls as per detailed
specifications.
18 Providing and fixing in position Mild steel 12.00 One 341.28
dowel bars in pier cap or abutment caps for No
anchorage in fixed end as per detailed
drawings including cutting bending and
welding complete.
19 Providing and fixing in position Mild steel 12.00 One 399.69
dowel bars in pier cap or abutment caps for No
anchorage in free end as per detailed
drawings including cutting bending and
welding complete.
20 Providing and laying in Position FE - 3.000 One 73858.69
500/500D TMT bar reinforcement including MT
cutting, bending, hooking and tying complete
as per detailed drawings for the following (A)
Piers (B) Abutments (C) Returns (D) Walls
21 Providing and Fixing in position FE- 6.900 One 73243.01
500/500D TMT bar reinforcement including MT
cutting, bending, hooking, and tying
complete as per detailed drawaing (A)RCC
kerb (B) RCC Footpath (B) RCC Solid Slab/
App. Slab / Wearing coat.
22 Providing 12mm. Thick Pre-moulded asphalt 11.90 One 703.52
filler joints as per drawings Sqm
Item Description of Item (With brief specification Quantity Unit Rate Amount
No. and reference to book of Specification)
23 Providing G.I. 100mm. Diameter water spouts 8.00 One 536.02
including necessary iron gratings as per No
Item Description of Item (With brief specification Quantity Unit Rate Amount
No. and reference to book of Specification)
24 Providing flood gauge marks on sub structure 3.30 One 174.98
as per design including painting complete Rmt.
25 Numbering the CD work with approved 2.00 One 58.80
paint including all materials for painting etc. No
26 Dismantling the existing structure including 31.50 One 428.71
removing and stacking the dismantled Cum
materials as and where directed.
Stone/Rubble masonary.
27 Dismantling the existing structure including 11.00 One 974.66
removing and stacking the dismantled Cum
materials as and where directed. RCC Work.
28 Dismantling G.I. Pipes G.S.W. Pipes and A.C 15.00 One 80.32
Rain water pipes with fitting and clamps Rmt.
including stacking the materials with all lead
and lift (for any of pipe)
29 Providing temporary all weather and fair 40.00 One 968.48
weather diversion suitable for traffic during Rmt.
the construction period of the bridge / Slab
drain including providing necessary drains
and all safety measures including red lamps /
signals at night for traffic etc. complete..
30 Providing and erecting a "W" metal crash 14.00 One 3723.46
barrier comprising of 3mm thick currugated Rmt.
sheet metal beam rail, 70cm above
Road/Ground level, fixed on ISMC series
channel vertical post, 150x75x5mm spaced 2m
center to center, 1.8m high, 1.1m below
ground/road level, all steel parts and
fitments to be galavanized by hot dip process,
all fittings to conform to IS:1367 and IS:1364
metal beam rail to be fixed on the vertical
post with a spacer of channel section
150x75x5mm, 330mm long complete as per
Rupees Thirty Three Lakh(s) Fifty Six Thousand Six Hundred Fifty And Paise
Ninety Five Only
I \ We am \ are willing to carry out the work at ……………………… % above \ bellow percent
( Should be written in figures and words ) of the estimated rate mentioned above. Amount of My \
Our tender works put as under.
* Estimated Amount * Estimated Amount
Put to tender Rs…………………… Put to tender Rs……………………
Deduct……..……..% Add……..……..%
In words………………….……………… In words………………….………………
1.The Contractor shall exhibit a board with detailed specification and details of work as directed
by the Engineer-In-Charge for which no extra payment shall be made.
2.The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3.GST and Income tax TDS will be deducted at a source while making payments of bills
4.In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.
G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item at the rate
of input rate mentioned in all the tender.
NOTE: Amount Rs.18947/- Of Dismentalled materials shall be recovered from 1st R.A. bill of Contractor at once.
Signature of Contractor.
Deputy Executive Engineer Executive Engineer
Panchayat R&B Sub Division Panchayat R&B Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Balapar-MM-N-CtoB-Kandorna.pdf
Nivida no. 35 2025-26.pdf
9.Envirement MMGSY.pdf
8.GR SBD.pdf
Schedule B .pdf
Speci Balapar-MM-N-CtoB-Kandorna.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .