Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
17 Jul 2026, 6:00 pmClosed
Dy.Minicipal Commissioner - West Zone
CCRS Regarding complaints & footpath repair noticed during the morning round, work done by the light department includes repairing paver blocks and installing new paver blocks, doing CC work and building new footpaths, painting the footpaths and central verges.(ARC)(SHEDULE OF MEINTANANCE TYPE WORK)
320692
1/26-27 (T.N.27)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹900
Municipal Commissioner, Ahmedabad
₹20,000
4 Jul 2026
4 Jul 2026
4 Jul 2026
17 Jul 2026
4 Jul 2026
2. Tender Estimated Cost Rs.20,00,000/-
1% of the Tender Cost in the form (Rs.20,000/-)
3. Earnest Money
(D.D./Pay Order / Local Micr Check/B.G.)
4 Tender Fee Rs Demand Draft of Rs.900.00
6. Time-Limit 12 months
7. Validity Period 120 Days
(i) Last Date of Submission of the
a) In Sealed cover in duplicate copies by Registered Post A.D,
(ii) Mode of Sending or by Courier.or hand delivery
b) Tender sent by ordinary post will be rejected out right.
(iii) Description essential to be
a) Name of work, Tender Notice No. & Tender No.
made on sealed cover b) Date of receiving tender by Corporations.
(iv) Mode of quoting rates in
The Price bid shall be submitted online only.
Schedule of Quantities and Rates It shall not be submitted Physically.
9. Date of Opening AS PER NIT
Submission of EMD. Tender fee and other Documents during office
Place of Submission & Opening of
10. hours: AS PER NIT West Zone, 2nd Floor, A.M. Office, Dr.
Tender Ramanbhai Patel Bhavan, Usmanpura.Ahmedabad Municipal
Corporation, W.Z. Office, Ahmedabad-380013.
(1) Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)
Rs.2500 per day (for tenders amounting above 10 Lakhs and
11. Penalty Due to Delay of work
upto 30 Lakhs), (3) Rs.5000 per day (for all tenders amounting
above 30 Lakhs) but not more then 10% of bill
12. Defect Liability As per ‘B-1 Form Close
Whenever a work is allotted by Engineering staff, whether minor or
major of part thereof of any amount, the contractor shall be bound
to start the works within 48 hours of intimation of work.
Communication done telephonically via SMS, Via Whatsapp and
through letter / E-mail shall be considered legal and binding for the
same. Failure of comply to start the works in 48 hours of intimation
Time permitted to start parts of as above by contractor the contractor shall be levied penalty of (1)
work Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)
Rs.2500 per day (for tenders amounting above 10 Lakhs and upto
30 Lakhs), (3) Rs.5000 per day (for all tenders amounting above
30 Lakhs). Three times failures by contractor shall make
contractor responsible to be black listed unless and otherwise
justified properly in writing / binding within 15 days of last notice of
ybœtJtœ Bgwrlrmvj ftuvtuohuNlbtk Ítulj ytuVem/v.J.yu./«tusufx
rJCtd îtht htuz/rcÕzekd/jtRx/c{es Ft<tytu îtht cnth vtzJtbtk
ytJujt xuLzh sulw mcbeNl <t.01.07.2017 vAe fhJtlw &tg
GST Au.<uJt <btb xuLzhtubtk <&t nJu vAe cnth vtzJtbtk ytJlth
14. ltKt Ft<w vhevºt lkch -31,<t.07.07.2017 Wvhtuf< rJCtd/Ft<tltk <btb xuLzhtubtk (bxehegÕm+juch mÃjtg
bwsc mt&u) GST lt ltuxeVefuNl bwsc GST sgt jtdw vz<tu ntug
ðgt.mœhnw ftblt Bidder yu GST ltuxeVefuNl bwscle
yuÃjefucejexe ægtlbtk htFelu huxlw cezekd fhJtlw hnuNu.
mœh ftb rNzgwj ytuV buRLxulLm «fthlwk Au subtk ytJuj ytuljtRl me.me.yt.yum Vhegtœlt SLA (
Service Level Agreement) rvhegzbtk rlftj VhSgt< fhJtltu &tg Au.stu ytJuj ytuljtRl
me.me.yt.yum Vhegtœltu <ult SLA ( Service Level Agreement) rvhegzbtk rlftj fhJtbtk lne
ytJu <tu leau bwscle vulÕxe fhJtbtk ytJNu.
Sr no Deparmntent Category Problem SLA Period Penalty per
1. Engineering Footpath Road- 168 Hours
Contractor's Sign Addl.C.E.(west zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT (WEST ZONE)
NAME OF WORK- CCRS Regarding complaints & footpath repair noticed during the morning round, work
done by the light department includes repairing paver blocks and installing new paver
blocks, doing CC work and building new footpaths, painting the footpaths and central
verges.(ARC)(SHEDULE OF MEINTANANCE TYPE WORK)
Qty Item Unit Per Rate Amount Rs:-
1 Dismantling the following including
loading, unloading and disposal of
unserviceable material for all lead or as
directed by Engineer-In-Charge and
stacking the serviceable material and
backfilling the resulting trenches and pits
b 100 Dismantling tiled or stone floors laid in Smt 27.44
mortar including stacking of serviceable
material and disposal of uservicalble
material with all lead and lifts.
c 100 Demolition & disposal of unservisable Cmt 348.10
material with all lead and lift for
unreinforeced concrete.
d 50 Demolition of brick work & stone Cmt 314.50
masonry including stacking of serviceable
materials and disposal of unserviceable
materials with all lead and lift (1) In
e 50 Demolition including stacking of Cmt 604.74
serviceable materials and disposal of
unserviceable materials with all lead and
lift. (I) R.C.C work.
2 Extra Rate Over Item of Excavation of
Earth for excavation of asphalt
pavement / RCC of thickness up to
meter including demolishing the asphalt
carpet, metal,s oiling/cutting
Reinforcement etc.comp. with stacking
the material as directed.
a 50 up to 0.20 meter thickness (By Manual) Smt 71.10
b 100 0.20 to 0.30 meter (By any type of Smt 177.76
Breaker Machine or R.C.C.Cutter machine
including cost of operator, fuel, &
transportation etc complete.
Qty Item Unit Per Rate Amount Rs:-
3 150 Box cutting the road surface to proper Cmt 127.13
slope and camber for making a base
for road work including removing the
excavated stuff and depositing on the
road side slope as directed upto
4 Conveyance Charge of earth, lime,
murrum, building rubbish, manure,
garbage, sludge, excavated rock, fly ash,
aggregates of any kind executed outside
the road site. Rate also includes
spreading & levelling etc complete.
Internal conveyance above 50 mt done
within the work site is not payable.
c 180 c) Lead From 2 Km to 3 Km. Cmt 38.37
d 25 d) Lead From 3 Km to 4 Km. Cmt 45.52
5 10 Providing and laying Cement Concrete Cmt 1901.59
1:5:10 (1-Cement : 5-Fine Sand : 10-
Graded Brick Bat Aggregates 40mm
Nominal Size) and curing complete.
6 Providing, laying, spreading and
compacting graded stone aggregate to
Wet Mix Macadam specification
including premixing the Material with
water at OMC in mechanical mix plant
carriage of mixed Material by tipper to
site, laying in uniform layers in sub- base
/ base course on well prepared surface
and compacting with vibratory roller to
achieve the desired density as per Codal
100 Production & Supply of WMM Cmt 1708.13
100 Laying of WMM Cmt 31.25
Qty Item Unit Per Rate Amount Rs:-
7 1450 Providing and Laying of Rubber Moulded Smt 501.60
Paver Block Grey/Coloured 60 mm thick,
M-35 Grade of any size ; shape (Usually
Uni-Paver Blocks) using black trap good
quality aggragate of 20 mm nominal size
for footpath, parking areas, service
lanes and other areas as mentioned
in the drawing/instruction of engineer in
charge. Cost includes formworks using
rubber mould, Rate providing and laying
paver blocks as per required grading and
specification. The paver block shall be
mechanically compacted. The work of
paving blocks shall be executed in line
and level by skill mason of flooring work
only. It should be laid in such a way that
the no cutting of the paver block to be
necessary. if cutting of paver block
necessary then it should be cut by
machine only and carting. The finished
surface of the paver block shall have
resonably good, plain finished. Paver
blocks shall be compacted and shall be
relaid if necessary. Gravel or such type of
materials shall not be allowed for
production. Laying on 5cms thick sand
8 500 Providing and laying of interlocking grey Smt 572.00
Paver Blocks of high density 80mm thick
made from M-40 grade concrete using
mm to 20 mm machine crushed well
graded stone aggregate, sand of
approved quality, OPC 53 grade cement
with contractor's own concrete mix
design as approved by AMC, for parking,
road. Cost Includes formwork, using
rubber/FRP mould, laying paver block as
per required grading and specification
laid paver block shall be mechanically
compacted. The work of the paving
blocks shall be executed in line and level
by skilled mason of flooring work only. It
should be laid in such a way that the no
cutting of the paver block to be
necessary. Cutting of paver block by
machine cut only and carting to be done.
The Finished surface of the Paver Block
Qty Item Unit Per Rate Amount Rs:-
shall have reasonably good plain finish.
Paver blocks shall be compacted and
shall be re-laid if necessary. Gravel or
such type of materials shall not be
allowed for production. Laying on 5 Cms
thick sand bedding.
9 400 Supplying and fixing of 300 mm-L x 150 Rmt 350.89
mm-B x 380 mm-H Kerb Block for
Footpath in M-20 grade using 20 mm
nominal size black trap aggregate of
Sevaliya/Timba or equivalent quality for
pre-cast blocks, reasonably exposed
finish/ formwork , mould with well
equipped with vibratory system for kerb
stones of approved design including
curing, etc. complete, including the cost
of formwork etc. complete. The rate
shall also include necessary cutting of
asphalt, fixing the Kerb stones in line and
level on 5 cm thick sand bedding with
necessary equipments and materials. The
rate shall also include the flush pointing
in CM (1:3) for all joints of the
kerbstones. Filling of zari alone the sides
of the kerb stone fixed with Bituminous
concrete mixed in proper position as
directed by Engineer in change to form a
portable mixture. In any case Gravel or
such type of materials shall not be
allowed for production. a) Laying o(AMC
approved Rate )n 5 cm thick Sand
10 176 Supplying and fixing of 380 mm H x 300 Rmt 431.96
mm L x 200 mm B Kerb Block for Central
Verge in M-20 grade using 20 mm
nominal size black trap aggregate of
Sevaliya/Timba or equivalent quality for
pre-cast blocks, reasonably exposed
finish/ formwork, mould with well
equipped with vibratory system for kerb
stones of approved design including
curing, etc. complete, including the cost
of formwork etc. complete. The rate
shall also include necessary cutting of
asphalt, fixing the Kerb stones in line and
level on 5 cm thick sand bedding with
necessary equipments and materials. The
Qty Item Unit Per Rate Amount Rs:-
rate shall also include the flush pointing
in CM (1:3) for all joints of the
kerbstones. Filling of zari alone the sides
of the kerb stone fixed with Bituminous
concrete mixed in proper position as
directed by Engineer in change to form a
portable mixture. In any case Gravel or
such type of materials shall not be
allowed for productiona) Laying on 5 cm
thick Sand Bedding
11 100 Providing , Supplying and fixing precast Rmt 195.54
C.C. blocks (M-20) edge kerb having size
of 75 x 300 x 300 mm depth and as per
design conveying it to the site, jointing in
to C:M 1:3 and racking out the joints incl.
necessary excavation of asphalt, soil etc.
12 2 Constructing Bombay Pattern Type Nos. 3125.00
Catch Pit of size 0.60 x 0.60 depth up
to 1 mt including excavation, B.B.C.C.
(1:5:10), 23 cms thick brick maso. wall
in the prop. of CM (1:6) with 40 mm
thick IPS flooring in the prop M15 at
bottom and 15 mm thick cement
plaster inside the catch pit in the
proportion of CM (1:3) with out jali
etc. comp. as directed.
13 2 CatchPit Jali Fixing P/F FRC catch pit Nos. 1522.00
jali with frame 600mm x 600mm clear
opening etc. comp. As directed by
engineer in charge.
14 Providing and supplying and jointing ISI
mark only standard length Stoneware
Pipes of following class and diameter
including excavation for laying of pipes,
insurance, transportation, freight
charges, octroi, inspection charges,
loading, unloading, conveyance to
departmental stores, stacking etc. compl.
(IS651/1989 or its latest revision)
including labour work for lowering,
laying, joiting with cement mortar (1:1)
proportion, proper postion, grade and
alignment and all level as directed by
engineer in charge including store to site
Qty Item Unit Per Rate Amount Rs:-
of work jointing material etc complete
27 100 mm dia Rmt 165.52
30 150 mm dia Rmt 242.98
20 230 mm dia Rmt 400.54
15 Repairing damaged M.H. and rasing M.H.
up to road level incl. removing damaged
brick work and repairing by brick
masonry in C.M. 1:5 and plaster in C.M.
1:3 and fixing C.I. steps and existing MH
sheet cover, removing the debris from
MH and carting the same as directed.
5 (A) up to 0.15 mt. (@ Two Coarse) Nos. 728.82
5 (B) up to 0.35mt. (@ Four Coarse) Nos. 1155.44
16 2 Carting and Fixing M.H., Chamber or Nos. 746.59
Catchpite Seat and Cover in line and
level to match exisisting road level in C.C.
1:2:4 and finishing smooth, watering
and protecting for 7 days etc. complete
as directed. M.H. seat cover will be
supplied byA.M.C.(from any store)
17 500 Labour work for fixing Interlocking Smt 68.64
Blocks / any kind of pavement on up to
50 mm th sand bedding, levelling,
watering and fixing in line & level as well
cleaning the site etc.comp. as directed.
18 100 Labour work of fixing Kurb any design of Rmt 136.40
central verge, (both side) footpath kurb,
items includes necessary excavation,
asphalt cutting of any thickness, erecting
in line and position and pointing with
cement mortar (1:3), watering, etc
complete, filling with zari along the side
of the kurb, the kurb stone fix prepared
with bitumnious top surface, as directed
by engineer in charge.
19 2500 Painting Two Coats on divider and Smt 71.86
footpath curb surface / New Concrete
Surface ( Painting two coats after filling
the surface with synthetic enamel paint
in all shades on new plastered concrete
Qty Item Unit Per Rate Amount Rs:-
20 10 Providing and Casting in situ ordinary Cmt 3672.30
cement concrete M200 for R.C.C. Raft
and cutt off walls including necessary
shuttering laying, vibrating, ramming and
curing complete.(B) Walls, fom top of
foundation level upto floor two level
21 Providing and laying cement concrete
Cement : 4- coarse sand : 8- hand broken
20.00 stone Cmt
aggregates 40 mm nominal size) and
complete excluding cost of formwork in
22 Providing and laying in position Ready
Mixed M200 grade concrete for reinforced
cement conctere
work , using cement content as per
Design Mix manufactured in fully
batching plant and transported to site of
transit mixer for a lead up to 10 kms
continuous agitated mixer, manufactured
mix design of specified grade for
cement concrete work including pumping
R.M.C. from transit mixer to site of laying,
excluding the cost of centering shuttering
and reinforcement including cost of
recommended proportions as per IS:
accelerate/ retard setting of concrete,
workability without impairing strength and
durability as per direction of the Engineer
charge. Without Fly Ash
23 Providing formwork of ordinary timber
planking soas to give a rough finish
including centering
shuttering strutting and propping etc.
50.00 Height of Smt
propping and centering below supporting
ceiling not exceeding 4 M. and removal of
Qty Item Unit Per Rate Amount Rs:-
same for in situ reinforced concrete and
concrete work in. (A) Foundations
of Columns etc. and Mass concrete.
24 P/A Trimix with dewatering machine and
floater machine on constructed RCC work
incl. cost of machine and labour etc
compas directed.
Contractor's Sign Addl.C.E.(west zone).
AHMEDABAD MUNI CIPAL CORPO RATI ON ENGI NEER DEP ARTMENT
NAVA VADAJ WARD
TECHNICAL SPECIFICATION
Name of Work :- CCRS Regarding complaints & footpath repair noticed during the morning
round, work done by the light department includes repairing paver
blocks and installing new paver blocks, doing CC work and building new
footpaths, painting the footpaths and central verges.(ARC)(SHEDULE OF
MEINTANANCE TYPE WORK)
Item No: 1 Dismantling the following including loading, unloading and disposal of unserviceable
material for all lead or as directed by Engineer-In-Charge and stacking the serviceable material and
backfilling the resulting trenches and pits complete..
b. Dismantling tiled or stone floors laid in mortar including stacking of serviceable material and
disposal of uservicalble material with all lead and lifts.
The rate shall be for a unit of Smt. Basis.
c. Demolition & disposal of unservisable material with all lead and lift for unreinforeced concrete. (AMC sor)
The rate shall be for a unit of cmt. Basis.
d. Demolition of brick work & stone masonry including stacking of serviceable materials and disposal of
unserviceable materials with all lead and lift (1) In cement mortar. R&B SOR 2021-22 ITEM CODE 20003B
Item no.as per NBO 20.11)
The rate shall be for a unit of cmt. Basis.
e. Demolition including stacking of serviceable materials and disposal of unserviceable materials with all lead
and lift. (I) R.C.C work. (R&B SOR 2021-22 ITEM CODE 20002 Item no.as per NBO 20.3)
The rate shall be for a unit of cmt. Basis.
Item No.2 : Extra Rate Over Item of Excavation of Earth for excavation of asphalt pavement / RCC
of thickness up to 0.20 meter including demolishing the asphalt carpet, metal,s oiling/cutting
Reinforcement etc.comp. with stacking the material as directed. ( a. up to 0.20 meter thickness (By
The rate shall be for a unit of Smt. Basis.
b. 0.20 to 0.30 meter (By any type of Breaker Machine or R.C.C.Cutter machine including cost of
operator, fuel, & transportation etc complete.
The rate shall be for a unit of Smt. Basis.
Item No.3 : Box cutting the road surface to proper slope and camber for making a base
for road work including removing the excavated stuff and depositing on the
road side slope as directed upto 200 Mt.lead.
Any soil which generally yields to the application of pickaxes and shovels, spades, rakes or any
such ordinary excavating implement or organic soil, gravel, silt, sand turf loam, clay, peat etc. falls under
this category. For materials and workmanship for earthwork and excavation, relevant specification IS:
3764 & IS 1200 (Part I) shall be followed.
To protect persons from injury and to avoid damage to property, adequate barricades, construction
signs, red lanterns and guards as required shall be placed and maintained during the progress of the
construction work and until it is safe for the traffic to use the roadways. The relevant Indian standards and
the rules and regulations of local authorities in regards to safety provisions shall be observed.
The depth of the excavation shall be as required. The site shall be cleared and all obstructions,
loose stones, materials and rubbish of all kind, bush; wood and all type trees shall be removed, as directed.
The materials so obtained shall be the property of AMC and shall be conveyed and stacked as directed,
within 50-m. lead. The roots of the trees coming in the sides of the trenches shall be cut and coated with
All types of trees, woods etc. which requires prior permission of Govt./ Forest Authority /
Municipal Commissioner, before cutting shall be cut after obtaining such permission from them. The rate
of site clearance is deemed to be included in the rate of earthwork.
The excavation shall be carried out in true line and level and having width and depth, as shown in
the drawings or as directed. The Contractor shall do the necessary shoring and strutting or shall provide
necessary slopes to a safe angle or steps, as required or directed, at his own cost. No extra payment shall
be made for such precautionary measures, taken. The bottom of the excavated area shall be leveled both
longitudinally and transversely, as directed, by removing excess soil and watering, as required. No earth
filling will be allowed for bringing it to level, if by mistake or any other reason, excavation is made deeper
or wider than shown on the drawings or as directed. The extra depth or width shall be made up with sand
filling, as specified for the bottom level of the subsequent finishing at the cost of the Contractor or as
directed by Engineer-In-Charge.
The Contractor shall at his own expense and without extra charge make provision of supporting all
utility services, lighting the excavated areas, separating and stacking serviceable materials neatly, shoring,
timbering, strutting, bailing out water either sub-soil or rainwater, including pumping at any stage of the
work. Excavated areas shall be kept free of water while masonry or concrete or relevant base works are in
progress and till the Engineer-in-charge considers it necessary.
Disposal of the Excavated Stuff:
The excavated stuff of the selected type shall be used in backfilling the excavated areas wherever
required in layers, including ramming and watering, ensuring proper compaction etc. complete up to lead
of 50mt. The Contractor shall remove the balance of the excavated quantity from the site of work, to a
place, as directed by engineer in charge. The lead is the shortest practical route and not necessarily the
route actually taken. The decision of Engineer-In-charge shall be final in this regard. The measurement of
excavation of excavated area shall be made according to the sections shown on the drawing or as per
sections given by the Engineer-in-charge. The rate shall include for clearing the site, surface dressing,
making layout for road.
ITEM NO:- 4 : Conveyance Charge of earth, lime, murrum, building rubbish, manure, garbage,
sludge, excavated rock, fly ash, aggregates of any kind executed outside the road
site. Rate also includes spreading & levelling etc complete. Internal conveyance
above 50 mt done within the work site is not payable.
All the surplus earth etc. shall be carried away immediately from the site of work to a place within 5km. distance or as
directed and ordered by the Engineer, so as not to cause any inconvenience to the public traffic finding which in view
of public safety and traffic convenience. The corporation shall carry out the work by any other agency at the
contractor’s risk and cost. If the instructions are not completed within 7 days from the date of order to cart the surplus
materials and clear the site, the said work shall be carried out by the Municipal Corporation at the risk and cost of the
contractor and no claim or dispute shall be entertained in this respect.
If the filling in trenches after settlement of the earth filling in trenches is to be done and the same shall be carried out
by the contractor without asking any extra rate. The contractor shall have to cart the surplus earth after the trenches we
will watered and refilled with the sand. The rate of carting including carting of brickbats, metal, rubble vegetable and
garbage, if necessary to clear the road surface.
The rate shall be for a unit of one cubic meter.
as per requirement in site in cmt
Item No: 5 Providing and laying Cement Concrete 1:5:10 (1-Cement : 5-Fine Sand : 10-
Graded Brick Bat Aggregates 40mm Nominal Size) and curing complete.
1.1 Water shall conform to M-1, Cement shall conform to M-3. Sand shall conform to M-6. Stone
aggregate 40 mm. nominal size shall conform to M-12.
2.0 Workmanship :
2.1 The relevant specification of item No 5.3.2.(A) shall be followed for the work except that the work is
to be carried out in cement concrete 1:5:10.
3.0 Mode of measurement and payment :
3.1 The concrete shall be measured for its length, breadth and depth. limiting dimensions to those
specified on plans or as directed.
The rate shall be for a unit of one cubic meter.
Item No: 6 Providing, laying, spreading and compacting graded stone aggregate to Wet
Mix Macadam specification including premixing the Material with water at
OMC in mechanical mix plant carriage of mixed Material by tipper to site,
laying in uniform layers in sub- base / base course on well prepared surface
and compacting with vibratory roller to achieve the desired density as per
Codal Provision.
Production & Supply of WMM
as per requirement in site in cmt
Item No: 7 Providing and Laying of Rubber Moulded Paver Block Grey/Coloured 60 mm thick, M-35
Grade of any size ; shape (Usually Uni-Paver Blocks) using black trap good quality aggragate of 20 mm
nominal size for footpath, parking areas, service lanes and other areas as mentioned in the
drawing/instruction of engineer in charge. Cost includes formworks using rubber mould, Rate providing
and laying paver blocks as per required grading and specification. The paver block shall be mechanically
compacted. The work of paving blocks shall be executed in line and level by skill mason of flooring
work only. It should be laid in such a way that the no cutting of the paver block to be necessary. if cutting
of paver block necessary then it should be cut by machine only and carting. The finished surface of the
paver block shall have resonably good, plain finished. Paver blocks shall be compacted and shall be relaid
if necessary. Gravel or such type of materials shall not be allowed for production. Laying on 5cms thick
. Item No :- 08 Providing and laying of interlocking grey Paver Blocks of high density 80mm thick made
from M-40 grade concrete using 6 mm to 20 mm machine crushed well graded stone aggregate, sand of
approved quality, OPC 53 grade cement with contractor's own concrete mix design as approved by AMC,
for parking, road. Cost Includes formwork, using rubber/FRP mould, laying paver block as per required
grading and specification laid paver block shall be mechanically compacted. The work of the paving blocks
shall be executed in line and level by skilled mason of flooring work only. It should be laid in such a way
that the no cutting of the paver block to be necessary. Cutting of paver block by machine cut only and
carting to be done. The Finished surface of the Paver Block shall have reasonably good plain finish. Paver
blocks shall be compacted and shall be re-laid if necessary. Gravel or such type of materials shall not be
allowed for production. Laying on 5 Cms thick sand bedding. (AMC approved Rate )
as per requirement in site in smt
TECHNICAL SPECIFICATIONS :
I) Paver Block Manufacturing Facilities :
The Paver Block shall be made in factory with following minimum facilities :
1.1 Concrete Block making Machines :
The machine should be capable of producing high quality Paver Blocks by obtaining high level of
compaction by application of hydraulic compaction and also by high intensity vibration to the moulds.
The machine should have automatic control panel for uniformity in strength.
1.2 Concrete Batching & Mixing Plant : (Not essential)
The concrete Mix Design should be followed for each batch of materials. The concrete ingredient
should be mixed in concrete Batching & Mixing plant with minimum capacity of 30 cum/hour. The plant
should equipped with automatic control panel for maintaining water cement ratio from batch to batch to
obtain concrete of uniform quality and strength. The plant should be equipped with adequate mechanism
for mechanized loading of raw materials into mixer and conveyor belt for transportation of concrete from
mixer to concrete block making machine to maintain quality of wet cement.
1.3. Curing:- The factory should have well designed curing area to ensure adequate curing of paver
Laboratory (Desirable but not essential) :
The factory should have the following:
Compression testing machine of adequate capacity.
Other tools and equipment for testing raw materials and paver blocks.
(1).Systematic record of test results of various paver blocks manufactured in the factory.
(2).Concrete Mix Design for various grade of concrete used for making of paver blocks.
II) SPECIFICATIONS FOR COLOURED PAVER BLOCKS :
Coloured concrete paver blocks shall be manufactured as per attached specifications using approved
colour Pigment of “BAYER” Make “BAYFERROX IRONOXIDE PIGMENTS” with minimum colour
pigment of 3% by weight of cement. The colour shade shall be “RED” as selected by HPCL before
commencement of the work. White cement shall be used for colored pavers to obtain the desired colour
shade. The job also includes providing 50 mm thick sand bedding to match the shade of the paver block.
The colour of the paver block shall be guaranteed against fading of colour for period of 12 months from
the date of laying of the same at site.
All other technical specifications & Procedure for testing, laying & sampling of coloured pavers will be as
per attachment.
III) PAVERS BLOCK CHARACTERISTICS :
The concrete pavers should have perpendicularities after release from the mould and the same should be
retained until the laying.
The surface should be reasonably smoothe and of anti skid and anti glare type.
The paver should have uniform chamfers to facilitate easy drainage surface run off.
The pavers should have uniform interlocking space of 2mm to 3mm to ensure compacted sand filling after
vibration on the paver Surface.
The concrete mix design should be followed for each batch of materials separately and automatic batching
plant is to be used to achieve uniformity in strength and quality.
The pavers shall be manufactured in single layer only.
Skilled labour should be employed for laying blocks to ensure line and level of laying, desired shape of
the surface and adequate compaction of the sand in the joints.
The pavers shall be of cement gray colour without any pigment & for coloured pavers refer “specifications
for coloured pavers.”
The pavers are to be skirted all round with kerbing using solid concrete blocks of size 150mm X 250mm
X 380mm. The kerbing should be embedded for 100mm depth. The concrete used for kerbing shall be
cured properly for 7 days minimum.
IV) Paver Block Dimensions :
Thickness 60mm or 80mm
Shape Uniregular (Uniform Shape with no Hollow
Chamfer 4mm to 6mm along top edges
Colour Natural cement grey colour without use of
For coloured pavers refer “specifications for
coloured pavers”
Dimensional Tolerance (+/-) 2mm for length & width,
(+/-) 3mm for Height (Thickness)
V) Testing of Paver Blocks :
SR. Average Values
NO. (Average of Minimum
Five Samples/Site)
1. Compressive Strength Min. 45 N/Sqmm for 80mm
thick OR Min. 30 N/Sqmm for
2. Flexural Strength Minimum 4.5 N/Sqmm
3. Abrasion Resistance Maximum
4. Water Absorption Maximum 5.80%
5. Minimum Cement Contact 380 Kg/Cum (Not Essential)
* Sampling and Testing procedure as per enclosed specifications
SAMPLING AND TESTING PROCEDURES FOR PAVER BLOCKS.
INTERNAL – Average of minimum 3 samples per 5000 Blocks.
Essential – Minimum 2 Blocks per 10000 bocks. Average of minimum 8 blocks per site.
1. Sampling For Testing
Sampling for testing of paver blocks shall be done in accordance with Appendix-A.
Compressive Strength
Testing for compressive strength shall be undertaken in accordance with Appendix-B.
The average compressive strength of the bocks tested shall be 40 N/Sqmm.
Abrasion Resistance
Testing for abrasion shall be in accordance with IS 1237 (Specifications for Cement Concrete Floor Tiles)
Flexural Strength
Testing for flexural shall be n accordance with IS 1237 (Specifications for Cement Concrete Floor Tiles) –
Water Absorption
Testing for water absorption shall be in accordance with IS 2185:1979 : Part I (Specifications for Concrete
Masonry Units) – Appendix E.
Sampling of Paver blocks.
1. Method of sampling :
Before laying paver blocks, each designated section comprising not more than 50000 blocks, shall be
divided into ten approximately equal groups. Three blocks shall be drawn from each group.
Marking and identification :
All samples shall be clearly marked at the time of sampling in such a way that the designated section of
part thereof, and the consignment represented by the sample, are clearly defined.
The sample shall be dispatched to the approved test laboratory taking precaution to avoid
damage to the paving in transit. Protect the paving from damage and contamination until they have been
tested. The testing shall be carried as soon as possible, after the sample has been taken. As soon as
practicable after sampling. The samples shall be stored in water at 20 degree C 5 degree C for 24 hours
prior to testing.
as per requirement in site in smt
Item No :- 09 Supplying and fixing of 300 mm-L x 150 mm-B x 380 mm-H Kerb block for Footpath in M-
20 grade using 20mm nominal size black trap aggregate of Sevaliya/Timba or equivalent quality for pre-
cast blocks, reasonably exposed finish/ formwork , mould with well equipped with vibratory system for
kerb stones of approved design including curing, etc. complete, including the cost of form work etc.
complete. The rate shall also include necessary cutting of asphalt, fixing the Kerb stones in line and level
on 5 cm thick sand bedding with necessary equipments and materials. The rate shall also include the flush
pointing in CM (1:3) for all joints of the kerbstones. Filling of zari alone the sides of the kerb stone fixed
with Bituminous concrete Bituminous concrete / C.C. mixed in proper position to flush with the road
surface as directed by Engineer in change to form a portable mixture.(a) Laying on 5 cm thick Sand
as per requirement in site in rmt
Item No :- 10 Supplying and fixing of 380 mm H x 300 mm L x 200 mm B Kerb Block for Central Verge
in M-20 grade using 20 mm nominal size black trap aggregate of Sevaliya/Timba or equivalent quality for
pre-cast blocks, reasonably exposed finish/ formwork, mould with well equipped with vibratory system for
kerb stones of approved design including curing, etc. complete, including the cost of formwork etc.
complete. The rate shall also include necessary cutting of asphalt, fixing the Kerb stones in line and level
on 5 cm thick sand bedding with necessary equipments and materials. The rate shall also include the flush
pointing in CM (1:3) for all joints of the kerbstones. Filling of zari alone the sides of the kerb stone fixed
with Bituminous concrete mixed in proper position as directed by Engineer in change to form a portable
mixture. In any case Gravel or such type of materials shall not be allowed for productiona) Laying on
cm thick Sand Bedding
as per requirement in site in rmt
Item No :- 11 Providing , Supplying and fixing precast C.C. blocks (M-20) edge kerb having size of 75 x
300 x 300 mm depth and as per design conveying it to the site, jointing in to C:M 1:3 and racking out the
joints incl. necessary excavation of asphalt, soil etc. completed
as per requirement in site in rmt
Item No. 12 Constructing Bombay Pattern Type Catch Pit of size 0.60 x 0.60 depth up to 1 mt
including excavation, B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in the prop. of CM (1:6)
with 40 mm thick IPS flooring in the prop M15 at bottom and 15 mm thick cement plaster inside
the catch pit in the proportion of CM (1:3) with out jali etc. comp. as directed.
as per requirement in site in Nos
Item No. 13 CatchPit Jali Fixing P/F FRC catch pit jali with frame 600mm x 600mm clear opening
etc. comp. As directed by engineer in charge.
as per requirement in site in Nos
Item No :- 14 Providing and supplying and jointing ISI mark only standard length Stoneware Pipes of
following class and diameter including excavation for laying of pipes, insurance,
transportation, freight charges, octroi, inspection charges, loading, unloading, conveyance to
departmental stores, stacking etc. compl. (IS651/1989 or its latest revision) including labour
work for lowering, laying, joiting with cement mortar (1:1) proportion, proper postion, grade
and alignment and all level as directed by engineer in charge including store to site of work
jointing material etc complete
as per requirement in site in rmt
Item No.15: Repairing damaged M.H. and rasing M.H. up to road level incl. removing damaged brick
work and repairing by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and
existing MH sheet cover, removing the debris from MH and carting the same as directed.
(A) up to 0.15 mt. (@ Two Coarse)
(B) up to 0.35mt. (@ Four Coarse)
as per requirement in site in Nos
Item No. 16 Carting and Fixing M.H., Chamber or Catchpite Seat and Cover in line and level to
match exisisting road level in C.C. 1:2:4 and finishing smooth, watering and protecting for 7 days
etc. complete as directed. M.H. seat cover will be supplied byA.M.C.(from any store)
The rate shall be for a unit of Nos Basis
ITEM NO:- 17 :- Labour work for fixing Interlocking Blocks / any kind of pavement on up to 50 mm
th sand bedding, levelling, watering and fixing in line & level as well cleaning the
site etc.comp. as directed.
Mode of measurement shall be on SMT. basis
ITEM NO:- 18 :- Labour work of fixing Kurb any design of central verge, (both side) footpath kurb,
items includes necessary excavation, asphalt cutting of any thickness, erecting in
line and position and pointing with cement mortar (1:3), watering, etc complete,
filling with zari along the side of the kurb, the kurb stone fix prepared with
bitumnious top surface, as directed by engineer in charge. (AMC approved Rate )
Mode of measurement shall be on RMT. basis
ITEM NO:- 19 Painting Two Coats on divider and footpath curb surface / New Concrete Surface (
Painting two coats after filling the surface with synthetic enamel paint in all
shades on new plastered concrete surfaces) . (AMC approved Rate )
Mode of measurement shall be on SMT. basis
ITEM NO:- 20 Providing and Casting in situ ordinary cement concrete M200 for R.C.C. Raft
and cutt off walls including necessary shuttering laying, vibrating, ramming and
curing complete.(B) Walls, fom top of foundation level upto floor two level (upto
10ton). (As Per Auda Approval Rate)
Mode of measurement shall be on CMT. basis
ITEM NO:- 21 Providing and laying cement concrete 1:4:8 (1-Cement : 4- coarse sand : 8- hand
broken stoneaggregates 40 mm nominal size) and curingcomplete excluding cost
Mode of measurement shall be on SMT. basis
ITEM NO:- 22 Providing and laying in position Ready Mixed M200 grade concrete for reinforced
cement concterework , using cement content as per approvedDesign Mix
manufactured in fully automaticbatching plant and transported to site of work
intransit mixer for a lead up to 10 kms havingcontinuous agitated mixer,
manufactured as permix design of specified grade for reinforcedcement concrete
work including pumping ofR.M.C. from transit mixer to site of laying,excluding the
cost of centering shuttering finishingand reinforcement including cost of
admixtures inrecommended proportions as per IS: 9103 toaccelerate/ retard
setting of concrete, improveworkability without impairing strength anddurability
as per direction of the Engineer - in -charge. Without Fly Ash
Mode of measurement shall be on CMT. basis
ITEM NO:- 23 Providing formwork of ordinary timber planking soas to give a rough finish
including centeringshuttering strutting and propping etc. Height ofpropping and
centering below supporting floor toceiling not exceeding 4 M. and removal of
thesame for in situ reinforced concrete and plainconcrete work in. (A)
Foundations Footings Basesof Columns etc. and Mass concrete.
Mode of measurement shall be on SMT. basis
ITEM NO:- 24 P/A Trimix with dewatering machine and floater machine on constructed RCC
work incl. cost of machine and labour etc compas directed..
Mode of measurement shall be on SMT. basis
Contractor’s Signature ADD. C.E
AHMEDABAD MUNICIPAL CORPORATION
EN G I N E E R I N G D E PA RTM E N T
Na m e of W o rk : - CCRS Regarding complaints & footpath repair noticed during the morning
round, work done by the light department includes repairing paver blocks and
installing new paver blocks, doing CC work and building new footpaths, painting
the footpaths and central verges.(ARC)(SHEDULE OF MEINTANANCE TYPE
T he wor k s ha l l be c o mp l e ted wi t h 1 2 M o nt hs a ft e r t he o rd er to sta rt t he wo r ks .
T he de tai l s o f r ei n for ce me n t o f R. C. C. wo r k s ha l l b e a s p er de s ig n a nd i nst r uc t io ns o f C i t y
E n g i neer / Add l . C i t y E ng ine er a nd hi s o r d e r wi l l b e co n si d er ed fi na l .
T he co nt ra cto r s h al l ha v e t o ma i nt a i n a cco u n t o f s tee l, ce me n t a nd o t her ma te r i a l s t hat ma y be br oug ht
b y h i m o n s it e. T h i s a cc ou n t s hal l b e re g u l ar l y ma i nt a i n ed a nd kept op e n fo r i ns pe ct i o n b y M u ni cip al
St a f f. W a te r i ng o f al l t h e i te ms s h a l l b e a s p e r i n s tr u ct io n s . M i xi ng of co ncr e t e s ha l l be do ne b y
co ncr e t e mi xe r mac h i ne . Ar ra n ge me n t s o f b i nd i n g vi b r ato r fo r R. C. C. wo r ks i f r eq uir ed s h al l ha ve to
be made b y t he co nt rac t or.
T he co nt rac to r s ha l l be r e ma i n re sp o n si b l e fo r W o r k me n ’s co mp e ns a t i o n i f a ny whe n s uc h c as e o cc ur s .
T he c o n tra c t or s ha l l ar r a ng e fo r me d a mp ers a n d in ni g h t a nd h e s ha l l b e r esp o n sib le f or a n y d a m age o f
li fe a nd l i mb o r p ro p er t y i f a n y hap p e n, d ur i n g t h e e xe c u t io n o f wor k. I n c a s e o f d is p ut e for u nse e n or
ov er l oo ked it e ms t h e de ci si o n o f t he ci t y E n g i n e er/ Ad d l. C it y E n g i n eer s ha ll b e fi na l. T he co nt r act or
s ha l l ha v e to gi v e s i t e cle a n o f a l l r ub b i s h o n co mp le ti o n o f wor k a nd ha ve ove r t h e bui ld i n g wi t h
fi na l fi n i s hi ng o f t he wo rk a s d ir ec t ed . Al l t h e r ej ect ed ma t er ia l s s h al l b e r e mo ve d fro m si te wi t hi n
ho ur s b y co ntr a ct or at t h is ri s k a nd co st.
Fo r mi xi ng mor ta r ei t he r fo r ma so n r y o r fo r p la st er o r fo r a n y o t her p ur pose c o nt ra cto r s h al l h ave to
pr epa re t hr o u gh o f b i g ger s iz e a nd mi x t he mo r t ar i n t he r eq ui r e d pro p o rti o n. I n o n c a se he s h al l b e
al lo wed to mi x t h e mor t ar e i t her o n fl o o r o r a n y f i ni s hed s ur fa ce s .
T he co ntr ac to r s h al l h a v e to ma k e h i s o wn a rr a n ge me n t fo r wa ter re q u ir ed for t he wo r k a nd s ha ll pa y
th e wa t e r c har ge s a s p e r wa te r me te r .
If a ny e x tr a i te m c ro p s up d ur i n g t he p ro g r e ss o f wo r k t he s a me s ha l l b e car r i ed o ut b y t h e co n tr ac tor
and he s ha l l b e p a i d a t t he ra t e fi xed b y C.E . / Ad d l. Ci t y E n gi n ee r a s per t he r a t e a na l ys i s ba sed o n
cur r e nt mar ke t r a t e s.
If i n t he i n ter e s t o f t h e Co r p o ra tio n i t i s ne c es sar y to c ha n g e e it her a ny s i t e o r t he d e s i gn of t he
pr op ose wo r k t he c o n tra ct or s h al l car r y o u t t he s a me at h i s q u o t ed rat e s wit ho u t c ha r g es a n y e xt ra a nd
th e co n tr ac tor wi l l ha ve to ca r r y o ut t he wo r k s a nd h e wi l l b e p ai d at t he ra t e q uot ed b y hi m a nd no
cl a i m fo r e xtr a fo r s ub se q ue n t c h a n g e s ma y b e e nt e rt ai n ed .
T he c ub i c al c o n te n t s of t he c e me n t b a g s ha ll b e ta ke n a s 1 -2 0 c f t. P e r b ag a nd t he co nt rac to r s s ha l l
ha ve t o p rep ar e t h e me a s ur e s b o x e s acc o rd i n g t o t hi s me a s ure .
T he R .C . C. o r s p ec i f ie d wo r k s ha ll no t b e d o ne o n S u nd a y a nd ho l i da y ex cep t i ng e me r ge nc y o r whe n
te c h nic a l r eq ui re me nt s a re s u c h t hat co n t i n ui t y o f wo r k s ho u l d b e mai nt ai ned a nd t ha t t o wi ll b e wi t h
Re te nti o n mo ne y a t t he rat e o f 2 % s h al l b e d e d uc t ed fro m e ver y r u nni ng bi ll o f t he co ntr ac t o r a nd
whi c h wi l l be p a id a t t he t i me o f fi na l b i ll .
Co nt r ac tor wi l l be ful l y re sp o n s ib le fo r co mp l i a nc e o f t h e va r i o u s pr e v i si o n und er co ntr a c t Ac t. 1 97
and t he R ule s fr a med fo r to u nd er .
T he t e nd er for t h e wo r k s h a l l r e ma i n o p e n fo r a p eri o d (1 2 0 ) d a ys fr o m t he da te o f op e ni n g o f t he
te nd e r s fo r t hi s wo r k a nd t h e t e nd er er s h a l l no t b e a llo wed to wi t hd ra w on mod i f y t he o ffer o n h is o wn
du r i ng t he pe ri o d. I f a n y t e nd ere r wi t hd r a w o r m ak es a n y mo d i f ic a t io n s ( s) or ad d i tio n ( s) i n t he ter ms
and c o nd it i o ns o f hi s te nder no t a cce p t ab le to t he M u n i c i p al C o rp ora ti on, t he M u nic ip a l Co rp ora ti o n
s ha l l wi t ho ut pre j ud ic e t o a n y r i g ht o r r e me d y b e at l i b er t y to for fe it i n f ul l t he sa id e ar nes t mo ne y
As pe r C ir c u lar N o . M C R 2 1 7 6 ( 9 6 ) 2 4 1 8 ( i i ) G HH d a t ed 3 1 -0 3 -7 7 is s ue d b y Go ve r n me n t o f G uj ar a t
co ntr a c to r s a re r eq ues t e d to p ro d uc e t he ir q ua r r y ma t er ia l s fo r co ns tr uct io n wor k t hro ug h le g al
so urc es . i. e . o nl y fo r m t he q ua r r y l ea se ho ld er s, p e r mi t ho ld er o r mi ddl e ma n who sa t i s fi e s t he
co ntr a c to r a s to t he l e ga li t y o f t h e so ur ce o f p ur ch a s e b y h i m o n t he s e m a ter i a ls .
If t h e wo r k i s no t c a r ri e d o u t wi t h i n t h e sp e c i fi ed t i me l i mi t p e n a l t y wi l l be c har ged a ppl ic ab le a s p er
Co nt r ac tor ha s t o ma ke hi s o wn a r ra n ge me n t f o r p ro c ur e me n t o f s t ee l a n d ce me n t.
i) Co ndi ti o n al te nd e r wi l l no t b e a c cep te d .
ii ) Al l t e nd er s a r e to b e s ub mi t ted i n d u p l ica te wi t h o ut wh i c h t he te nde r s ar e l i ab l e to b e r ej ec ted .
ii i ) I n ca se o f t e nd er d o wn l o ad e d fr o m we b s it e, t e n d er fe e & EM D s ho uld be s ub mi t ted i n for m o f
iv ) Co ndi ti o n o f fo r m B 1 S ta n da r d S p ec if ica t i o n o f ma t eri a l & co d e o f p rac ti c e w i ll be
ap p li ca b le . Fo r m B 1 & B 2 ca n b e is a v a i l a b le i n w e bs it e. Co n d it io n of For m B - 1 Fo r De f e ct
Wo r k s b o o k a v a i l a b l e f r o m Gu j a r a t Book Stores (Pvt.) Ltd. Sector-21,Gandhinagar,D E T A I L E D
G E N E R A L T E C HN I C AL S P E C I F I C A TI O N S c a n b e a va i la b le fr o m Ah me dab ad M uni ci pa l
Cor po ra tio n we b s it e “ www. e g o va mc . co m” .
Con t r act o r’ s S ig nat ur e A D D. C. E
ybœtJtœ BGþrlrmvj ftuvotuhuNl
vr©b Ítul - Esluh Ftðþ
1. Ft<t îtht «t&b LOI (juxh ytuV RLxebuNl) RMgw fhJtbtk ytJNu. LOI (juxh ytuV RLxebuNl) bégt
ctœ rœl-10 btk 5 % (vtka xft) juFu auf&e / rzbtLz z[tVTx / vu ytuzoh / luNljtEÍz cukf duhkxe&e zevtuÍex
Che fhthvºt fhJtltu hnuNu. <u ctœ Jfo ytuzoh RMgw fhJtbtkk ytJNu ylu Jfoytuzohle <theF&e mbg
bgtoœt NÁ &guj dKJtbt ytJNu <ub A<tk vK ftb NY fhJtbtk lrn ytJu <tu rlgbtlwmth ftgoJtne
2. Nh<e xuLzh MJefthJtbtk ytJNu lrn.
3. xuLzh Jujezexe 120 r>Jm hnuNu.
4. xuLzh MJefthÔþk, h> fhÔþk, ftulu ytvÔþk ylu fgt CtJ&e ytvÔþk, <u ykdu zu. BGþrl. frb.©e ltu rlKog
5. xuLzh Chuj ftuLx[t¾xh vife ftuEvK ftuLx[t¾xhlu vK yt CtJu ftb ytvJtbtk ytJu <tu ceò btLg ftuLx[t¾xh
Jtk^tu jE NfNu lrn.
6. yufe JF<u yuf fh<tk Jæþ søgtytuyu ftb NY fhJtltu Jfoytuzoh b¤u <tu ftb yuf mt&u s c^u NY fhÔþk
vzNu. yuf ftb ÃþÁ &tg vAe cesw ftb NY fheyu yuÔþk atjNu lrn.
7. atÕþ ftbu ftuE vK mrJom jtEllu LþfNtl l &tg <u he<u ftb fhÔþk vzNu, òu ftuE mrJom jtEllu LþfNtl
&Nu <tu <ule mkÃËKo sJtc>the (òlbtjle) ftuLx[t¾xhle vtu<tle hnuNu. mtEx vh ftb >hBgtl bswh fu
sl<tlt ftuE btKmlt òl btj fu LþfNtl &tg <ule sJtc>the ftuLx[t¾xhle hnuNu. vtujem Vhegt> &tg
<tu <ule sJtc>the vK ftuLx[t¾xhle hnuNu. CuFz ^me l vzu <ule sJtc>the vK vtujem Vhegt>btk
ftuLx[t¾xhle hnuNu. CuFz ^me l vzu <u btxu mjtb<elt vdjtk (suJt fu ytuhzwk ctk^e bsqh Ftztbtk W<thJt,
mtuh´d ylu Mx[x´d fhJt rJduhu) je^t Jdh bsqhlu Ftztbtk W<thNu <tu ftuLx[t¾xh s vtujem Vhegt>btk
sJtc>th hnuNu ylu BGþrl. ftuvtuohuNlltu ftuEvK MxtV ytlt btxu sJtc>th hnuNu lrn.ytxÕþk mbSlu s
8. yt xuLzh su <u Jdolt btLg gt>elt ftuLx[t¾xhtu Che NfNu. dJbuoLxlt btLg ftuLx[t¾xhu y.BGþ.ftuvtuo. btk
btLg ftuLx[t¾xhle gt>ebtk hSMx[uNl ðþhk< fhtJÔþk vzNu.
9. yt Wvhtk< y.BGþ.ftuvtuo.lt slhj ftuLx[t¾x fLzeNl vK btLg htFJtle hnuNu. Vtubo ce-1le Nh<tu
ck^lf<to hnuNu. ftb htuz ylu rcÕz´d Ftðþk - øþsht< htßglt MvuNeVefuNl «btKu fhJtLþk hnuNu <&t
MxtVle Mþalt vK mtEx Wvh atÕþ ftbu ægtlbtk juJtle hnuNu. ce-1 Vtubo <&t MvuNeVefuNl øþsht< çþf
Mxtuh, mu¾xh-21, dtk^eldh Ft<u&e ftuLx[t¾xhu ò<u bu¤Je juJtltu hnuNu. <u Jtkaelu vAe s xuLzh ChÔþk.
10. ftuLx[t¾xhlu vubuLx BGþrl. ftuvtuo. Ltt rl<erlgb Bþsc fhJtbtk ytJNu.
11. ftuEvK ftg>tfeg jexeduNl yb>tJt> Nnuhle ftuxobtk hnuNu.
12. bxehegj fu ceò xuMx´d hevtuxo ftuLx[t¾xhu vtu<tlt Fauo ftuvtuohuNl sKtJu <u søgtyu fhtJJtlt hnuNu. yt
ykdultu mkÃËKo Fao <&t BGþrl. MxtVlu juctuhuxhe Mþ^e <&t buLGþVu¾ah´d søgt Mþ^e jtJJt jE sJtltu Fao
vK ftuLx[tfhu CtudJJtltu hnuNu.
13. juch yu¾x «btKu hSMx[uNl ykdu ybj fhJtltu hnuNu <&t fuxjt juch jtJNtu <u vK sKtJJtLþk hnuNu.
juch yu¾x «btKu ftgoJtne lrn &E ntug <tu <u btxu ftuLx[t¾xh mkÃËKovKu sJtc>th hnuNu.
14. btj su <u Mxtumo Wvh y&Jt mtEx Wvh Mþalt Bþsc W<thJtltu <ubs dtuXJJtltu hnuNu.
15. muÕm xuût, ytu¾x[tug, mhatso, yLg xuût fu yLg ftuEvK fhJuht ChJtle sJtc>the ftuLx[t¾xhle hnuNu.
16. atEÕz juch yuBvjtug fhe NftNu lrn.
17. ftuLx[t¾xh îtht yuze.mexe.Rsluh©e / zu. mexe. Rsluh©ele mwalt bwsclt bxehegjltk muBvj hsw
18. ftuLx[t¾xhu atÕþ ftbu mtEx Wvh zeSxj fubuht&e ftb atÕþ > vnujtk, åttÕþ ftbu <&t ftb ÃËKo >lt
Vtuxtud{tV BGþrl. yturVmbtk ytvJtlt hnuNu.
19. ftuEvK fthKmh xuLzh h> fhJtbtk ytJu <tu ftuLx[t¾xh <u ykdu ftuEvK «fthltu n¬ >tJtu fu J¤<hle
btkdKe fhe NfNu lrn. yt Nh< MJeftgo ntug <ubKu s xuLzh ChÔþk.
20. bxehegÕm suJt fu hu<e, #xtu, mebuLx, vtEv, rJduhu MxtLzzo bxehegÕm MvuNeVefuNl «btKult jtJJtlt
hnuNu. ßgtk ftuE atuFJx l &E ntug ðgtk ytE.yum. ftuz «btKu bxehegÕm jtJJtLþk <&t xuMx´d fhtJJtLþk
21. htßg / fuL÷ mhfth©elt JF<tu JF<lt ftg>t Bþsc su ftuE hfble fvt< fhJtlt nwfb mhfth©eyu fhuj
ntuE <u Bþsc ftuLx[tfxlt cejbtk&e fvt< fhJtbtk ytJNu.
22. juch JuÕVuh Vkz btxu ntjbtk htßg mhfth©eyu fhujt nwfb Bþscle hfb cejbtk&e ftve juJtbtk ytJNu.
23. mœh ftb rNzgwj ytuV buRLxulLm «fthlwk Au subtk ytJuj ytuljtRl me.me.yt.yum Vhegtœlt SLA (
Service Level Agreement) rvhegzbtk rlftj VhSgt< fhJtltu &tg Au.stu ytJuj ytuljtRl
me.me.yt.yum Vhegtœltu <ult SLA ( Service Level Agreement) rvhegzbtk rlftj fhJtbtk
lne ytJu <tu leau bwscle vulÕxe fhJtbtk ytJNu.
Sr Deparmntent Category Problem SLA Penalty per
no Period one Problem
1. Engineering Footpath Road-Footpath 168
Repairing Hours
Wvhtu¾< Nh<tu <&t rlgbtu buk ft¤SÃËJof Jtkae Au ylu blu fçËj bksqh Au.
ftuLx[tfxhle mrn <&t me¬tu yuzeNlj mexe.Rsluh(vrùb Ítul)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 27.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .