Loading…
Loading…
Tender Value
₹94.2 L
EMD Value
₹50,000
Closing Date
13 Aug 2026, 5:00 pm
Executive Engineer
Electrical Division Trivandrum
Shifting of Electrical Utilities in connection with Road widening from Maruthankuzhy To Mannarakkonam and Mannarakkonam To Vattiyoorkavu Junction Via Thoppumukku junction under Electrical Section Vattiyoorkavu.
2026_KSEB_862126_1
05/E-Tender/EE-ED/TVPM/26-27 dtd.21.07.2026
Open Tender
Electrical Works
Percentage
180 days
Vattiyoorkavu
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,950
₹50,000
23 Jul 2026
23 Jul 2026
17 Aug 2026
23 Jul 2026
13 Aug 2026
27 Jul 2026
24 Jul 2026 - 27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 955 - Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at standard distance (1.5m) away from the pole/structure in ordinary soil & backfilling the pit with 15cm alternate layer of charcoal, salt and sand up to 90cm from the bottom. including the cost of 20kg salt, 25kg charcoal, excluding supply of earth pipe. | 40 | No | 4,245.59 | ₹1,69,823.6 |
| 2 | 254 - Giving one three phase WP service connection using CT including conveyance of materials, fixing meter, CT, drawing WP wire etc. as per standards. | 11 | No | 3,770.95 | ₹41,480.45 |
| 3 | 926 - Excavation of cable trench of appropriate size ( normally 1.2m deep and 0.35m /0.5m wide for single/double run) in all classes of soil including breaking clods, watering, ramming and sectioning of soil bank etc. and back filling the soil after cable laying and consolidating the soil in layers of 75cm (excluding laying of cable). | 4,550 | m | 318.86 | ₹14,50,813 |
| 4 | 928 - Laying HT XLPE UG cable of sizes upto and including 3x185 sq mm including conveying cable from Sub Regional Store/stacking place to work site and laying it carefully using cable rollers, taking through stone ware/G.I.pipes at road crossing/culverts/bridges etc. whereever necessary, providing identification tags at 5m intervals, filling the space around the cable with riddled soil and covering the top with bricks, providing cable route markers at 100m intervals, inclusive of cost of all materials (other than cost of GI/HDPE pipe & UG Cable), labour and transport including crane charges excluding excavation and backfilling. | - | m | 404.59 | - |
| 5 | 932 - Doing one cable end termination on HT XLPE UG cables of sizes upto and including 3x185 sqmm using the cable jointing kit supplied departmentally after making fencing, caution board and all other safety measures including charges for cable jointer etc. complete as per the direction of the departmental officers. | - | No | 1,838.95 | - |
| 6 | 930 - Doing straight joint on HT XLPE UG cables of sizes upto and including 3x185 sqmm using the cable jointing kit supplied departmentally as per specification after providing proper traffic signalling and caution board fencing etc. wherever necessary, including charges for cable jointer and other sundries etc. as per the direction of departmental officers at site. | - | No | 3,142.64 | - |
| 7 | 927 - Additional rate for excavation of cable trench of appropriate size (normally 1.2m deep and 0.35m /0.5m wide for single/double run) in exceptionally hard conditions (like in ordinary rock). * (As per the PWD Standard Data book ,ordinary rock is defined as any material which can be quarried or split with crowbars or wedges). | - | m | 147.8 | - |
| 8 | 934 - Mounting and connecting HT XLPE UG cable ends of all sizes upto and including 3x300 sq mm with special type cable clamps, bolts, nuts, terminal protectors etc.including cost of extra materials if needed and giving necessary jumper connections. | - | No | 1,169.86 | - |
| 9 | 726 - Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. | - | Trip | 3,142.26 | - |
| 10 | 204 - Erecting one LT PSC Pole in position including digging & back filling pit in ordinary soil. | - | No | 2,017.73 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
bidv3.pdf
Tender Documents • 0.74 MB
BOQ_1458081.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].