Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-AOC | L1 | Accepted-AOC Not Being L1 | |
| 2 | L2₹9.3 L+₹89,178 (10.6%)Rejected-AOC | L2 | Rejected-AOC Not Being L1 | |
| 3 | L3₹14.0 L+₹5.7 L (67.5%)Rejected-AOC PLOT NO D 2 COAL DEPOT FOSBERY ROAD SEWRI E MUMBAI 400 015 | MUMBAI | MUMBAI | MAHARASHTRA | 400015 | L3 | Rejected-AOC Not Being L1 |
Tender Value
Refer Docs
EMD Value
₹28,600
Closing Date
14 Jul 2021, 6:00 pmClosed
BA Nirmal Kumar EE
Opp Akashwani, Makarpura road PO-ONGC Baroda-390009
As per BOQ
2021_MES_454405_1
8595
Open Tender
Civil Works
Item Rate
330 days
GE Army Baroda
As per tender documents
5 documents required · 5 mandatory
₹500
Yes
GE Army Baroda
₹28,600
Yes
9 Aug 2021
24 Jun 2021
15 Jul 2021
25 Jun 2021
14 Jul 2021
1 Jul 2021
26 Jun 2021 - 30 Jun 2021
Amount
Outsourcing services for running of Electric supply installation at Harni Power house (PUMP HOUSE HARNI AREA) of GE (Army) Baroda, deploying of one Electrician per shift, comprising of all plants/machinery/equipments/devices of any type, any make, any capacity inside the installations premises including sunday and holidays with mobile connectivity to receive instructions at installation during duty. The details of main plants/machinery/equipments/devices are as under :- (Shifts are from 0600 Hrs to 1400 Hrs, 1400 Hrs to 2200 hrs and 2200 Hrs to 0600 Hrs)
HT VCB 11 KV - 03 Nos.
Air Break switch - 05 Nos.
Transformers of cap 150 KVA-03 Nos. and 100 KVA - 01 No.
LT Panel for Transformers - 04 Nos.
APFC Panel - 04 Nos.
The following is also included in the scope of work :-
Maintaning running record on standard format of log sheet including attendence register,record of shut downs/break down (log sheet for the entirre period of contract shall be provided by the contractor.
Maintaning and upkeeping Power house and its surrounding areas neat and clean in presentable condition.
Outsourcing services for running of water supply installation and sewage installations at Harni Pump house ( ATTENDING DAY TO DAY COMPLINTS IN HARNI AREA) of GE (Army) Baroda, by deploying One FGM per shift, comprising of all plants/machinery/equipments/devices of any type, any make, any capacity inside the installations premises round the clock including sunday and holidays with mobile connectivity to receive instructions at installation during duty. The details of main plants/machinery/equipments/devices are as under :- (Shifts are 0600 Hrs to 1400 Hrs, 1400 Hrs to 2200 Hrs ) and operator will be held responsible for operating valve after switching off pumps for water distribution timely as directed by Engr-in-Charge.
Main Pump house
Centrifugal Pump 25 HP with starters - 02 Nos.
Centrifugal Pump 7.5 HP with starters - 02 Nos.
Control Panels for Pumps 440 V, 3 Phase - 02 Nos.
Under ground sump of capacity 50000 Glns- 02 Nos.
Over Head tank of capacity 50000 Gln - 01 No.
Chloronome plant gravity feed of capacity 200 gms/hour - 02 Nos.
DG Set of capacity 63 KVA for Pumps - 01 No.
Sewage Pump Hosue No. 1 (At Brigade HQ)
Submersible sewage pump 5.0 HP - 02 Nos.
LT Panel with starters 440 V, 3 Phase - 01 No.
Sewage Sump 8 mtr Deep, 4.0 mtr Dia - 01 No
Sewage Pump Hosue No. 2 (At Family qtrs)
Submersible sewage pump 7.5 HP - 02 Nos.
LT Panel with starters 440 V, 3 Phase - 01 No.
Sewage Sump 8 mtr Deep, 4.0 mtr Dia - 01 No
The following is also included in the scope of work :-
Maintaning running record on standard format of log sheet including record of running of pumps, DG set, sewage plant pumps, chloronome plants etc (log sheet for the entirre period of contract shall be provided by the contractor.
Maintaning and upkeeping Pump house/sewage installations and its surrounding areas neat and clean in presentable condition.
Notes for item No. 1 to 2
Proper handing/taking over of staff during shift change shall be carried out and in no case installation shall remain unattended. In case AGE E/M or JE E/M finds the staff absent from duty he shall endorse remarks on the log sheet which shall be treated as final and recovery shall be made at specified rate under particular specifications.
Tradesmen shall take all preventive/safety measures as per code of practice of Electricity and Indian Electricity Act 1956 (revised) as well as they shall be insured for accident as per labour laws. The Deptt will not be responsible for any type of untoward incidents.
Electrician & helper team detailed during the shift shall immediately rush to spot of fault. In the event of no Break down, both the tradesmen shall report to JE E/M for taking complaints of any nature pertaining to electric supply network/maintenance schedule at complaint cell only.
Contractor shall provide all tools viz hand gloves, discharge rod, spanner set, tool kit, tool bag, spanner, screw drivers, pipe wrench, torch light etc. Other material required for replacement and attending complaints shall be issued by department.
In case additional manpower is reqd to restore the electric supply, the same shall be provide by contractor without any extra cost to Govt.
Complaint cell/installations shall always be kept neat & clean and shall be maintained in presentable condition
It shall be the responsibility of the contractor to get aquainted and trained his staff with HT/LT supply & distribution network in their area of responsibility.
Contractor shall ensure availability and use of all safety equipments needed during work. The contractor shall solely be responsible for any accident due to non adoption of proper security measures or due to breach of safety norms.
Contractor shall ensure that no electrician/helper work for more than 48 hours in a week.
Electrician and helper shall be well qualified and experienced as under :- (a) Electrician & FGM : Two year certificates course from recognised ITI (or equivalent) in respective trade or 10th pass with three years experience of similar job. (b) Helper : Minimum 8th pass with two years experience of similar job. & shall be approved from GE before joining
First Aid box shall be provided by the contractor under his own arrangement as directed.
Proper uniform for Electrician and helper as directed shall be provided by the contractor without any extra cost.
Tradesmen passes shall be obtained from GE before joining their duties on installations. They shall be liable to show their identity card to santry or any authority in the area.
Tradesmen shall carry out normal maintenance of pump, DG set etc like tightning of nut & bolts, cleaning of equipments, battery charging, removal of leakages etc.
CENTAUR ENGINEERS
K A ELECTRIC CO
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .