| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 LAccepted-AOC | ₹9.4 L | L1 | Accepted-AOC Work order issued being L1 |
| 2 | L2₹10.4 LRejected-AOC | ₹10.4 L | L2 | Rejected-AOC being L2 |
| Sl No | Description | Qty | Unit | ROYAL RIDGE CONSTRUCTION L1 | Arise New Energy L2 |
|---|---|---|---|---|---|
| 1.00Laying of foundations for erecting of tower of 66kv Line on Labour rates Lump-Sum basic as per PSPCL drawings including excavation, placement of steel reinforcement, concreting, stub setting, form work, centering shoring, shuttering back filling and other allied works required for setting stubs including the cost of sand and gravel complete in all respects as per PWD specifications crusher & sand to be arranged by the contractor. All other material i.e. Cement, Steel, Stub Setting templates etc. shall be provided by PSPCL from its stores at Bathinda,Verpal and Gobindgarh ) free of Cost. | |||||
| 2.00 | Labour Charges involved in Stubbing of D-2 CW/DT 3010 R1 type double circuit towers | 1 | No | 22,000 ₹25,960 Lowest | 22,990 ₹27,128.2 |
| 3.00 | Labour Charges involved in Stubbing of D-30 CW/TT 3011 R1 type double circuit towers | 2 | No | 66,000 ₹77,880 Lowest | 75,134 ₹88,658.12 |
| 4.00 | Labour Charges involved in Stubbing of D-60 CW/TT 3013 R3 type double circuit towers | 4 | No | 1,68,000 ₹1,98,240 Lowest | 1,71,068 ₹2,01,860.24 |
| 5.00 | Transportation and erection of towers complete with all fittings including tack welding including all T&P (Welding Rods to be supplied by the contractor) & zinc rich paint touching wherever required (zinc paint to be supplied by the contractor) Installation of danger plates, No. plates, Phase Plates, Ckt Plates, Bird guard & Anti climbing devices etc on labour rate basis (66 KV) | 24.02 | MT | 2,04,156.06 ₹2,40,904.15 Lowest | 2,43,522.15 ₹2,87,356.14 |
| 6.00 | Transportation, Installation of Insulator Strings complete with all hardware fittings & Stringing & sagging of ACSR 0.2sq” including fixing of its all Accessories for the 66KV line on 66KV/220KV towers on labour rates basis | 0.71 | DC KM | 81,995 ₹96,754.1 Lowest | 91,194.13 ₹1,07,609.07 |
| 7.00 | Transportation, installation, Stringing & Sagging of Earth wire size 7/2.24mm at the top of tower including fixing of earth wire accessories as on labour rate basis | 0.71 | KM | 6,417 ₹7,572.06 Lowest | 7,340.34 ₹8,661.6 |
| 8.00 | Pit marking Straight Tower | 1 | No | 500 ₹590 | 490 ₹578.2 Lowest |
| 9.00 | Pit marking Angle Tower | 6 | No | 9,000 ₹10,620 | 8,820 ₹10,407.6 Lowest |
| 10.00 | Dismantlement & Re-sagging of conductor size 0.2sq'' | 1.45 | DC KM | 1,08,825 ₹1,28,413.5 Lowest | 1,16,036.47 ₹1,36,923.03 |
Tender Value
Refer Docs
EMD Value
₹21,190
Closing Date
4 May 2026, 12:00 pmClosed
Dy Chif Engineer
Room no 310 311 2nd Floor Shakti Sadan Near Khalsa College G T Road Jalandhar
66KV line Shifting of 66KV Humbran Adda Dhakha DC line within premises of MS Eldeco Green Park Infrastructure Ltd
2026_POWER_165614_1
01/PT-561/TLCJ/2026-27
Open Tender
Miscellaneous Works
Item Rate
Humbran Adda Dhakha
please refer tender document
3 documents required · 3 mandatory
₹1,180
₹21,190
Yes
11 Aug 2026
9 Apr 2026
5 May 2026
9 Apr 2026
4 May 2026
9 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Laying of foundations for erecting of tower of 66kv Line on Labour rates Lump-Sum basic as per PSPCL drawings including excavation, placement of steel reinforcement, concreting, stub setting, form work, centering shoring, shuttering back filling and other allied works required for setting stubs including the cost of sand and gravel complete in all respects as per PWD specifications crusher & sand to be arranged by the contractor. All other material i.e. Cement, Steel, Stub Setting templates etc. shall be provided by PSPCL from its stores at Bathinda,Verpal and Gobindgarh ) free of Cost. | - | - | - | - |
| 2 | Labour Charges involved in Stubbing of D-2 CW/DT 3010 R1 type double circuit towers | 1 | No | 23,459 | ₹23,459 |
| 3 | Labour Charges involved in Stubbing of D-30 CW/TT 3011 R1 type double circuit towers | 2 | No | 38,334 | ₹76,668 |
| 4 | Labour Charges involved in Stubbing of D-60 CW/TT 3013 R3 type double circuit towers | 4 | No | 47,364 | ₹1,89,456 |
| 5 | Transportation and erection of towers complete with all fittings including tack welding including all T&P (Welding Rods to be supplied by the contractor) & zinc rich paint touching wherever required (zinc paint to be supplied by the contractor) Installation of danger plates, No. plates, Phase Plates, Ckt Plates, Bird guard & Anti climbing devices etc on labour rate basis (66 KV) | 24.02 | MT | 10,346 | ₹2,48,493.95 |
| 6 | Transportation, Installation of Insulator Strings complete with all hardware fittings & Stringing & sagging of ACSR 0.2sq” including fixing of its all Accessories for the 66KV line on 66KV/220KV towers on labour rates basis | 0.71 | DC KM | 1,30,513 | ₹93,055.77 |
| 7 | Transportation, installation, Stringing & Sagging of Earth wire size 7/2.24mm at the top of tower including fixing of earth wire accessories as on labour rate basis | 0.71 | KM | 10,505 | ₹7,490.07 |
| 8 | Pit marking Straight Tower | 1 | No | 500 | ₹500 |
| 9 | Pit marking Angle Tower | 6 | No | 1,500 | ₹9,000 |
| 10 | Dismantlement & Re-sagging of conductor size 0.2sq'' | 1.45 | DC KM | 81,602 | ₹1,18,404.5 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
DNITPT561.pdf
Tender Documents • 1.56 MB
BOQ_336168.xls
BOQ • 0.30 MB
C1PT561.pdf
PDF • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].