Loading…
Loading…
Tender Value
₹10.7 Cr
EMD Value
₹10.7 L
Closing Date
29 Jun 2026, 6:00 pm7d left
Similar tender results from the same govt authority in the past 3 years.
Office Of The Executive Engineer, C.P. No.4, Block No.3, E-2 Wing, 5th Floor, Karmyogi Bhavan, Sector-10/A , Gandhinagar.
Providing and Fixing Furniture for Ch Type 448 Quarters in Sector 28 at Gandhinagar
315356
6 Of 2026-27
Open
Furniture/ Fixture
Gandhinagar
8 documents required · 8 mandatory
₹18,000
Executive Engineer, Capital Project Div. No.4, Gandhinagar
₹10.7 L
18 Jun 2026
18 Jun 2026
18 Jun 2026
29 Jun 2026
18 Jun 2026
Name of Work : Providing and fixing Furniture for ''Ch ''Type 16 Tower (Ch- Type
Quarters) in Sector 28 at Gandhinagar .
MEMORANDUM SHOWING THE ITEMS OF WORKS TO BE CARRIED OUT
ESTIMATED RATES
QUANTITIES TOTAL AMOUNT
QUANTITIES TOTAL AMOUNT
IT. ESTIMATED BUT ACCORDING TO
ITEMS OF WORK UNIT
NO MAY BE MORE IN FIGURE INWORDS ESTIMATED
OR LESS QUANTITIES
Providing and fixing modular wardrobe with loft using 16–18 mm thick calibrated
BWR grade plywood conforming to IS 710, complete as per approved drawings and
Engineer-in-Charge instructions. All exposed inner faces and niche openings finished
with 0.8 mm laminate, and shutters finished on both sides with high-pressure
decorative laminate (HPL). Shutters and panels bonded using marine grade adhesive,
ensuring smooth, even and aligned finish. All exposed edges sealed with 1 mm thick Rupees Nine
PVC edge banding using automatic edge banding machine with pre-milling process. Thousand Five
1 7,380.00 Smt Shutters fixed with auto-closing concealed hinges with clip-on mechanism and full 9,545.17 Hundred Forty-Five Smt
adjustability for proper alignment. Including all hardware such as SS handles, and Paise Seventeen
magnets, fasteners, door straighteners and accessories of approved make. Complete Only
fabrication, supply and installation including adhesives, labour, tools, transport and
finishing, ensuring level, aligned and defect-free work. Measurement in sqm of front
elevation area, complete in all respects as per specifications and approved design.
Providing and fixing modular kitchen cabinet work, constructed using 16–18 mm
thick calibrated BWR grade plywood conforming to IS 710, including partitions,
shelves, 5- drawer components, finished with 0.8 mm thick decorative laminate on
external surfaces and 0.8 mm thick non-decorative laminate on internal surfaces. All
exposed edges shall be sealed with PVC edge banding of approved make. The work Rupees Thirty
shall include providing and fixing tandem drawer systems (including standard and Thousand Four
2 1,210.00 pot & pan units) of approved make list, along with heavy-duty concealed hinges, 30,432.09 Smt
Hundred Thirty-Two
stainless steel handles, and all necessary hardware fittings. Drawers and shutters shall
and Paise Nine Only
be properly aligned and finished with smooth operation. The item shall include all
fixtures, fasteners, adhesives, labour, fabrication, transportation, installation,
wastage, and complete finishing as per approved drawings and instructions of the
Engineer-in-Charge.
Rupees Ten Crore Seventy-Two Lakh Sixty-Six Thousand One Hundred Eighty-Three and Paise Fifty Only
I/ We am/ are willing to carry out the work at __________ % above / below (should be written in figures and words) below / above the tenders rates sanctioned above of my
works put as under:
*Estimated Amount put to *Estimated Amount put to
Tender Rs.10,72,66,183.5 Tender Rs.10,72,66,183.5
Deduct Rs. _________Below Add Rs. _________Above
Total Rs. _ ________ Total Rs. __________
1 All work shall be carried out as per Public Works Department Handbook and other spcifications of Division or as directed.
2 All the columns in Schedule - B should be filled in ink and the total of the entries in the last column should be struck by the contractor under his signature.
3 Rates quoted include clearance of site (prior commencement of work and at its close) in all respects and hold good for work under all conditions, site, moisture, weather etc.
4 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra payment shall be made.
5 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
6 GST and Income tax TDS will be deducted at a source while making payments of bills
7 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated
in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost of difference of cement consumption have been deducted from the rate of
original item at the rate of input rate mentioned in all the tender.
Dated signature Deputy Executive Engineer Executive Engineer,
of the Contractor Capital Project Sub Division:17 Capital Project Division No-4
Gandhinagar Gandhinagar
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
NIT.pdf
SBD.pdf
BOQ.pdf
Technical Specifications.pdf
Make List.pdf
PQ.pdf
1 GRs - Buildings.pdf
Download all tender documents and submit your bid