| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAdmitted-Fee/PreQual/Technical/Finance | ₹3.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.4 L+₹1,180.68 (0.35%)Admitted-Fee/PreQual/Technical/Finance | ₹3.4 L+₹1,180.68 (0.35%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.4 L+₹1,218.22 (0.36%)Admitted-Fee/PreQual/Technical/Finance | ₹3.4 L+₹1,218.22 (0.36%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | JEEVA CONSTRUCTION L2 | RATHEESH R L3 | SURESH KUMAR V L1 |
|---|---|---|---|---|---|---|
| 1.00Maruthamangalathukaavu Keezhattoor ela thod sidewall | ||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 9.18 | cum | 323.78 ₹2,972.3 | 323.82 ₹2,972.67 | 322.67 ₹2,962.11 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1.84 | cum | 7,140.39 ₹13,109.76 | 7,141.19 ₹13,111.22 | 7,115.8 ₹13,064.61 Lowest |
| 1.00 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 58.14 | sqm | 755.72 ₹43,937.56 | 755.81 ₹43,942.79 | 753.12 ₹43,786.4 Lowest |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 797.97 | kilogram | 101.2 ₹80,754.77 | 101.21 ₹80,762.75 | 100.85 ₹80,475.48 Lowest |
| 1.00 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 26.16 | cum | 7,713.08 ₹2,01,797.31 | 7,713.94 ₹2,01,819.81 | 7,686.52 ₹2,01,102.42 Lowest |
Tender Value
₹3.8 L
EMD Value
₹9,515
Closing Date
18 Aug 2026, 10:00 amClosed
ASSISTANT ENGINEER
OFFICE OF THE ASSISTANT ENGINEER
Maruthamangalathukaavu Kezhattoor Ela Thodu-Side protection
2026_LSGD_833217_14
AE/LIDEW/EDML/FEB/26
Open Tender
Civil Works - Roads
Item Rate
180 days
EDAMULACKAL
Please refer Tender documents.
7 documents required · 7 mandatory
₹840
Yes
₹9,515
Yes
21 Aug 2026
7 Aug 2026
19 Aug 2026
7 Aug 2026
18 Aug 2026
7 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Maruthamangalathukaavu Keezhattoor ela thod sidewall | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1 | cum | - | - |
| 1.002 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.003 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | - | sqm | - | - |
| 1.004 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 0.8 | kilogram | - | - |
| 1.005 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
stage.html
html • 0.02 MB
finance_1462844.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.20 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.25 MB
PA.pdf
Tender Documents • 0.26 MB
FOT.pdf
Tender Documents • 0.25 MB
AFF.pdf
Tender Documents • 0.24 MB
SBD.pdf
Tender Documents • 1.73 MB
BOQ_1462844.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .