Tender Value
₹8.4 L
EMD Value
₹8,360
Closing Date
11 Sept 2026, 6:00 pm
Chief Officer, Una Nagarpalika, Una
PROPOSED CREMATORIUM SHED AT MOHANSUKHDHAM FOR UNA NAGARPALIKA, AT UNA, DIST. GIR-SOMNATH
339510
UNANP/CREMATORIUM/T 41/R00
Open
Civil Works - Buildings
Works
Gir Somnath
3 documents required · 3 mandatory
₹900
Chief Officer, Una Nagarpalika, Una
₹8,360
27 Aug 2026
27 Aug 2026
27 Aug 2026
11 Sept 2026
27 Aug 2026
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges, after deducting
the cost of material proposed in scheduled-A at basic rate. One percent labour cess will be deducted from contractor’s bill.
I/ We am/are willing to
the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender : Estimated amount put to tender :
Signature of contractor Chief Officer
RANAVAV NAGARPALIKA
SCHEDULE NAME OF WORK Amount
1) All the work shall be carried out as per MOST specification and specification on the division or as directed.
Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for
2) under all conditions, site moisture weather etc.
In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design
then the difference in consumption of cement shall be deducted from the rate of original item valued at the star rate as
mentioned in tender. However no extra payment shall be made for use of additional Quantity of cement as per actual
concrete mix design. Concrete mix design shall be done in GERI laboratory only.
The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification
4) and details of work and amount involved at site without any payment as directed by the Engineer in charge.
Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for
5) testing shall be paid by the Executive Engineer and 1% of the (one percent) of amount put to tender after shall be recovered
from the running account bills of the works. (As per G.R. (R&B) Deptt., No. TNC/1085/4/C dtd. 20.12.91.
6) The contractor shall quote even "NIL" if no reduction is proposed.
One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS".
7) In terms of the Gujarat Government Gazette Extra ordinary dated 12.12.04. Implementation of building and other
construction workers regulation of equipments and conditions of service Act-1996)
8) Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
9) The contractor is solely responsible to bare all applicable taxes. Excluding GSt
10) GSt Will Be Paid Extra As Applicable Rates
Signature of contractor Chief Officer
RANAVAV NAGARPALIKA
UNA NAGARPALIKA
Name of Project : Proposed Crematorium Shed at Mohansukhdham for Una Nagarpalika, at Una, Dist. Gir-
NAME OF WORK: Proposed Crematorium Shed at Mohansukhdham for Una Nagarpalika, at Una, Dist. Gir-
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but according to
may be more in Figure in Words estimated
or less quantities.
1 Excavation for foundation up to 1.5 Meter depth including Rupees One Hundred
sorting out and stacking of useful materials and disposing of Twenty Eight and Seventy
excavated stuff up to any Lead (A) For Loose or Soft soil Nine Paise
Excavation for foundation up to 1.5 Meter depth including Rupees One Hundred Sixty
2 sorting out and stacking of useful materials and disposing of Four and Sixty Four Paise
19.00 excavated stuff up to 50 Meter lead (B) For Dense or Hard soil 164.64 Cum
Excavation for foundation up to 1.5 Meter depth including Rupees Two Hundred
3 sorting out and stacking of useful materials and disposing of Eighty One and Seventy
6.00 excavated stuff up to any lead (B) Hard Murrum 281.73 Three Paise Cum
Filling available excavated earth (excluding rock) in trenches, Rupees One Hundred
plinth, sides of foundations etc. in layers not exceeding 20 Thirty Seven and Forty
cm. In depth consolidating each deposited layer by ramming Seven Paise
143.60 and watering 137.47 Cum
Filling in foundation and plinth with murrum or selected soil in Rupees Three Hundred
5 layers of 20 cm thickness including watering, ramming and Seven and Forty One Paise
215.40 consolidating etc. complete. 307.41 Cum
Providing and laying cement concrete 1:2:4 (1- cement : 2- Rupees Three Thousand
coarse sand : 4- graded stone aggregate 20 mm. Nominal Eight Hundred Forty Two
size) and curing complete excluding cost of form work in : (a) and Ninety One Paise
13.70 Foundation and plinth 3842.91 Cum
Providing laying Controlled cement concrete M-200 and curing Rupees Four Thousand Two
complete including the cost of form work and excluding cost Hundred Seventy Three
of reinforcement for reinforced concrete work in : RCC Column and Thirty One Paise
8.90 Footings 4273.31 Cum
Providing laying Controlled cement concrete M-200 and curing Rupees Four Thousand
complete including the cost of form work and excluding cost Seven Hundred Seventy
of reinforcement for reinforced concrete work in : RCC Column and Twenty Three Paise
1.10 up to Plinth Lvl. 4770.23 Cum
Providing laying Controlled cement concrete M-200 and curing Rupees Six Thousand
complete including the cost of form work and excuding cost of Seven Hundred Eighty and
reinforcement for reinforced concrete work in : RCC Plinth Thirteen Paise
3.30 beams 6780.13 Cum
Providing and laying controlled cement concrete M200 and Rupees Eleven Thousand
curing complete including the cost of formwork and excluding Eighty Four and Seventy
cost of reinforcement for reinforced concrete work in (B) Five Paise
1.20 Walls, from top of foundation level upto floor two level 11084.75 Cum
Providing TMT Bar FE 500D reinforcement for R.C.C. work Rupees Seventy Seven and
11 including bending, binding and placing in position complete Twenty Nine Paise
1436.70 upto floor two level 77.29 Kg.
Providing and Fixing M.S. round holding down or anchor bolts Rupees Fifty Five and Sixty
12 with nuts and washer plates complete Paise
Steel work welded in built up sections framed work including Rupees Nine Thousand One
cutting, hoisting fixing in position and applying a priming coat Hundred Eight and Forty
of red lead paint. (A) In beams and joists, channels angles Eight Paise
Tees, flats, with connecting plates or angle cleats as in main
and cross beams. Hip and jack rafters, purlins connected to Quin
14.10 common rafter and the like 9108.48 .
Structural Steel work (Confirming to IS 4923-1997) riveted, Rupees One Hundred
bolted or welded in builtup for all type sections, in framed Thirty One and Eighty
work, including cutting, hoisting, fixing in position and Three Paise
14 applying a primimng coat of approved steel primer all
complete as per the structural designs of Engineer in charge.
Steel work welded in built up sections framed work including Rupees Ten Thousand Four
cutting, hoisting fixing in position and applying a priming coat Hundred One and Four
15 of red lead paint. Paise
(D) In trusses and trussed purlins, up to 25m. span and 15m. Quin
20.70 overall height 10401.04 .
Providing and Fixing 20 mm thick Cement roofing sheet fixed Rupees One Thousand Four
16 with screw Sheet Size - 1050 mm x 2250 mm etc complete as Hundred Forty One and
17.00 directed by Engineer in charge. 1441.9 Ninety Paise Nos
Providing and fixing of wall ceiling and floor 10.0 kg. F/cm2 Rupees Three Hundred
working pressure polythene pipes of the following outside dia. Thirty Nine and Five Paise
17 Low density, complete with special flange compression type
fittings, wall clips etc. including making good the wall ceiling
18.40 and floor. (G) 110mm 339.05 m
Painting two coats (excluding priming coat) on new steel and Rupees Ninety Six and Fifty
other metal surface with enamel paint, brushing, interior to Nine Paise
18 give an even shade including cleaning the surface an even
shade including cleanicn the surface of all dirt, dust and other
foreign matter.
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges,
after deducting the cost of material proposed in scheduled-A at basic rate. One percent labour cess will be deducted from contractor’s
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________%
(should be writtern in figure and words)
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender : Estimated amount put to tender :
Signature of contractor Chief Officer
UNA NAGARPALIKA
1) All the work shall be carried out as per MOST specification and specification on the division or as directed.
2) Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for under all
conditions, site moisture weather etc.
3) In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design then the difference
in consumption of cement shall be deducted from the rate of original item valued at the star rate as mentioned in tender. However no extra
payment shall be made for use of additional Quantity of cement as per actual concrete mix design. Concrete mix design shall be done in GERI
laboratory only.
4) The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification and details of
work and amount involved at site without any payment as directed by the Engineer in charge.
5) Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for testing shall be paid
by the Executive Engineer and 1% of the (one percent) of amount put to tender after shall be recovered from the running account bills of the
works. (As per G.R. (R&B) Deptt., No. TNC/1085/4/C dtd. 20.12.91.
6) The contractor shall quote even "NIL" if no reduction is proposed.
7) One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the
Gujarat Government Gazette Extra ordinary dated 12.12.04. Implementation of building and other construction workers regulation of
equipments and conditions of service Act-1996)
8) Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
9) The contractor is solely responsible to bare all applicable taxes. E.X. GST etc. and department will not entertain any contractor representation
to reimburse any financial burden due to applicable taxes :E.X.. GST etc. (GST Will BE paid Extra)
Signature of contractor Chief Officer
UNA NAGARPALIKA
UNA NAGARPALIKA
Name of Project : Proposed Crematorium Shed at Mohansukhdham for Una Nagarpalika, at Una, Dist. Gir-
NAME OF WORK: Proposed Electrical Work for Crematorium Shed at Mohansukhdham for Una Nagarpalika, at
Una, Dist. Gir-Somnath
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but according to
may be more in Figure in Words estimated
or less quantities.
1 Point wiring for Light / Bell with 2-1.5 sq.mm & earth wire
of 1.5 sqmm (Green) both are of ISI marked 1.1 KV grade
FRLS PVC insulated multi strand copper wires up to 10 mtr
length , in below type of pipe erected with 6A Modular type
switch / bell push & accessories and earth continuity of
following type, erected on PVC / Metallic/Wooden box, single
mounting base frame covered with textured/metallic/white
front plate modules erected on / in wall / ceiling as per pipe
erected, with necessary Lamp holder/ceiling rose /
H.D.Connector as directed.
(f) with medium class Rigid PVC pipe and accessories erected Rupees Five Hundred
concealed in wall/ceiling complete Eighty Two and Seventy
12.00 582.77 Seven Paise Pt.
Point wiring for on board Looped Plug with 6A Modular type Rupees Three Hundred
switch & 5 pin socket erected on PVC / Metallic / Wooden box, Nine and Six Paise
2 single mounting base frame covered with textured / metallic /
white front plate modules erected on / in wall / ceiling with
following type accessories
Providing and erecting Mains with 1.1 KV grade FRLS PVC
insulated ISI marked stranded Copper conductor wire in
following type of pipe to be erected concealed in /flushed on
3 wall/ceiling, with 1.5 sq. mm copper conductor FRLS PVC
insulated stranded wire of green colour for earth continuity of
following size.
(A) With medium class Rigid PVC pipe and accessories
(b) 2 wire 2.5 sq. mm Rupees One Hundred Four
120.00 104.03 and Three Paise Mtr.
Supplying and erecting LED indoor fittings with LEDs of
wattage 0.2 Watt to 0.5 Watt assembled on single MCPCB,
with housing used as a heat sink shall be made of thick sheet
Steel conforming to IS: 513 / CRCA / aluminium die cast
powder coated and high U.V. & corrosion resistance with
diffuser with company mark/name 160V to 270V, Power
4 Factor more than 0.9, THD < 15%, CCT 3000 K to 6500K,
Luminaire efficacy > 85 lumens / watt, LED driver efficiency >
85 % (fitting required LM - 79 & LM - 80 Certificates (NOTE :
Below description have shown ranges of Wattage capacity of
LED fittings. The Engineer incharge may select any wattage
capacity between the ranges shown.)
(A) Tube Light with integral driver
(iv) 22-24 Watts, Surge - 2KV, IP - 20, conventional 4 feet Rupees Three Hundred
Seventy Three and Seventy
8.00 373.7 Paise Ea.
Providing Approved make Triple Pole Metal / Iron Clad Switch Rupees One Thousand Nine
& Fuse with neutral link 415/500 V confirming to IS (a)63A Hundred Seventy Seven
5 and Fifty Eight Paise
Erection & connection Charges for 63A/100A TP as following Rupees One Hundred
(b) Erection on angle iron frame duly painted with Red Oxide Thirty Four and Thirty
providing and erecting Miniature circuit breaker single pole 6A Rupees One Hundred
to 25A suitable to operate on 240 V A.C. system and having Twenty Three and Twenty
7 breaking capacity 10 KA to be erected in existing box. Two Paise
confirming to IS 8828/1996 with ISI Mark
Making trench in soft soil of suitable width of 90 cm deep for Rupees Fifty Five and Fifty
laying cable or locating the fault all over the run and back Five Paise
filling the same and making the surface as normal ground.
Providing & laying approved make Double walled corrugated Rupees Sixty Two and
pipes (DWC) of polyethylene (conforming to IS 14930 II ) Sixty Two Paise
9 with necessary connecting accessories of same material at
required depth in existing trench for laying of cable. below
100.00 ground / road surface for enclosing cable 62.62 Mtr.
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges,
after deducting the cost of material proposed in scheduled-A at basic rate. One percent labour cess will be deducted from contractor’s
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________%
(should be writtern in figure and words)
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender : Estimated amount put to tender :
Signature of contractor Chief Officer
UNA NAGARPALIKA
1) All the work shall be carried out as per MOST specification and specification on the division or as directed.
2) Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for under all
conditions, site moisture weather etc.
3) In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design then the difference
in consumption of cement shall be deducted from the rate of original item valued at the star rate as mentioned in tender. However no extra
payment shall be made for use of additional Quantity of cement as per actual concrete mix design. Concrete mix design shall be done in GERI
laboratory only.
4) The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification and details of
work and amount involved at site without any payment as directed by the Engineer in charge.
5) Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for testing shall be paid
by the Executive Engineer and 1% of the (one percent) of amount put to tender after shall be recovered from the running account bills of the
works. (As per G.R. (R&B) Deptt., No. TNC/1085/4/C dtd. 20.12.91.
6) The contractor shall quote even "NIL" if no reduction is proposed.
7) One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the
Gujarat Government Gazette Extra ordinary dated 12.12.04. Implementation of building and other construction workers regulation of
equipments and conditions of service Act-1996)
8) Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
9) The contractor is solely responsible to bare all applicable taxes. I.e. GST etc. and department will not entertain any contractor representation
to reimburse any financial burden due to applicable taxes : i.e. GST etc.
Signature of contractor Chief Officer
UNA NAGARPALIKA
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01 SBD.pdf
02 Mile Stone Dates and Tender Nivida.pdf
03 Schedule-B.pdf
04 Qualification Criteria.pdf
05 Material Testing Schedule.pdf
06 Specification Index.pdf
07 Details of Work.pdf
08 ELECTRIC SPECIFICATION.pdf
09 ROAD WORK SPECIFICATIONS.pdf
10 Paripatra.pdf
11 BUILDING SPECIFICATIONS.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].