Loading…
Loading…
Tender Value
₹2.6 L
EMD Value
₹5,130
Closing Date
29 Jul 2026, 5:00 pm4d left
EE CHAUNTRA
EE JSD CTR
Restoration of rain damages of FIS Ner Majharnoo Kuhl in Tehsil Joginder Nagar Distt Mandi HP SH Laying jointing testing of 160 mm PE 80 PN 4.0 80 Tmt and CO 08 Nos RCC intake chamber
2026_HPIPH_139485_1
EE-CTR-TA-5139-88 dated 17.07.2026-15
Open Tender
Pipe Laying Works
Item Rate
90 days
Joginder Nagar
Please refer Tender documents.
6 documents required · 6 mandatory
₹350
EE CHAUNTRA
₹5,130
20 Jul 2026
20 Jul 2026
30 Jul 2026
20 Jul 2026
29 Jul 2026
20 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation and trenches in earth work,lifts up to 1.50 meters atacking the excavated soil not more than 3 meters clear from the edge of the excavation and then returning the stacking soil in 15cm .layers, when required in to plinths sides of foundations etc, consolidating each deposted layer by ramming and watering and then deposing of all surplus excavated earth as directed with in a lead of 20 metres in all respect with in all leads and lifts as per the direction of Engineer-in-Charge. | 46.64 | Nos | - | - |
| 2Laying and jointing of HDPE pipes with butt fusion welding and testing conforming to IS- 4984-2016 with latest ammendments of following dia meters including all type of fittings like tee, bends, pieces etc.(Earth work in trenches to be measured and paid for separately) complete in all respect with in all leads and lifts as per the direction of Engineer-in-charge. | |||||
| 2.01 | 160 mm dia PN 4.0 , PE -80 | 80 | Rmt | - | - |
| 3 | Providing and laying cement concrete 1:4:8(1cement:4sand:8graded stone aggregate of 40mm nominal size)and curing complete excluding cost of form work including all leads and lifts: a) Foundation and Plinth. | 3.04 | Cum | - | - |
| 4Providing and laying cement concrete 1:1.5:3 (1cement:1.5 sand : 3graded stone aggregate 20 mm nominal size)and curing complete excluding cost of form work and re-inforcement for reinforced concrete work in:- | |||||
| 4.01 | In Base | 2 | Nos | - | - |
| 4.02 | In wall | 5.52 | Cum | - | - |
| 5 | Providing &Laying mild /tor steel reinforcement for RCC. work including bending, binding and placing in position complete up to floor two level including all leads and lifts. | 672 | Kg | - | - |
| 6Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish I/c centring,shuttering,strutting and propping etc.with wooden battens and ballies,height of propping and centring below supporting floor to ceiling not exceeding 4mtrs.and removal of the same for insitu-reinforced concrete & plain concrete work in:- | |||||
| 6.01 | Vertical surfaces such as walls (any thickness & shape), partitions and the like including attached pillasters, buttress,plinth and string courses and the like. | 86.08 | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
Form6.pdf
Tender Documents • 0.44 MB
Form8.pdf
Tender Documents • 1.13 MB
Condition.pdf
Tender Documents • 0.59 MB
BOQ_206770.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].