| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 CrAccepted-AOC | ₹6.8 Cr | L1 | Accepted-AOC 1ST LOWEST BIDDER |
| 2 | L2₹7.0 Cr+₹23.9 L (3.52%)Rejected-Finance | ₹7.0 Cr+₹23.9 L (3.52%) | L2 | Rejected-Finance Being 2nd lowest bidder |
| 3 | L3₹8.2 Cr+₹1.5 Cr (21.5%)Rejected-Finance | ₹8.2 Cr+₹1.5 Cr (21.5%) | L3 | Rejected-Finance Being 3rd lowest bidder |
| Sl No | Description | Qty | Unit | MS SUSHIL KUMAR CONTRACOR L1 | M/s Innovative Coolings and Constructions L2 | Sachdeva Builders L3 |
|---|---|---|---|---|---|---|
| 1.00SCHEDULE `A' PART - I (Building Works) is not prepriced by MES and prepriced rates indicates 0.0 under column 6 signified this fact only. | ||||||
| 1.01 | Construction of married accn for SGT and below three storey (G+2) block of 06 Qtrs complete all as specified and as shown on drawings. | 5 | Each block | 87,00,000 ₹4,35,00,000 Lowest | 94,50,000 ₹4,72,50,000 | 1,10,19,969 ₹5,50,99,845 |
| 1.02 | Construction of garrages for block of three (03) cars and three (03) scooter single storey including ramp complete all as specified and as shown on drawings. | 5 | Each block | 10,10,000 ₹50,50,000 | 8,50,000 ₹42,50,000 Lowest | 9,87,000 ₹49,35,000 |
| 1.03 | Construction of service toilet single storey complete all as specified and as shown on drawings. | 1 | Each block | 5,00,000 ₹5,00,000 | 3,50,000 ₹3,50,000 Lowest | 3,69,000 ₹3,69,000 |
| 1.04 | Construction of pump house building complete all as specified and as shown on drawings. | 1 | Each block | 3,00,000 ₹3,00,000 Lowest | 3,50,000 ₹3,50,000 | 4,69,000 ₹4,69,000 |
| 1.05 | Construction of under ground sump, 25000 ltr capacity complete all as specified and as shown on drawings. | 1 | Each | 1,00,000 ₹1,00,000 Lowest | 8,25,000 ₹8,25,000 | 9,69,000 ₹9,69,000 |
| 2.00NOTE: Schedule ‘A’ Part II to XVI under Ser No 2.01 to 2.15 are Prepriced by MES. | ||||||
| 2.01 | Lump sum price worked out by the Contractor for “SITE CLEARANCE, EXCAVATION AND EARTH WORK” as listed in Schedule ‘A’ Part II | 1 | Lump sum | 6,00,000 ₹6,00,000 Lowest | 7,26,225.46 ₹7,26,225.46 | 6,77,869 ₹6,77,869 |
| 2.02 | Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part III | 1 | Lump sum | 5,00,000 ₹5,00,000 | 4,95,990.91 ₹4,95,990.91 Lowest | 6,73,569 ₹6,73,569 |
| 2.03 | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION SUPPLY" as listed in Schedule ‘A’ Part IV | 1 | Lump sum | 30,00,000 ₹30,00,000 Lowest | 35,20,257.61 ₹35,20,257.61 | 33,70,969 ₹33,70,969 |
Tender Value
₹6.5 Cr
EMD Value
₹6.5 L
Closing Date
22 Jul 2026, 6:00 pmClosed
CE (AF) WAC PALAM
HQ CE (AF) WAC PALAM DELHI CANTT-10
PROVN OF DEFICIENT MD ACCN FOR AIRMEN AT AF STN HALWARA
2026_MES_766697_1
CEWAC/HAL/T-05/2026-27
Open Tender
Civil Works
Lump-sum
900 days
GE (P) (AF) HALWARA
Please refer Tender documents.
9 documents required · 9 mandatory
₹3,000
GE (P) (AF) HALWARA
₹6.5 L
Yes
18 Aug 2026
17 Jun 2026
24 Jul 2026
17 Jun 2026
22 Jul 2026
15 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SCHEDULE `A' PART - I (Building Works) is not prepriced by MES and prepriced rates indicates 0.0 under column 6 signified this fact only. | |||||
| 1.01 | Construction of married accn for SGT and below three storey (G+2) block of 06 Qtrs complete all as specified and as shown on drawings. | 5 | Each block | - | - |
| 1.02 | Construction of garrages for block of three (03) cars and three (03) scooter single storey including ramp complete all as specified and as shown on drawings. | 5 | Each block | - | - |
| 1.03 | Construction of service toilet single storey complete all as specified and as shown on drawings. | 1 | Each block | - | - |
| 1.04 | Construction of pump house building complete all as specified and as shown on drawings. | 1 | Each block | - | - |
| 1.05 | Construction of under ground sump, 25000 ltr capacity complete all as specified and as shown on drawings. | 1 | Each | - | - |
| 2.01 | Lump sum price worked out by the Contractor for “SITE CLEARANCE, EXCAVATION AND EARTH WORK” as listed in Schedule ‘A’ Part II | 1 | Lump sum | 9,68,300.61 | ₹9,68,300.61 |
| - | Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part III | 1 | Lump sum | 5,22,095.7 | ₹5,22,095.7 |
| - | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION SUPPLY" as listed in Schedule ‘A’ Part IV | 1 | Lump sum | 39,11,397.34 | ₹39,11,397.34 |
| - | Lump sum price worked out by the Contractor for “ROAD, PATH AND CULVERT" as listed in Schedule ‘A’ Part V | 1 | Lump sum | 35,50,097.49 | ₹35,50,097.49 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_865534.xls
BOQ • 0.68 MB
Tender.pdf
Tender Documents • 13.37 MB
DRWGS.pdf
Additional Documents • 20.34 MB
Corrigendum01.pdf
PDF • 12.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .