Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.8 LAccepted-Finance AT MIRJAPUR SADANANDAPUR KABIRPUR DIST JAJPUR PIN 751009 | JAJPUR | JAJPUR | ODISHA | 751009 | ₹11.8 L | 1 | Accepted-Finance Qualirfy |
| 2 | 2₹12.0 LAccepted-Finance AT PO BAKAL HATTING PHED ROAD BARBIL DIST KEONJHAR 758035 | KENDUJHAR | ODISHA | 758035 | ₹12.0 L | 2 | Accepted-Finance Qualirfy |
Tender Value
₹11.8 L
EMD Value
₹11,900
Closing Date
11 May 2026, 5:00 pmClosed
BLOCK DEVELOPMENT OFFICER.
BLOCK OFFICE JODA OF KEONJHAR DIST.
CONSTRUCTION OF LAC BUILDING AT BALADA.
2026_PRBJO_128354_2
Online Bid ID NO. 01-JODA (KJR/2026-2027)
National Competitive Bid
Civil Works - Buildings
Percentage
180 days
JODA BLOCK OF KEONJHAR DIST.
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹11,900
Yes
17 Aug 2026
27 Apr 2026
12 May 2026
27 Apr 2026
11 May 2026
27 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation of foundation in hard soil or gravelly soil except sheet rock requiring blasting to proper profile with all leads, lifts and delifts to proper section and profile including dressing and levelling the bed upto required depth and making it fit for laying concrete and depositing the excavated materials away from the work site with all leads and lifts including dewatering if necessary from foundation etc. complete as directed by Engineer-in-Charge. | 36.71 | One Cubic Meter | 274.15 | ₹10,062.95 |
| 2 | Filling in foundation and plinth with sand, watered and rammed including cost, conveyance & royalty of materials with labour and T&P required for the work etc. complete as directed by Engineer-in-Charge. | 33.05 | One Cubic Meter | 1,768.83 | ₹58,463.8 |
| 3 | Cement concrete of proportion (1:3:6) with 40mm & down graded size hand broken H.G. metal for foundation concrete approved quality from approved quarry including hoisting, lowering and laying concrete to the required level ramming, watering, curing etc. complete as directed by Engineer-in-Charge. | 9.65 | One Cubic Meter | 7,182.4 | ₹69,288.93 |
| 4 | Brick work with Fly Ash Bricks in cement mortar (1:6) in Substructure of size 9"x5"x3" having crushing strength not less than 75 kg/cm² with dimensional tolerance ± 8% including splays cutting circular moulding chamfering and corbelling and similar such type of works with all necessary projections watering and curing after immersing the bricks in water at least for six hours before use including cost, conveyance & royalty of materials with labour charges etc. complete as directed by Engineer-in-Charge. | 12.72 | One Cubic Meter | 5,801.7 | ₹73,812.9 |
| 5 | Brick work with Fly Ash Bricks in cement mortar (1:6) in Superstructure of size 9"x5"x3" having crushing strength not less than 75 kg/cm² with dimensional tolerance ± 8% including splays cutting circular moulding chamfering and corbelling and similar such type of works with all necessary projections watering and curing after immersing the bricks in water at least for six hours before use including cost, conveyance & royalty of materials with labour charges etc. complete as directed by Engineer-in-Charge. | 20.89 | One Cubic Meter | 5,839.61 | ₹1,21,985.72 |
| 6 | RCC M-20 work with cement concrete with crushed granite 20mm down grade course aggregate of approved quality mixing by concrete mixer including hoisting, lowering and laying the concrete in position to proper slope and level and compacting by Vibrators in layers .not exceeding 0.15m depth including watering, curing for required period 28 days, centering & shuttering and finishing exposed surface smooth providing grooves whereever necessary including cost, conveyance, royalty and other taxes of all materials etc. complete as directed by Engineer-in-Charge.
Column base | 4.96 | One Cubic Meter | 7,610.06 | ₹37,714.67 |
| 6.01 | plinth band | 2.7 | One Cubic Meter | 8,490.55 | ₹22,909.44 |
| 6.02 | Column upto p/l | 2.47 | One Cubic Meter | 16,509.58 | ₹40,716.38 |
| 6.03 | Lintal Beam | 1.7 | One Cubic Meter | 15,008.3 | ₹25,517.11 |
| 6.04 | Chajja & All | 8.27 | One Cubic Meter | 1,294.6 | ₹10,705.72 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_588424.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.93 MB
DTCN_LAC.pdf
Tender Documents • 16.10 MB
BOQ_588424.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].