Loading…
Loading…
Tender Value
₹36.2 L
EMD Value
₹36,156
Closing Date
22 Jun 2026, 3:30 pmClosed
HOD M and S and Contracts
HOD M and S and Contracts BIOM Bacheli Complex
Replacement Covering and removing of heavy duty Tarpaulin sheets on Primary Stockpile PSP for 3 months period to safeguard during Monsoon season at Deposit 5 Mine
2026_NMDC_842398_1
ET/206
Limited.
Miscellaneous Services
Item Rate
90 days
Bacheli
As per NIT
2 documents required · 2 mandatory
₹0
₹36,156
Yes
22 Jun 2026
20 Jun 2026
22 Jun 2026
20 Jun 2026
22 Jun 2026
20 Jun 2026
Work of Covering and removing of heavy-duty tarpaulin sheets on Primary Stockpile (PSP) to safeguard during Monsoon period at Deposit-5 mine.
Supply of tarpaulin (1700010671) Specification Tarpaulin material : HDPE, gsm/thickness (micron): 200, duty: heavy, size: 135'×60', additional information: made out of virgin material, both side laminated, rust resistant eyelets (aluminum) placed at all sides at a gap of 2' feet, rope reinforced on all edges, UV stabilized, 100% water proof, high tear & tensile strength, confirming to is: 7009:2011 or latest is specification.
Supply of rope (1700010672) Specification Rope 8 MMx33.3 M polypropylene 1060Rope diameter: 8 MM, runnage (mtr/kg): 33.3, material: polypropylene, breaking strength min (kgf): 1060, additional information: made out of virgin material, confirming to iso:9002.
supply of bags (1700010670) specification Bag material: HDPE, gsm/thickness (micron): 200 gsm, duty: heavy, size: 18"×24", additional information: made out of virgin material, one side open, UV stabilized, 100% water proof, confirming to be 7903:2011 or any latest revision.
Total Amount
Gross Total Amount
Prices must be filled in the exact same format as given above. Any variation in format, description, unit, quantity or T&C, if noticed, may lead to rejection of the bid.
In case of discrepancy between rates and amount quoted above, the quoted rates shall prevail and appropriate corrections shall be made by corporation during evaluation.
Adjustments made by the Corporation as a part of Correction of Errors in the quoted BOQ, shall be final and binding upon the bidders. If a bidder does not except the corrected calculation, their bid shall be rejected.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.25 MB
NIT.pdf
Tender Documents • 2.25 MB
BOQ.xls
Additional Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .